The Boston Public Improvement Commission (PIC) is the owner and regulator of the City's rights of way. The PIC plays an integral role in the City's development and permitting process. From the restaurant that wants to add a seasonal cafe on the public sidewalk, to the developer who wants to construct an underground parking garage for a new housing development, or the homeowner who wants to add an architectural feature to a house that juts into the public space, each must seek approval from the PIC to have its private venture occupy public space, either permanently or on a licensed basis.
A
B
C
D
A
F
A
A
B
H
A
So
moved.
Thank
you.
Thank
you.
Moving
on
to
our
public
hearing.
Our
first
item
is
on
the
joint
petition
by
Fenway
Center
owner
1-2,
LLC
BCH,
819,
Beacon,
Street
LLC,
and
the
message
Department
of
Transportation,
the
widening
and
relocation
of
the
existing
right-of-way
lines
of
Beacon
Street,
a
public
way
and
Boston
Proper,
located
on
at
southeast
side
generally
at
address
numbers,
771,
775
and
819
825
in
east
and
west
and
Maitland
Street.
J
Commissioners
is
Kevin
Wright
from
VHB
I'm
here
with
Kevin
Daly,
representing
the
ownership
team
I'm
also,
we
are
with
us
in
the
crowd
mark
Boyle
from
MassDOT
at
Bob,
Bailey
from
Children's
Hospital
and
mark
youngins
from
VHB
as
well,
we're
here
to
present
the
widening
of
relocation
for
the
Beacon,
Street
Maitland
and
Mountford
intersection.
As
we
stated
at
the
new
business
here,
and
this
is
in
order
to
install
new
signals
at
the
intersection
that
we've
coordinated
the
last
year
with
BTD.
J
J
Which
I
have
highlighted
here
so
that
you
can
see
the
limit
on
the
plan?
Some
is
under
the
sidewalk
under
the
street.
So
that's
why
we
have
positioned
these
traffic
signal
posters
post
in
the
location
that
has
been
shown.
We've
done
the
necessary
coordination
with
agencies
and
gotten
since
the
last
time
responses
from
the
BPD,
as
well
with
our
approval
to
move
forward
with
this
this
project
as
a
piece
of
coordination.
J
From
our
time
last
week,
we've
we've
received
plans
from
the
pasta,
water
and
sewer
Commission,
highlighting
some
utilities
that
were
in
the
area
which
will
correct
on
the
plan
and
get
back
to
Commissioner
Devlin
we've
also,
as
I
alluded
to
in
the
introduction
part
of
the
request
to
Professor
Astrid.
We
relocated
the
traffic
control
box
from
its
location.
J
Of
the
intersection
we've
also
coordinated
with
the
disabilities
Commission
prior
their
request
last
week
to
send
the
variance
to
their
department,
they
reviewed
it.
They've
asked
us
to
coordinate
with
the
a
B.
We
have
done
that
a
B
is
suggested
that,
because
of
the
change
in
use
that
we
file
an
amendment
which
we
will
do
their
meeting
on
September
9th
and
have
asked
us
to
get
information
to
them
by
next
week,
early
Monday.
In
order
to
make
that
that
time
frame,
that's
just
amend
the
the
use
of
the
ramp
because
of
the
the.
A
A
J
You
as
I've
kind
of
blurred
the
line
a
little,
but
this
is
for
the
specific
repairs
also
for
the
traffic
signal
installation.
A
lot
of
the
comments
that
we
received
at
the
new
business
hearing,
which
were
related
to
this
we've
addressed
and
as
I
was
alluding
to.
We
are
working
with
the
a
B
on
this
location,
as
you.
J
We're
tying
in
to
this
location
in
Apex.
That's
due
to
the
fact
that
again
we
have
the
vaults
underground.
We
can't
locate
equipment,
pedestrian,
it
push
buttons
and
those
necessary
things
in
those
appropriate
locations,
and
this
is
the
ideal
location
for
that,
as
reviewed
and
determined
with
with
BTD.
We've
also
verified
part
of
the
requests
of
the
Commission
to
go
out
and
look
at
the
condition
of
the
existing
ramp,
and
it's
in
its
current
condition
is
still
good.
J
D
K
L
M
D
K
B
A
J
E
Make
a
motion
to
approve
on
a
petition
by
Fenway
Center
owner
one
to
two
LLC
for
the
making
of
specific
repairs
with
following
public
ways
in
Boston
proper,
consisting
of
curb
realignment,
sidewalk
reconstruction
as
well
as
new
and
relocated
pedestrian
ramps
and
traffic
signal
infrastructure,
Beacon,
Street
and
Maitland
Street.
As
shown
on
a
plan
entitled
city
of
Boston,
Public
Works,
Department
engineering
division,
specific
repair
plan,
771,
775,
Beacon,
Street,
Boston,
proper
one
sheet
dated
July,
2nd
2019.
E
A
Don't
want
to
push
him
by
189
Ipswich,
Street
Realty
Trust
for
the
making
of
specific
repairs
within
interest
hips,
which
Street
in
Boston
Proper
located
on
its
south
westerly
side
that
addressed
number
189
southeast
of
Van
Ness
Street
and
consisting
of
reconstructed
sidewalks
and
driveways
our
cuts.
This
was
new
business
on
August,
8th
2019,
and
this
is
shown
on
a
set
of
plans
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
specific
repair
plan,
189,
Ipswich,
Street
Fenway,
one
sheet
day,
July
19th,
2019,.
N
Like
good
morning,
I'm
Brian,
Ferrill,
VHB
and
I
have
here
with
me,
kathleen
brill
from
totally
hoe
magnet.
