From YouTube: Public Improvement Commission Hearings 9-12-19
Description
The Boston Public Improvement Commission (PIC) is the owner and regulator of the City's rights of way. The PIC plays an integral role in the City's development and permitting process. From the restaurant that wants to add a seasonal cafe on the public sidewalk, to the developer who wants to construct an underground parking garage for a new housing development, or the homeowner who wants to add an architectural feature to a house that juts into the public space, each must seek approval from the PIC to have its private venture occupy public space, either permanently or on a licensed basis.
A
A
A
A
A
A
A
A
A
B
Only
everyone
like
to
call
the
or
the
public
improvement
Commissioner
meeting
of
September
12
2019.
The
first
item
are
the
hearing
medical
requests,
the
public
improvement,
Commission
staff,
the
acceptance,
the
minutes,
the
CIC
hearing
held
on
August
29
2019.
Any
questions
or
comments
on
the
herring
nets.
I'll
entertain
a
motion
on
the
very
minutes
I
make.
B
We're
out
on
public
hearing.
Our
first
item
is
on
a
joint
petition
by
Stuart
acquisition,
12
LLC
in
Stuart
acquisition,
22
LLC
for
the
discontinuance
of
any
and
all
rights
to
travel.
The
public
may
have
had
within
2
pedestrian
easements
adjacent
to
the
following
public
ways
in
Boston,
proper
Xiamen
street,
honest
northerly
side
at
the
rear
of
212
22
Stewart
Street
generally
between
Church
Street
and
Coconut
Grove
Lane
and
Church
Street
on
a
Cecily
side
generally
between
Stewart
Street
in
Xiamen
Street.
D
We
also
are
here
this
week
in
order
to
do
some
title
cleanup
for
pedestrian
easements
that
were
as
a
result
that
were
granted
to
the
city
as
a
result
of
a
development
in
2008
which
was
never
constructed
so
in
order
to
construct
the
project
that
was
explained
to
you
two
weeks
ago.
We're
here
now
to
discontinue
these
pedestrian
easement.
B
C
E
C
E
A
B
Found
our
second
item
on
a
petition
by
10
Tabor
Street
LLC
for
the
acceptance
of
two
pedestrian
easement,
so
Jason
de
haber
Street
a
public
way
on
Roxbury
located
on
snarly
side
at
address
number
10
east
of
Warren
Street.
This
was
new
business
on
August,
29th
2019,
and
this
has
shown
on
a
planet
city
of
Boston,
Public,
Works,
Department,
engineering
division,
pedestrian
easement
plan,
ten
Tabor
Street,
Warren,
Street
Roxbury,
one
sheet
date,
August
6,
2019,.
F
A
G
F
F
F
F
F
A
I
I
So
building
along
Taylor
Street
is
swelling
obsessed
from
the
building
from
the
sidewalk
in
the
proper
line,
and
therefore
two
areas
will
just
basically
be
concrete
and
will
blend
into
the
city.
Sidewalk
and
therefore
pedestrian
easements
are
needed
from
the
property
line
into
the
edge
of
the
building.
So
there's
two
areas,
one
and
two:
they
are
87
and
97
square
feet
respectively,
and
they
come
out.
They
come
in
at
the
most
about
four
feet
here,
with
something
most
kind
of
somewhere
between
two
to
three
feet
in
general
area.
B
E
A
motion,
my
petition
by
10:00
Ava
Street
LLC
for
the
acceptance
of
two
pedestrian
easements
and
jason-2
Tabas
Street
public
way,
Roxbury.
As
shown
on
the
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
pedestrian,
easement
plan,
ten
tayyiba
Street,
Warren,
Street
Roxbury,
one
sheet
dated
August
6,
2009
teen,.
B
Moving
on
to
our
next
item
on
a
joint
petition
by
10
Tabor,
Street
LLC
and
the
Boston
Planning
and
Development
Agency
for
the
protocol,
discontinuance
of
portions
of
Tabor
Street
a
public
way
in
Roxbury,
located
on
the
northeast
side
at
address
number
10
east
of
Warren
Street
vertically
above
the
grade
of
the
sidewalk.
This
was
new
business
on
August
29th
2019.
Who
is
this
showing
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
discontinuance
plan
vertical
ten
Taylor
Street
Warren
Street
Roxbury,
once
she
did
on
August
22nd
2019.
I
Their
Orioles
that
come
off
the
building
and
extend
holy
city
sidewalk,
they
are
got
13
feet
from
the
sidewalk
rate,
and
there
are
three
of
them.
They
come
out
about
that
maximum
about
three
feet
and
they
are
accomplishing
respectively,
1,400
cubic
feet,
three
thousand
cubic
feet
and
3,500
cubic
feet.
That's
me
between
this.
The
area
cover
and
the
vertical
discontinuance
going
up
to
the
top
of
building,
so
they
are
all
on
camera
stream
as
well.
B
K
I
make
a
motion
on
a
joint
petition
by
10
Tabas
feet:
LLC
in
a
Boston
Planning
and
Development
Agency
for
the
vertical
discontinuance
of
portions
of
Tabor
Street,
a
public
way
Roxbury
located
on
its
northerly
side
at
address
number
10
east
of
Warren
Street
vertically
above
the
grade
of
the
sidewalk.
As
shown
on
a
plan
entitled
city
of
Boston,
Public
Works,
Department
engineering
division,
discontinuance
plan
vertical
10,
Tabor,
Street,
Warren,
Street
Roxbury.
Once
she
dated
August
22nd
2019.
B
We've
got
our
next
item
on
a
petition
by
ten
Taylor
Street
LLC
for
the
making
of
specific
repairs
within
the
following
public
ways
in
Roxbury,
consisting
of
curved
roadways,
sidewalk
and
festerin
ramp
reconstruction,
as
well
as
new
and
relocate
especially
payment
street
trees.
Street
lights
and
driveway
curb
cuts
locations
were
Taylor
Street
on
us
northerly
side
generally
at
address
number
10
between
Warren
Street
and
Harrison
Avenue
Warren
Street
on
Cecily
side,
north
of
Tabor
Street.
I
I
I
Accessible
ramp
that
will
basically
be
redone,
maybe
tweaked
a
little
bit
more
towards
this
area
as
possible,
and
then
this
crosswalk,
this
ramp
will
be
made
accessible,
which
is
currently
thank
you
other
than
that.
We
also
added
a
note
regarding
redundant
sees
for
the
light
poles
for
telecom
major
telecom.
B
C
F
A
F
B
If
you
could
possibly
have
a
conversation
with
John
monicelli
from
the
bus
restoration
Department
about
whether
it
makes
sense
to
install
any
curbside
bike
parking
is
to
support
the
retail
establishment
on
the
first
floor,
that'd
be
great
zero
that
makes
sense
on
Taylor
Street
John.
Thank
you
for
Binney
or
not
for
the
side
of
the
girl.
He's.
B
A
B
E
A
motion
to
approve
on
a
petition
by
10
th
Street
LLC
for
the
making
of
specific
repairs
on
chemistry
and
Warren
Street.
As
shown
and
set
of
plans
entitled
city
of
Boston,
Public
Works,
Department
engineering
division,
specific
rupees
10
table
Street,
while
and
Street
Roxbury
2
sheets
dated
August,
2nd
2019.
B
Next
item
on
a
petition
by
are
I
are
in
Bray
hotel,
LLC
for
the
acceptance
of
a
pedestrian
easement
adjacent
of
Newbury
Street,
a
public
way
on
Boston
Proper,
located
on
the
southwest
Eastside
southwest
of
Arlington
Street.
This
was
new
business
on
August
29
2019,
and
this
is,
as
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
pedestrian
he's
been
playing,
Newbury,
Street,
15,
Arlington,
Street
Boston.
Once
she
did
it,
August
29th.
M
Good
morning,
John
Smith,
with
each
engineering
and
with
me,
is
Michael
MP
air
from
Jones
Lang
LaSalle.
We
were
here
two
weeks
ago
for
new
business
to
propose
improvements
to
the
public
sidewalks
on
Newbury
Street
in
Arlington
Street.