My
only
I'm
here
with
Jones
Lang
LaSalle,
we're
here
representing
the
Red
Sox
for
the
189
of
switch
Street
lot.
In
this
case,
the
specific
repair
for
a
widening
of
the
sidewalk
existing
curb
cut
on
hips,
good,
Street
and
I
do
not
believe
anything
has
changed
on
the
plan.
Since
the
last
time
we
met
in
front
of
you
on
August,
8th
other
than
Kathleen
will
describe
some
things
relative
to
the
signatures.
N
I
N
N
A
N
Is
today
so
we
will
be
raising
the
grade
of
the
of
the
lot
to
make
it
much
less
drastic
than
it
is
today.
So
today,
between
the
you
know,
the
Ipswich
Street
curb
cut
down,
and
you
know
it
drops
three.
You
know
three
to
five
feet
into
the
center
of
the
lot
where
we
will
be
raising
the
entire
lot
and
installing
a
retaining
wall
to
flatten
a
lot
out
as
much
as
possible
and
that
that's
required
because
of
the
broadcast
trucks
operations.
These
large
trucks
need
to
sit
as
flat
as
possible.
A
N
C
N
B
So
this
project
is
a
result
of
a
build-out
within
the
triangle
life
when
the
Performance
Center.
That's
why
this
is
getting
shifted
here,
initially
ready.
We
had
some
initial
discussions
reluctant
to
obviously
the
public
process
about
adding
additional
weeks.
Btv
resources
MoU
with
the
Red
Sox
on
that
we've
had
several
meetings
have
not
heard
back
from
ownership
gift.
Okay,.
G
B
E
E
A
Moved
moving
after
our
next
item
on
a
joint
petition
by
189,
if
switch
Street,
Realty
Trust
in
Old
Town,
Team,
Realty
Trust
for
the
granting
of
a
private
utility
license
for
the
installation
of
a
new
subsurface
private
telecommunication
infrastructure
within
Van
Ness
Street,
Boston
Proper
located
generally
southwest
of
Ipswich
street.
This
was
new
business
on
August
8
2019,
and
this
is,
as
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
license
plan,
Van,
Ness,
Street,
189,
8-foot,
Street
Fenway,
once
she
did
July
19th,
2019
and.
N
N
Q
N
D
N
A
E
A
motion
to
approve
on
a
joint
petition
by
189
tips,
which
Street
Realty
Trust
and
Old
Town
Team
Realty
Trust
for
the
granting
of
a
private
utility
license
for
the
installation
of
new
subsurface
private
telecommunications
infrastructure
within
Van.
Ness
Street
is
right
into
the
record
by
the
chair.
As
shown
on
a
plan
entitled
city
of
Boston
Public
Works,
Department
engineering
division
license
plan
ministry,
189,
hips,
Wood,
Street
Fenway,
one
tree
dated
July
19
2019.
A
Our
next
item
is
on
a
petition
by
trustees
of
Boston
University
for
the
making
of
specific
repairs
within
Commonwealth
Avenue
Boston
Proper,
located
on
us
northeast
side,
to
address
number
855
generally
used
to
Buick
street
and
consisting
of
a
new
campus
wayfinding
placemaking
sign.
This
was
new
business
on
August
8th,
and
this
is,
as
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering,
division,
specific
repairs,
plan,
Commonwealth,
Avenue
Boston,
one
sheet.
F
R
Morning,
I'm
Paul
Rinaldi
from
Boston,
University
and
I'm
here
with
Chelsea
Christensen
of
niche
engineering,
855
Commonwealth
Avenue
was
built
a
hundred
years
ago
as
a
showroom
for
the
Buick
Motor
Cars.
For
some
reason
in
nineteen,
seventy,
seventy-five
the
university
decided
to
fill
in
the
beautiful
showroom
windows,
and
here
we
are
in
2019
we're
planning
to
open
them
up
again.
The
project
has
three
elements:
first,
is
to
improve
handicapped
accessibility
right
now.
R
That
is
the
reason
for
the
specific
repair
installing
a
standard
University
sign
in
the
plaintiff
at
along
common
Avenue,
other
components
of
the
project
or
a
major
restoration
of
the
limestone
facade
and
bringing
back
the
showroom
windows
in
a
contemporary
version
Chelsea.
Would
you
speak
to
a
Chelsea.
S
Christensen
from
niche
engineering,
the
specific
repair
for
the
sign
is
the
zionists
to
be
located
in
the
planter.
This
area
is
currently
under
construction
as
part
of
the
capsu,
a
project
and
so
the
plant,
the
site
furnishings,
haven't
been
fully
installed
yet,
but
this,
as
shown
in
the
image
here,
it
would
be
in
the
planter
behalf
between
the
benches
and
the
roadway.
The
sign
is
about
five
foot,
nine
inches
high,
a
foot
and
a
half
wide
and
six
inches
thick.
I
S
R
M
D
M
B
B
A
A
E
A
motion
to
approve
on
a
petition
by
trustees
of
Boston
University
for
the
making
of
specific
for
kids
within
Commonwealth
Avenue
Boston
Proper,
has
read
into
the
record
by
the
chair
on
a
55
Commonwealth
Avenue.
As
shown
on
the
plan
entitled
city
of
Boston
Public
Works,
Department
engineering
division,
specific
repairs,
plan,
855
Cromwell
to
have
a
new
Boston
one
sheet
dated
August
2019.
A
Moving
on
to
our
next
item
on
a
petition
by
the
trustees
of
Boston
University
for
the
granting
of
projection
license
for
the
installation
of
canopies
and
lighting
fixtures
over
portions
of
Commonwealth
Avenue
at
Boston,
Proper
located
us
an
early
side
and
address
number
855,
generally
Houston
buick
street.