The
the
first
petition
before
you
is
pedestrian
easement
and
the
pedestrian
easement
will
run
on
Newberry
Street
on
the
corner
around.
N
M
And
the
purpose
of
the
pedestrian
easement
is
to
allow
unimpeded
safe
and
accessible
access
for
the
full
concrete
sidewalk
with
we
had
originally
just
provided
enough
to
provide
a
six-foot,
easement,
I'm
66
book
of
concrete,
but
now
as
to
fall
concrete
with
nine
feet.
So
between
the
curve
and
the
back.
A
sidewalk
will
be
open
to
the
public
and.
B
A
K
Though
I
made
the
motion
on
a
petition
by
I
RDP
Newberry
hotel
LLC
for
the
acceptance
of
a
pedestrian
easement
adjacent
to
Newbury
Street
in
public
way,
Boston
Proper,
located
on
its
north
westerly
side
southwest
of
Arlington
Street,
as
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
pedestrian
easement
plan,
Newbury,
Street,
15,
Arlington,
Street
Boston.
When
she
dated
August.
B
4
next
item
addition
by
I
re
P,
Newbury
Hotel
LLC
for
the
making
of
specific
repairs
within
the
following
public
ways
in
Boston
proper,
consisting
of
curb
realignment
side,
walking,
pedestrian
ramp
reconstruction,
as
well
as
new
and
relocated
specially
pavement
street
light
street
trees,
irrigation
infrastructure
and
storm
drain
infrastructure
locations.
Our
Arlington
Street
on
Southwest
Lee
side
at
address
number
15
between
Newbury
Street
and
public
alley,
number
437
and
Newbury
Street
known
as
Northwest
Lee's
side
southwest
of
Arlington
Street.
M
Morning,
John
Smith
with
niche
engineering,
so
on
Newbury
Street
I'm,
the
we
will
be
reconstructing
on
sidewalks.
We
provide
a
three-foot
pervious
pavers
strip,
intrigued
with
poor
trees
within
that
pervious
favored,
a
nine
foot
wide
concrete
sidewalk
new
street
lighting,
and
then
we
also
installing.
N
M
B
C
A
motion
to
approve
petition
by
IR
ep-3
hotel,
LLC,
making
specific
appearance
within
the
following
public
place
in
Boston
Proper,
consisting
of
curb
realignment,
sidewalk
and
pedestrian
ramp
reconstruction
as
well
as
new,
and
we
located
specially
payment,
streetlight
street
trees,
irrigation
infrastructure
and
store
marina.
Mr.
C
E
B
H
Morning,
how
are
you
today,
I'm
Scott
whittlin
I'm,
the
attorney
for
five
horses
tavern?
That
makes
me
fill
in
well
she's,
the
owner
and
operator
of
the
rest.
We
were
here
two
weeks
ago
asking
for
petition
to
extend
what,
silently
a
private
patio
into
the
public
way
for
about
four
feet:
three
inches
to
expand
the
expand.
The
patio
I
think
the
only
change
that
was
requested.
The
show
planters
on
the
side
which
we've
done.
B
So
I'm,
since
the
business
hearing
and
late
yesterday
and
I,
don't
know
if
it
has
been
present
to
you,
the
Clermont.
Remember
dissociation
really
just
sent
us
a
letter
outlining
some
very
specific
concerns
is
similar
to
ones
which
I
know
that
you
had
simpler
process
around,
but
there
are
some
specifics
that
I
don't
think.
We've
had
a
chance
to
digest
about
their
feedback,
which
came
in
talking
wrong,
the
the
number
of
seats
resulting
noise
and
then
the
change
to
so
the
continuous
path
and
travel
on
Columbus
Avenue,
which
was
discussed
during
the
new
business
hearing.
B
One
thing
that
I
would
like
to
request
is:
if
it
were,
she
uses
to
yell,
have
a
conversation.
We've
had
a
number
of
conversation
with
residents.
They've
got
a
lot
of
engagement
and
there's
been
residents.
Who've
been
supporter
of
this
has
been
residents
who've
expressed
concerns
about
this,
but
for
us
to
have
a
chance
over
the
next
two
weeks
to
be
able
to
work
with
you
and
the
Clermont
Neighborhood
Association
about
their
about
their
specific
concerns
and
how
to
address
them
here.
So.
H
We
had
already
a
neighborhood
association
meeting
with
them.
They
didn't
have
any
comments
about
at
that
point
in
time.
You
know,
since
I've,
never
before
time.
Since
the
time
we
forgot
about
almost
40
people
saying
they've
support
this,
who
are
neighbors
in
the
area,
you
know
we've
already
done.
A
pedestrian
studies
show
that
there's
really
absolutely
no
impact.
We
submitted
that
to
you
guys,
I
mean
if
there's
there's
always
gonna,
be
some
level
of
noise
in
a
restaurant,
but
we're
not
you
know
we're
not
expanding
it
more.
That,
though,
it's
four
feet
out.
J
H
B
I
appreciate
you
guys
have
done
extensive
outreach.
I
know,
there's
been
a
number
of
meetings
about
this.
I
know
that
you
have
done
a
lot
of
outreach
I
think
we
got
the
letter
yeah.
Yes,
yes,
your
afternoon,
which
I
rise
you've
been
looking
for
this
sort
of
clarity
from
the
neighborhood
organization,
perhaps
for
they
want
since.
B
Think
we
have
obviously
from
a
lot
of
city
apartments
that
have
reviewed
this
around
the
accessibility,
the
path
of
travel
around
the
engineering
pieces
I've
seen
you've
already,
given
some
feedback,
which
you
guys
have
made.
Some
adjustments
to
your
plan
on
I
think
it
is
wasn't,
though,
just
for
the.
If
we
can
take
the
next
two
weeks
if
it
works,
for
you
just
be
able
to
make
sure
we
can
work
through
any
of
their
final
concerns
around
or
just
be
able
to
have
a
conversation
with
the
Claremont
Neighborhood
Association
and
be
back
here
at
the.
B
B
Know
but
they
sent
us
yesterday
a
letter
saying
that
they
do
not
support
this
and
I,
and
you
have
a
number
of
residents
who
have
written
to
us
in
support
of
this
sort
of
signed
letters
and
support
of
this
or
not
I
do
not
dispute
the
feather.
There
are
folks
who,
like
what
you're
proposing,
obviously
there's
some
residents
that
don't
we
got
this
specific
letter
yesterday
with
some
very
specific
concerns
and
I
think
that
my
sense
is
from
the
letter
which,
if
you
do
not
have
a
copy
of,
obviously
we
will
share
with
you.
We.
B
J
B
H
H
B
You've
obviously
had
that
conversation
already
in
advance.
My
judgments
already
on
the
side
street
reasonably
got
this.
This
piece
of
neighborhood
feedback
again
I
know
that
you
can
sneak
me
in
for
a
while.
I
know
that
there's
time
pressure
on
this-
and
ideally
this
thought
it
would
have
come.
This
would
come
sooner,
but
it
was
but
actually
I
guess
a
specific
request
from
the
neighbor
Association,
which
is
different
than
what
the
Neighborhood
Association
had
previously
about
you.
B
B
B
H
J
B
G
G
This
that
they've
been
a
really
good
tenant
since
2000.
This
well
and
they've
never
been
fined
or
cited
for
any
violations
of
any
kind
notice
pieces
of
litigation.
So
I
just
want
to
speak
in
favor
of
them
in
the
in
the
petition.
Presumably
that
were
problems
we
would've
heard
there
haven't
been
any
so
right.
Q
Example,
9
the
part
I
do
live
in
a
neighborhood
and
been
frequently
used
out
from
here
and
there
over
the
last
few
years,
I
have
to
concur.
Leave
is
well
run
if
we
were
talking
about
a
new
business
coming
in
a
lot
of
big
plans.
Untested
improvement.
I
can
understand
that
real
concern,
raucous
go
wrong.
I
think
that's
important
to
consider,
because
you
know
outdoor
species
in
neighborhoods
provide.
R
Hi,
my
name
is
Dan
Claude
nur
I'm,
one
of
the
owners
of
550
Columbus
I'm.