This
was
new
business
on
august
8
2019,
and
this
is
shown
on
a
plan
entitled
city
of
Boston
Public,
Works,
Department
engineering
division
license
plan,
855,
Commonwealth
Avenue
Boston.
Once
she
did
August
390
Paul.
R
R
S
Christensen
from
niche
engineering,
the
request
is
for
the
projection
of
the
existing
lights,
as
well
as
a
sunscreen
to
be
located
about
nine
inches
extending
into
the
sidewalk.
The
both
the
sunscreen
and
the
lights
are
about
11
feet
above
the
sidewalk
plus
or
minus,
as
the
sidewalk
grade
varies
slightly
along
the
building.
The
sunscreen
itself
is
9
inches
over
the
sidewalk
and
about
18
feet
long
above
each
of
the
windows,
and
then
the
existing
lights
extend
about
25
inches
over
the
public
sidewalk.
G
A
A
Next
item
is
on
a
petition
by
alstom
Road
Eden's
LLC
for
the
making
of
specific
repairs
within
Jan
Karski
way
and
Dorchester,
located
on
this
Northwest
Lea
side
and
addressed
number
25
generally,
a
district
Avenue
and
consisting
of
relocated
Street
trees,
as
well
as
the
removal
of
specialty
pavement.
This
was
new
business
on
August
8
2019,
and
this
is
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering,
division,
specific
repairs,
plan,
25,
Jan
Karski
way.
One-Sheet
did
July
24th
2019.
T
Good
morning,
I'm
Steve
Martorano
of
polar
engineering
I
here
with
me
to
my
right,
is
Kevin
Erickson
who's
with
the
110
grill,
the
applicant
for
the
cafe,
license
and
then
well
Stanwyck
who's
with
Eden's
who's,
the
owner
of
the
South
Bay
property.
We
were
here
three
three
weeks
ago
now,
two
for
new
business
for
the
project,
so
just
quick
overview.
The
South
Bay
projects
is
is
about
five
city
blocks
that
were
created
out
of
some
abandoned
properties.
T
It
included
creation
of
some
new
public
and
private
ways
throughout
the
parcel
Jan
Karski
Way
was
the
public
way
that
was
created,
and
this
application
here
today
is
obviously
on
the
public
way
portion
of
the
project.
When
we
were
here
last
time,
we
discussed
a
couple
of
items
that
we
promised.
One
was
a
rendering,
so
we
now
have
a
rendering
of-
and
this
is
a
real
live
photo
of
today,
conditions
with
the
cafe
license,
superimposed
or
the
cafe
proposal,
superimposed
onto
the
existing
conditions.
T
So
that
is
a
representative
image
of
the
fence
that
we're
proposing
around
around
the
cafe.
The
other
thing
we
heard
was
just
to
look
back
and
see
what
the
project
did
relative
to
pedestrian
studies
and
really
to
ensure
that
the
sidewalks
were
going
to
operate
as
intended,
even
with
the
cafe
in
place.
So
I'll
just
jump
right
in
so.
T
The
first
action
is
specific
repairs
and
the
specific
repairs
are
really
to
ensure
that
when
the
cafe
is
in
place,
we
still
have
Complete
Streets
elements
in
place,
as
well
as
ensure
sidewalks
still
appropriate,
appropriately
functions
and
has
the
accessibility
that
we've
set
out
as
guidelines
for
the
entire
self.
A
project.
T
So
the
cafe
is
on
the
corner
here,
which
Jan
Karski
is
the
public
way
going
up
the
page
into
the
middle
of
the
South
Bay
development?
That's
a
private
way
called
district
Avenue,
so
a
portion
of
the
patios
in
the
public
way
and
portions
in
the
private
way.
So
we'll
focus
obviously
on
the
public
way.
The
improvements
are
really
relocation
of
one
street
tree.
T
It
just
moves
to
the
other
side
of
the
intersection,
and
then
the
there
was
a
the
paver
strip
was
proposed
and
we've
we've
pulled
the
paver
strip
back
to
the
next
tree
pit,
just
to
make
sure
it
has
the
appropriate
look
for
the
area
and
makes
ensures
we
have
the
five
foot
width
when
the
site
go
in.
The
cafe
is
in
place
now.
So
that's
the
extent
of
the
specific
repairs.
T
B
B
A
E
A
motion
to
approve,
when
a
petition
by
all
State
Road
LLC
for
the
making
of
specific
repairs
within
Jankowski
way,
Dorchester
is
read
into
the
record
by
the
chair
and
shown
on
a
plan
entitled
city
of
Boston
Public
Works,
Department
engineering,
division,
specific
for
EPA's
plan,
25
Jankowski
way.
One
sheet
dated
July
24,
2009
teen.
A
We
got
into
our
next
item
on
petition
by
Allstate
Road
Eden's
LLC
and
110
Grill
South
Boston
LLC,
for
the
granting
of
a
sidewalk
cafe
license
for
seasonal
outdoor
seating
within
Jan
Karski
way.
Dorchester
located
on
its
northwesterly
side
had
addressed
number
25
northeast
of
district
Avenue,
consisting
of
seating
for
forty
four
persons
total
and
approximately
319
square
feet
within
the
public
way.
T
A
T
G
I
A
A
T
That's
that's
the
theme
they
they
don't
want
to.
You
know
force
everyone
to
use
the
exact
same
railing,
but
they're
trying
to
set.
The
theme
of
this
is
what
this
is.