Also,
here
representing
the
board,
my
wife
is
on
the
board
of
the
condo.
The
condo
board
unanimously
voted
against.
This
did
not
want
the
extra
noise.
It's
mostly
a
noise
complaint.
We
have
no
complaints
directly
with
the
restaurant
or
very
few.
Noise
is
always
an
issue
for
our
neighborhood
and
the
people
who
live
above
it
and
our
butters
who
live
next
door
at
5:29,
have
all
asked
us
to
come
here
and
speak.
R
A
lot
of
them
couldn't
come
today
because
of
the
timing
mostly
concerned
about
the
noise
there's
a
lot
of
young
families,
especially
in
529,
and
they
feel
that
especially
considering
that
the
patio
is
open
until
midnight,
and
it
is
a
tavern
and
per
your
authorizing
statute
for
this
sidewalk
type
expansion.
It's
supposed
to
serve
food-
and
my
guess,
is
that
your
food
service
towards
the
end
end
of
the
night
drastically
drops
down
and
what
we're
concerned
with
this
Friday
and
Saturday
Thursday
Friday
Saturday
night
having
a
vey
loud
and
boisterous
crowd
out
on
the
sidewalk.
J
B
R
Also
note
just
one
thing:
I
think
that
community
the
Claremont
community
board
did
not
know
about
our
building
voting
against
it
until
recently,
and
my
understanding
from
them
is
that
they
were
told
that
they
were
that
the
building
was
in
support
of
it
and
we
voted
and
we're
definitely
not
in
terms
of
the
red
the
condo
board
itself.
So
I
just
want
to
make
clear
that
that
has
not
ever
been
the
case.
Okay,.
J
A
S
Good
morning
my
name
is
Victor.
Larry
injera
I
have
been
a
South
End
resident
for
about
six
and
a
half
years
now,
I
may
direct
a
butter
to
them
for
the
last
three
and
a
half
I
have
never
once
experienced
any
type
of
toxic,
behavior
or
loud
noises
or
anything
like
that.
It
kind
of
like
a
we
extract.
The
patio
closes
at
11:00
I,
hardly
see
people
out
there,
past
10:30,
honestly
and,
like
I,
said
as
a
directive,
butter
as
well
I,
rarely
hear
even
the
inside
or
the
outside
of
the
restaurant.
S
So
to
hear
all
these
concerns
about
a
noise
is,
quite
frankly,
somewhat
strange
to
me.
I
mean
literally
live
right
behind
them,
so
I'm
actually
100%
in
support
of
them.
Expanding
their
patio
and
I
also
believe
that
I
also
believe
that
you
know
giving
them
this
permission
would
be
attributing
to
the
thriving
vibrance
of
the
South
End
as
well.
Thank.
H
J
B
I
think
there's
a
role
that
we
can
play
in
ensuring
that
all
parties
are
come
here
because
they
appreciate
the
amount
of
outreach
which
you've
done,
which
you
have
done
and
there's
been
a
lot
of
neighborhood
conversation.
My
understanding
is
it's
a
conversation
about
this.
The
perhaps
is
a
coordinating
role
that
we
can
play
to
your
point.
H
U
U
Like
stealth,
nothing,
no
communication
and
and
again
there
should
be
a
public
dialogue,
but
I
mean
CNA
is
kept.
None
of
its
members,
sort
of
abreast
of
what's
going
on
and
I
went
to
the
meeting
at
the
five
for
us
and
others
are
meeting
here
a
couple
of
weeks
ago,
and
then
you
know
this
people
here
mostly
in
support,
obviously
not
everyone
but
would
have
a
nice
of
CN,
a
kind
of
kept
it's
deciduous
sort
of
and
aluminum
that
there
was
so
concerns
to
feel.
B
A
version
that
is
so
if
it
works
I
think
that
if
there's
a
to
continuance,
we
were
the
opposite.
Neighborhood
services
have
a
conversation
just
to
make
sure
we're
walking
through
with
you
with
CNA.
The
concerns
then
again
concerns
that
are
applicable
to
this
board
and
that
be
back
here
with
two
weeks
from
now.