What
we'd
like
to
see
and
you'll
see
some
other
versions
of
this
on
district
Avenue,
but
that's
really
they're
they're
trying
to
set
the
theme
and
keep
it
and
then
and
then
Eden's
has
final
review
over
any
tenants
fences.
L
L
F
E
A
motion
to
approve
on
a
joint
petition
by
all
State
Road
LLC
and
one
tank
ro
SP
Boston
LLC,
for
the
granting
of
a
sidewalk
cafe
license
within
Jankowski
way,
is
running
to
the
record
by
the
chair.
As
shown
on
a
plan
entitled
city
of
Boston
Public
Works,
Department
engineering
division,
sidewalk,
cafe,
plan
25,
Jan
Karski
way,
one
sheet
dated
July
24,
2009
teen,.
I
A
Moved
very
good.
Thank
you
very
much.
Moving
on
to
our
next
item
on
a
petition
by
crown
castle
fiber
for
a
granted
location
of
we'd
company
status
and
no
participants
to
install
new
telecommunication
conduit
with
city
shadow
within
the
following
public
ways
in
Charleston
third
Avenue
between
13th
Street
and
16th,
Street,
13th,
Street
and
third
Avenue
16th
Street
at
3rd
Avenue.
U
D
U
A
B
U
Yeah,
so
this
is
the
same
situation
we
put
out
for
lead
company,
no
participants
they're
putting
in
a
quad
for
themselves
in
a
quad
for
the
first
city
shadow,
and
we
did
make
a
lot
of
changes
to
to
this.
I'm
John
actually
was
working
a
lot
with
Denis
Devlin
this
week
because
there's
a
new
sewer
coming
in,
and
so
we
moved
the
trench
line
to
accommodate
that.
So
there
wouldn't
be
a
conflict.
D
E
K
L
U
I
E
H
A
W
Steve
Sawyer
with
design
Consultants
Inc,
so
we
did
remove
the
bump
out
on
Montebello
and
as
part
of
maintaining
a
5-foot
width
on
Montebello,
where
the
building's
pulled
two
feet
back.
So
we
maintained
two
feet:
are
it's
just
about
two
feet
of
sidewalk
in
front
of
the
new
building
so
as
coordinated
v.I.c?
We're
asking
that
this
beacon?
W
Actually
with
that
it's
gonna
require
an
easement.
We
thought
we'd
have
that
easement
plan.
Today
we
didn't.
We
didn't
get
that
so
we're
required
to
continue
this
matter,
I
think
to
September
26,
and
then
we
could
the
easement
beyond
the
new
business
at
the
next
meeting.
Then
they
both
finish
up
together
on
the
26.
W
W
W
A
Q
A
D
B
L
I
W
A
A
Four
weeks
on
this
item,
moving
on
to
our
next
item
on
a
set
of
giant
petitions
by
Stewart
acquisition,
12
LLC
and
Stewart
acquisition,
22
LLC
for
the
making
a
specific
repairs
within
the
following
public
waves
in
Boston
Proper,
consisting
of
curb
realignment,
sidewalk,
invest
and
ramp
reconstruction,
as
well
as
new
and
relocated
specialty,
pavement
street
light
street
trees,
irrigation
infrastructure,
storm
drain
infrastructure,
groundwater,
recharge
structure,
driveway,
curb
cuts
and
a
Scylla
saw
ground
water
retention
and
tree
root
protection
system
locations
are
Stewart
Street
on
its
southeast
side,
address
numbers,
22,
12,
222,
east
of
Church,
Street
Church
Street
between
Stewart
Street
and
Shama
Street
Shama
Street
has
northerly
side
between
Church
Street
and
Coconut
Grove
Lane.
A
V
Croissant
with
niche
engineering
here
with
Peter
spelling
of
story
exhibition
and
Paula
Deveraux,
so
we're
here
for
specific
repairs
on
Church
Street,
Stewart,
Street
and
shammed
Street.
So
we've
got
the
rendering
in
the
building
here
the
proposed
building,
19
story,
residential
small
retail
component
on
the
first
floor,
126
units
so
kind
of
like
last
time,
we'll
just
walk
around
the
building.
D
L
X
L
A
Y
So
it's
currently
it's
a
parking
lot
and
it's
been
vacant
building
for
a
long
time
and
it
was
prior
many
years
ago
a
building
was
burned
out
and
ASD
was
ordered,
ordered
to
take
it
down.
So
it's
been
vacant.
For
a
number
of
years,
the
we
went
through
the
process
with
both
BPD
a
under
article
80
in
the
Zoning
Board
of
Appeals
to
construct
a
new
building.
There
was
a
very
robust
community
process
with
Bay
Village,
because
this
is
seen
by
the
residents
of
Bay.
L
V
L
V
Y
B
Y
Z
V
I
A
E
Actually,
excuse
me:
it's
not
it's
on
the
ashwamedh
street
siding
and
questions
on,
but
that's
yeah
jumping
add
a
little.
V
So
this
is
true:
streak
runs
north-south
between
geometry
and
Java.
Street
itself
trick
it's
primarily
a
pedestrian
street,
and
that's
where
it's
going
to
be
maintained.
That
way,
there
will
be
the
emergency
access
for
emergency
vehicles,
only
we're
maintaining
twenty-foot
with
for
that
similar
treatment
as
Stewart.
True
enough
concrete
sidewalk
along
this
side
of
a
building
said
the
concrete
sidewalk
shaman
there
will
be
a
pedestrian
who
favors
in
Church
Street
itself.
V
F
F
D
B
G
O
D
A
D
L
G
E
I
just
had
some
general
comments
in
Oh
Chris.
We
talked
briefly
before
the
meeting
our
office
does
is
still
reviewing
the
site
plan
for
this
partner.
They
did
sell
we'll
have
some
concerns
and
they
know
you
came
in
early
this
week
to
drop
a
revised
plan
off,
but
it
hasn't
been
reviewed
in
so
we
just
wanted
to
we're
okay
with
the
work
hold
for
as
long
as
it's
contingent
upon
approval.
D
G
A
B
Construction
as
well,
we
located
specialty
people,
street
lights,
street
trees,
irrigation
infrastructure,
slum
rank
of
the
stretch
of
groundwater,
recharge
infrastructure,
driveway
rip
cuts
so
ground
water
retention,
tree
protection
system.
It's
ready
to
rectify
the
chair
and,
if
shown,
the
set
of
plans
entitled
city
of
Boston,
Public,
Works
Department
and
here
in
Division,
212
Stewart,
Street
Boston,
six
sheets
dated
7
2008,
deep,
with
the
caveat
lost
more
in
store
final
proof.
Second,.
E
A
Moved
remember
our
next
out
of
my
joint
petition
by
Stewart
acquisition,
12
LLC's
Stewart
acquisition,
22
LLC
and
the
Boston
Planning
and
Development
Agency
for
the
vertical
discontinuance
of
portions
of
Stewart
Street,
Boston
Proper,
located
on
the
southeast
side
and
address
numbers,
212,
222,
east
of
Church,
Street
and
vertically
above
the
grade
of
the
sidewalk.
This
was
new
business
on
August.
8Th
2019
is,
as
shown
on
a
plan
until
the
city
of
Boston
Public,
Works,
Department
engineering
division,
discontinuance
plan
vertical
Stewart,
Street
Boston
Proper.
Once
she
did
August
13th
2019.
L
M
H
The
motion
to
approve
it
joint
petition
base
to
window
position,
twelve
LLC
still
in
position
22
and
for
the
vertical
discontinuance
proportion
of
Stewart
Street,
was
improper
located
on
this
southeasterly
side.
That's
right
by
the
chairs
and
showing
money
planning,
title
city
of
Boston,
Public,
Works,
Department,
engineer,
intermission,
discontinuous
pilot
protocol,
Stewart
Street
was
improper
when
she
needed
August,
13
2009.
A
Favor
aye
so
moved.
We
forgot
to
our
final
public
hearing
item
on
a
drum
petition
by
Stewart
acquisition,
12,
LLC
and
Stewart
acquisitions
rain
LLC
for
the
grant
ignored
projection
license
for
the
installation
of
two
canopies.
There
were
portions
of
Stewart
Street,
Boston
Proper,
located
on
the
southeast
side
at
address
numbers,
12,
222,
east
of
Church
Street.
This
was
business
on
August,
8
2019.
This
is,
as
shown
on
a
plan
entitled
city
of
Boston
Public
Works,
Department
engineering
division,
canopy
license
12
Stewart
Street
Boston.
Once
she
did
December
2018.
G
G
A
A
V
Y
What
happened
on
this
is
this
was
in
2008.
There
was
another
project
that
was
approved
for
this
location
that
was
never
constructed
and
as
part
of
that
approval,
the
owner
at
the
time
granted
pedestrian
easements
on
this
property,
which,
with
this
new
proposal,
they
need
to
be
discontinued.
So
that's
why
we're
here
for
that.
G
AC
AD
AC
I
I'll
see
I'll,
give
you
I'll,
give
you
that
part
we're
going
to
building
a
new
building.
It's
making
the
parcel.
That's
been
used
for
the
construction
of
storage
or
storage
of
construction
materials
and
the
like
for
the
last
good
period
of
time
and
on
that
site,
which
I
will
build
a
six
story.
Building
that
will
fully
occupy
the
site.
It
will
have
45
for
sale
units,
one
retail
space
and
nine
car
parking
garage
that
parking
garage
is
at
grade
and
will
be
entered
from
Taber's
Street
directly
into
on
level
parking
at
street
level.
AC
There
is
a
smallest
curb
cut,
which
Jakob
will
explain
on
that
and
the
it's
a
six
story,
building
as
I
said,
and
it's
a
masonry
building
trying
to
relate
to
the
Bruce
bowling
building
as
part
of
our
design
for
the
building
we
created.
What
are
called
people
call
them
bays,
but
they're
technically
in
Architects
speak
they
are
orioles
when
they
don't
reach
the
ground.
That's
what
they're
supposed
to
be
called
so
anyway.
They're
draw
they're
kind
of
diagonal
and
they
sort
of
catch
like
facets
from
Warren
straight
down
this
small
table
Street.
AC
So
it
was
thought
by
the
architects
that
BP
da
and
ourselves
that
this
would
add
to
the
interest
of
the
building.
The
coloring
of
the
building
will
be
similar
to
the
lighter
colors
of
the
brick
and
masonry
on
the
Bruce
bowling
building,
so
we're
trying
to
relate
to
what's
there
with
that
in
mind.
Civil
engineering,
please.
AD
His
long,
the
building
is
long
Orange,
Street
and
Tabor
Street
along
favorite
revisited
distant
bituminous,
concrete
sidewalk
on
Warren
Street,
existing
brick
we're
proposing
to
replace
it
with
concrete.
We're
also
been
doing
upgrades
with
treating
long
paper,
Street
terminal
papers
around
them
and
then
also
adding
the
WC
skater
devil
acorn
lights
along
Cambridge
Street.