A
B
A
B
All
right,
our
next
item
on
a
joint
petition
by
the
rosna
village
main
streets
in
the
City
of
Austin
Transportation
Department,
for
the
making
of
specific
repairs
within
her
Street,
a
public
way
in
West
Roxbury,
located
between
Belgrade
Avenue
and
current
Street,
in
consisting
of
a
new
tactical
Plaza,
including
new
planters,
landscaping,
bike,
racks,
public
seating,
overhead
lighting,
pavement
markings
and
traffic
control
devices.
This
was
new
business
on
August
29th
2019.
This
has
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
specific
compares
plan,
Bourke,
Street
Roslindale.
W
V
Where
we
were
here
before
you
two
weeks
ago,
with
a
set
of
plans
now
revised
for
birch
Street
in
Roslindale,
according
to
the
city
of
Boston's
tactical
public
realm
guidelines,
to
transform
the
street
into
a
pedestrian
way,
the
street
will
remain
a
public
street
and
we
will
have
trees,
planters,
movable
seating
and
additional
lighting.
Added
to
the
street.
We've
made
some
revisions
to
the
plans
added
more
details
that
Mina
can
speak
to
on
how
the
lighting
is
secured
to
the
buildings
changed.
Some
of
the
are
indicated
how
this
eating
abides
by
the
disabilities.
V
Commission's
comments
and
yeah
there's
the
revisions
and
have
been
coordinating
with
abutters
as
to
all
of
these
types
of
plans,
including
how
the
lighting
will
be
affixed
to
their
to
their
buildings,
which
we
will
secure.
Building
permits
for
from
the
building
department.
B
W
W
X
B
X
A
B
B
Thank
you.
Thank
you.
We've
got
our
next
item
on
at
repetition
about
the
city,
boss
and
Transportation
Department
for
the
making
of
specific
repairs
within
the
following
public
ways
in
Roxbury,
consisting
of
curb
realignment,
sidewalk
and
driveway
curb
cut
reconstruction
as
well
as
new
and
relocated
pedestrian
ramps.
Y
Presented
two
weeks
ago,
we're
proposing
to
install
29
speed
homes
throughout
the
neighborhood.
The
installation
of
the
speed
humps
is
designed
to
maintain
an
even
travel
profile,
speed
profile
of
20
miles
an
hour
separation
of
the
speed
humps
is
approximately
200
250
feet.
The
location
of
the
speed
humps
was
feel
terrified
to
avoid
any
impacts
to
existing
manholes
casings.
Y
A
B
Y
The
first
intersection
was
some
changes
at
Marcella
Street
in
Highland
Street.
The
dislocation
is
adjacent
to
Marcella
playground.
There's
a
lot
of
crossings
of
this
location.
It's
mark
today
as
a
crosswalk,
the
marsala
Street
transitions
between
a
26-foot
cross
section
to
it
30-foot
cross
section,
we're
proposing
to
expand
the
sidewalk
and
the
southeast
corner
by
six
feet
and
provide
directional
ramps
which
will
shorten
the
crossing
distance
across
Marcella.
Y
Y
So
at
Holland
Center
we
are
adjacent
to
a
MBTA
bus
stop
and
a
Paige
Academy.
We
have
documented
crossings
at
this
location,
and
this
this
particular
intersection
does
not
feature
crosswalk
across
Center
Street.
There
are
there's
no
marked
crosswalk
for
about
a
quarter
mile
due
to
the
pedestrian
activity
at
this
location
were
proposing
to
install
a
traffic
median
that
features
a
pedestrian
refuge
Island.
The
traffic
median
is
going
to
be
16
wide
and
includes
also
the
reconstruction
of
the
existing
Rams.
They
are
director
of
directional
Williams.
Y
Z
Y
Lynwood
intersection
is
a
fairly
wide
intersection
today,
approximately
56
feet
wide.
It
creates
a
lot
of
confusion
for
drivers
trying
to
stop
and
enter
traffic
on
Center
Street.
The
crosswalk
is
even
longer
65
feet.