M
D
AC
AC
A
AD
L
AC
M
A
A
What
they
can
talk
about
other
funds
that
might
be
to
go
to
the
streetlights
they're
going
to
put
in
because
I
like
this
area,
it's
going
to
see
somebody
would
want
to
put
especially
a
tenant
in
this
area,
which,
rather
than
dig
up
your
sidewalk,
that
conduits
already
there
make
it
makes
your
project
a
lot
better.
It
makes
that
punch
a
lot
easier
and.
M
L
AC
B
M
B
So
what
we
need
to
do
it
be
install
product
we
need
to
bring
in
and
generally
it
doesn't
for
this,
because
the
specific
area
is
getting
redeveloped
right
now,
with
a
master
plan
at
Hawaii,
the
Transportation
Department,
it
would
suggest
that
touch
base
with
Pat
Hoey
the
transportation,
apart
on
the
article
80
review
for
traffic
and
parking
issues,
so
that
basically
concurrently
have
built
into
the
design
that
they're
looking
at
Warren
Washington
Square
area.
So
you
need
to
have
a
review
done
by
the
transcript
Transportation
Department
Planning
Division.
B
A
B
AC
AD
AC
AC
There
there's
an
adjacent
building
the
Palmer
building
that
was
built
20
years
ago,
say,
and
that
is
built
and
without
a
basement,
basically
also
because
of
the
soil
conditions
there.
Our
geotechnical
engineer
MacPhail
associates
advised
us
to
keep
away
from
that.
You
know
so,
for
a
number
of
reasons.
AD
D
AC
D
AC
I
AD
F
AD
L
I
G
L
C
A
P
Good
morning,
John
Schmidt,
with
with
niche
engineering
and
beside
me,
is
Michael
Imperial,
Jade,
Jones,
Lang,
LaSalle
and
we're
here
today
on
behalf
of
the
Taj
Hotel,
where
we're
proposing
a
series
of
specific
repairs
and
a
pedestrian
easement
for
public
sidewalk
improvements.
The
hotel
is
currently
gone
through
a
series
of
interior
renovations
throughout
the
building,
as
well
as
renovations.
P
P
Q
P
So
the
improvements
with
a
new,
very
Street
or
we
we
will
reconstruct
the
sidewalks
to
comply
with
the
complete
Street
components.
We
were
providing
a
nine
foot,
wide
pervious
paver
along
the
curb
line
and
then
a
nine
foot
wide
concrete
sidewalk.
We
will
be
planting
three
four
new
street
trees
and
we've
been
through
the
parks
department
and
have
the
tree
removal
approvals
and
new
street
lights
as
well,
and
then.
P
P
D
D
Is
one
of
our
most
beloved
roadways?
So
if
you
can
give
consideration
to
a
more
pedestrian
environment
as
much
as
recognizing
the
enormous
history
of
this
building,
rather
than
this
is
limiting
to
the
our
city's
current
complete
state
standards,
I
think
what
might
be
needed,
ease
reflection
on
conformity
into
the
area
so
make
it
very
clear.
AE
It
may
be
slight:
well,
not
off-topic,
but
related.
You
know
we
are.
The
hotel
is
also
a
condo
owner
in
the
building
next
door.
Right
and
I
can
tell
you
that
we
have
been
having
discussions
with
them
about
the
potential
for
replacing
the
sidewalk
in
front
of
the
common
house,
which
is
the
case,
but
it's.
L
D
P
D
P
F
P
G
P
Z
Good
morning
how
you
doing
so,
I'm
Scott
will
and
I
represent
LOV
LLC,
which
is
doing
visit,
says
five
horses,
tavern,
Dylan,
well,
she's,
the
primary
owner
and
prior
to
of
the
restaurant,
so
we're
what
we're
doing
we're
asking
the
pic2
allow
us
to
expand.
What's
the
currently
an
existing
private
patio
by
about
for
a
little
over
four
feet
into
the
public
way,
essentially
expanding
the
patio
to
about
44
seats,
that's
a
general
gist
of
it.
Z
A
Z
Can
stop
it
so
basically,
this
process
with
the
community
started
probably
about
three
years
ago,
where
the
community
sociation
gave
about
a
conditional
letter
of
approval,
subject
to
a
meeting
for
the
past.
Let's
say
since
March
Dylan
has
had
a
variety
of
meetings
with
the
president
of
the
Association
as
a
last
week.
They
actually
had
a
we
posted
he
notices
and
had
a
meeting
on
the
22nd.
It
was
twice
within
the
Association
and
the
communities
abroad
and,
as
far
as
we
know
at
this
point,
there's
no
objections
from
the
community.
Z
In
addition,
we
have
about
20
a
lot
to
do.
We
have
18
signed
letters
from
people
within
the
community
of
supporting
the
expansion
to
the
public
way.
We've
also
done
a
pedestrian
study
to
show
that
it
doesn't
impact
any
pedestrian
access
that
actually
you'll
have
about.
I
still
have
a
little
over
a
half
feet
of
pedestrian
access,
even
after
the
expansion
I'm
to
the
public
way.
B
M
M
M
M
AF
D
A
A
Z
Z
A
A
AF
I
AF
Z
Z
A
Q
L
L
L
L
AA
AG
AA
This
project
stems
from
about
a
year-long
community
process
where
folks
at
Rose
nyl
Village
Main
streets
in
the
merchants
along
birch
Street
approach
approached
the
city
of
Boston
about
creating
a
pedestrian
way
on
their
Street.
It's
a
one-way
street
that
leads
vehicles
currently
sort
of
in
a
redundant
pattern
that
ultimately
takes
them
back
to
where
they
started.
AA
I
AG
AG
D
AA
AG
D
D
F
I
H
D
E
I
just
had
some
comments
from
foster
water,
and
so
we
do
have
facilities
in
this
area.
So
I
just
want
to
send
you
a
map
of
our
locations,
Dovie
and
also
you
know
as
long
as
you
want
to
see,
and
we
have
the
right
to
be
there
at
any
time.
So
in
case
something
happens,
we
have
to
you
know,
don't
write
in
and
you.
AG
AA
D
M
B
AG
So,
on
either
end
a
bird
street,
there
are
smaller
planters
that
are
actually
going
to
be
on
casters.
That's
one
of
the
requests
from
the
fire
department
is
that
they
could
be
moved
out
of
the
way
if
need
be,
but
they
will
be
there
semi
temporarily,
so
that
it
you
wouldn't
be
able
to
drive
a
car
down.
AA
B
AA
Buildings
could
couldn't
agree
with
you
more
so
in
talking
through
we'll
get
we'll
get
a
letter
with
the
exact
specifications
that
they
gave
to
us,
but
mainly
was
given
the
height
of
the
building
on
the
on
the
side
of
birch
Street
closer
to
the
back
parking
lot
there.
It's
just
one
story,
and
so
they
said
that
they
wouldn't
use.
Also
given
the
the
narrowness
of
birch
tree
when
there's
two,
when
there's
parked
cars
on
both
sides
right
now,
they
actually
wouldn't
be
able
to
get
a
fire
truck
down
there,
and
so
we
just
use
ladders.
AA
AG
AA
Yeah
I'll
get
that
written
for
you
sure.
As
for
the
loading
question,
most
loading
today
occurs
from
the
side
streets,
not
on
birch
itself
and
also
from
the
parking
lot
in
the
rear
during
the
week
long,
a
pilot.
This
was
one
of
the
main
things
we
were
observing
and
we
did
interviews
with
all
the
businesses
afterwards
to
see
if
they
had
any
loading
concerns
and
everyone
was
able
to
adequately
load
from
18
wheelers
with
beer
kegs
to
UPS
trucks,
and
things
like
that.
D
AA
May
change
that
to
a
corral,
if
me,
because
I'll
be
easier
to
secure
to
the
street,
there's
currently
one
bike:
rack
in
front
of
the
Boston
cheese
seller
on
the
sidewalk
unclear,
whether
that
all
moved
given
the
the
change,
the
nature
of
the
street.
That's
also
something
we
can
add
in
afterwards.
If
need
be,.
AG
I
B
AA
So
the
the
two
businesses
that
have
expressed
a
desire
outdoor
patios
distraction
brewing,
which
is
not
yet
open
in
Burge,
Street
Bistro,
so
there's
space
between
those
two
planters
where
they
could
have
an
outdoor
patio.
But
as
Amy
said
they
would
come
back
here
for
that
to
establish
that.
But
that
would
be
a
detached
patio
with
service
across
the
public
right.
D
G
AH
Okay,
still
morning
good
morning,
stephanie
says
Caen
here
from
the
Boston
Transportation
Department
for
our
neighborhood
slow
streets
program.
These
are
our
proposed
improvements
in
the
Highland
Park
neighborhood,
which
is
one
of
twelve
zones
in
the
city
going
through
the
process
for
safety,
improvements
and
traffic
calming
measures
at
key
locations.
AH
We've
been
working
at
the
Highland
Park
neighborhood
for
almost
two
years
now
on
understanding
what
their
concerns
are
and
what
the
best
interventions
may
be
to
address
those
concerns
with
neighborhood
slow
streets.
We
are
bringing
the
regulatory
traffic
speed
down
to
20
mile
per
hours
on
most
streets,
an
exception
in
Highland.
Park
is
Center.
AH
Street
itself
will
stay
at
25
mile
per
hour,
but
we
are
otherwise
focusing
on
key
areas,
near
parks
and
schools
to
make
improvements,
particularly
for
pedestrian
safety
and
then
adding
speed,
humps
elsewhere
to
address
concerns
around
speeding
and
also
help
self
enforce
the
speeds
to
20,
otherwise,
not
sure
that
people
would
change
their
habits
so
I'm
joined
with
by
our
dude
on
from
Kittleson
and
associates.
Who
is
the
engineer
on
these
plans
and
can
walk
through
each
page
that
you
have
in
front
of
you.
X
As
Stephanie
suggested,
the
proposed
improvements
at
29
speed
humps
within
the
neighborhood,
their
locations
of
the
speed
humps
were
determined
based
on
street
geometry.
The
width
grade,
access
for
MBTA
buses
as
well
as
average
daily
traffic
number
of
travel
lanes
and
emergency
vehicle
access.
The
separation
between
the
speed
humps
is
approximately
200
250
feet.
This
was
found
to
be
more
effective
than
the
pilot
that
was
built
in
Dorchester
neighborhood.
Where
does
the
separation
between
the
speed
humps
warez
greater
closer
to
300
and
350
feet?
So
the
speed
humps
represented
here
250.
X
X
The
reason
for
permanent
changes
include
maintenance,
their
ability
from
the
neighborhood
to
have
more
aesthetic
look
permanent.
Look
to
these
improvements,
sidewalk
and
safety.
The
first
improvement
is
at
marsala
Street
and
Highland
Street.
This
location
Marcella
is
a
two-way
street.
With
on
street
parking
on
one
side,
the
intersection
is
located
within
a
transition
where
the
cross-section
for
Marcellus
Street
widens
from
26
to
30
feet.
This
is
a
very
active
crosswalk
coming
down
neighborhood
into
the
Marcella
playground,
so
we
see
a
lot
of
children.
X
The
improvement
here
is
to
widen
the
sidewalk
six
feet
from
the
existing
edge
of
Marcello
Street,
which
narrows
down
Marcella
Street
to
23
feet.
They
also
reconstruct
the
existing
apex,
curb
ramps
into
directional
pedestrian
ramps
and,
through
this
process,
where
we
looked
at,
maintaining
positive
drainage
were
maintaining
and
readjusting
where
needed,
catch
basins
maintained
by
blossom
water
sewer,
the
cross-section
on
Highland
Street,
is
not
changing,
and
that
was
primarily
due
to
a
fire
ladder
access.
X
The
next
location
is
around
along
Cedar
Street.
This
is
right
in
front
of
and
Nathan
Hale
Elementary.
The
access
here
is
roughly
halfway
between
two
existing
intersection
at
Lambert,
Ave
and
Hawthorne
morning.
Observations
show
a
lot
of
people:
pupils,
sorry
cross,
a
dis,
mid
block
location.
We've
discussed
the
current
crossings
with
school
and
between
the
school
and
the
local
constituents.
X
There
was
a
recommendation
to
add
a
race
crosswalk
here
now.
I
also
have
to
point
that
this
race
crosswalk,
would
also
facilitate
a
20
mile,
an
hour
speed
profile
on
Cedar,
because
it's
going
to
be
part
of
an
work
in
concert
with
the
speed
humps
that
we
are
proposing
upstream
and
downstream
from
this
crosswalk.
L
I
AH
It
the
parents,
do
some
pickup
drop-off
on
the
sorry,
I
guess:
North,
we're
gonna
call
this
direction,
so
he
co
on
the
west,
where
they're
not
really
supposed
to
be
doing
pickup
drop-off
in
a
parking
lot
that
is
not
associated
with
the
school,
but
is
where
they
do
it.
Bus
activity
generally
happens
north
of
this
location
just.
B
D
This
project
said
thank
you
for
all
the
hard
work
which
are
doing
so.
My
comments
are
like
tiny,
tiny,
tiny
bit
little
things,
okay,
sure
so,
because
stuff
that
you
can
very
quickly
adjust
and
talk
to
your
cat
operator,
okay,
buddy
per
serving
so
see
the
street.
That
thing
is
a
so
you
should
familiarize
yourself
with
our
ask
about
the
content:
that's
a
50-foot
roadway,
so
the
right
happens
to
be
so
normally
people
both
ways.
We
had
to
10-foot
sidewalks,
not
9,
feet,
8,
inches
and
97
inches.
D
D
Q
D
X
M
D
The
speed
humps
so
in
terms
of
a
20
miles
per
hour
travel
so
which
you're
hoping
for
what
is
the
travel
time
time
between
speed
humps?
What
are
you
aiming?
But
you
said
it's
about
250
feet,
but
in
terms
of
me
experiencing
that
right,
I
know,
I
just
wanted
to
make
sure
that
you
all
have
given
that
consideration,
because
that
translates
to
a
little
bit
more
than
10
seconds
of
travel
time.
D
AD
AH
X
The
improvement
proposed
on
Centre
Street
at
Highland,
Avenue
skinnier,
confusing
we
have
Highland
Avenue
and
have
Highland
Street
is
the
location
where
MBTA
bus
buses
stopped.
We
have
a
bus
stop
on
either
side
of
the
intersection.
This
was
also
a
location
documented
where
we
have
frequent
crosses.
Twenty-Eight.
Cross
crossings
were
documented
across
Center
Street,
and
it's
also
down
the
street
from
the
page
Academy
in
the
area
would
put
pupils.
So
it's
a
high
interest
area
for
safety.
No
other
mark
crosswalk
exists
between
Cedar
Street
and
John
Eliot
square.
AH
D
X
Was
a
minimum
space
required
to
have
an
ad
a
refuge
and
also
maintained
exact,
accessible
lanes,
at
least
15
foot
lanes
for
emergency
vehicles
to
pass
by
this
location.
So
the
the
choice
to
to
make
it
a
minimum
dimension.
440
island
was
to
try
to
balance
pedestrian
crosswalk
and
emergency
access
through.
Q
D
A
AF
D
X
Additional
details
related
to
the
proposed
improvements
include
the
widening
of
the
sidewalk
along
Highland
Avenue,
by
six
feet
to
narrow
down
Highland
Avenue
to
18
feet
and
I
have
to
note
that
the
dimension
on
the
plans
that
you're
looking
at
right
now
is
incorrect.
Now
will
be
updated
before
next
middle.
D
D
D
D
D
D
X
The
second
location-
it's
the
median
here-
is
to
control
and
maintain
the
citywide
speed
limit
of
25
miles
an
hour
observations
in
the
field
identified
people
driving
across
the
double,
yellow
and
accelerating
up
the
hill.
This
island
is
not
supposed
to,
and
we
would
not
propose
a
pedestrian
cross
crossing
here,
because
we
cannot
accommodate
the.
D
AH
Q
D
AH
D
F
M
X
X
And
this
again
it's
a
theme
along
Center
Street,
to
provide
a
similar
speed
profile
for
for
people
crossing
this
dis
corridor
at
Center,
Street
and
Lynwood
street.
There
is
a
very
wide
opening
which
creates
a
lot
of
confusion
for
people
using
this
intersection.
It
also
creates
a
crosswalk,
that's
in
excess
of
65
feet
for
four
people
crossing
Linwood
Street,
so
that
we're
proposing
to
extend
Center
Street
by
about
40
feet,
south
and
close
the
gap.