Long,
we're
proposing
to
expand
north
north
edge
of
center
street
maintained
existing
36
foot
cross
section
on
Center
Street
and
and
shorten
the
crosswalk
distance
by
roughly
cap
down
to
31
feet.
The
traffic
separator
at
this
location
is
only
four
feet
wide.
Y
Y
Second
or
the
last
traffic
separator
is
on
Center
Street
and
Highland
Street.
This
traffic
separators
really
intended
to
discourage
people
from
crossing
the
double
yellow
center
line.
It
includes
a
short
straight
paper
on
the
southbound
approach
that
is
on
a
steep
grade.
The
intent
of
that
straight
section
is
to
introduce
the
drivers
to
the
raised
island,
bring
awareness
to
this
new
physical
element
to
middle
of
the
road
and
then
direct
them
around
the
this
corner.
Y
A
E
I
just
wanted
to
make
a
comment
on
sheet
six.
My
recent
record
shows
so
this
is
Center
Street
at
Highland
Ave,
our
existing
Wanda
mean
the
sixteen
inch
duct
on
line
cement.
My
1983
is
actually
on
the
north
side.
We
have
the
specific
repairs,
it's
actually
closer
to
the
curb,
but
just
you
know
just
be
aware
that
it's
there
what
I'll
do
is
I'll
just
send
you
plans
to
see
you.
You
know
where
it
is
we'll.
E
B
K
L
L
B
Moving
on
to
our
next
set
of
new
business,
132
and
201
Brooklyn
Avenue
Fullerton
Street
come
on
out
Street
Boston
Proper
discontinuance
is
winding
relocations,
pedestrian,
easement,
specific
repairs
on
a
set
of
track.
Petitions
by
fenway
enterprises,
132
Brooklyn,
Avenue
LLC,
and
the
landmarks
on
our
owner
of
the
bit.
A
AA
Take
this
in
to
take
before
we're
talking
about
the
late
mark
center
on
this.
For
one
part
drive,
this
is
a
multi-phase
master
plan.
We
have
worked
here
about
a
year
ago,
maybe
a
little
bit
more
for
the
first
phase
of
the
improvements
which
include
the
park
that
we
built
in
front
of
the
building
fronting
the
muddy
river
and
some
of
the
work
along
for
a
quite
a
venir.
AA
This
is
Brooklyn
Avenue,
Park
Drive,
and
the
next
phase
is
a
little
bit
hard
to
read
with
the
next
phase
involves
an
expansion
of
the
non
historic
East
Building
the
existing.
So
this
is
a
site
plan.
This
is
one
River
Park,
Drive
Brooklyn
have
been
waiting
station,
so
the
first
phase
the
project
was
to
create
entirely
new
green.
The
front
of
the
building.
We
converted
best
buy
parking
lots
of
one
in
your
Park
treated
to
food
hall
of
the
building
really
moved
away
from
tenants
that
were
more
at
large,
warm
at
retail.
AA
To
binary,
who
created
permeate
blow
me
through
through
the
building
from
the
train
station
to
the
neighborhood
so
face
one
included
landscaping
all
the
way
from
the
train
station.
Apart
and
along
Brooklyn
Avenue
up
to
about
the
area,
the
Regal
Cinema
entry,
the
next
phase
of
the
project
is
which
was
provided
PPA
originally
in
2014
and
then,
after
a
notice
of
project
change.
AA
A
AA
AA
AB
AB
Essentially
the
projects
proposing
a
number
of
different
streetscape
improvements
that
includes
gassyface,
concrete
sidewalks
street
lighting
infrastructure
street
trees,
extend
the
furnishings
over
the
pavement,
as
well
as
curb
realignment
and
forestry
importance
of
Kilmarnock
Street
and
for
planetary.
Now,.
Z
AB
AB
Building,
which
is
essentially
the
old
brick
arts
building
situated
red
the
corner,
unfortunate
for
clock
app
and
what
the
project
is
proposing
to
do
is
essentially
shift
the
facade
a
lot
for
history,
inward
toward
the
site
away
from
the
roadway
and
that
allows
for
the
creation
of
new
cast
in
place.
Concrete
sidewalks
inform
history,
as
well
as
the
furnishing
zone
that
acts
as
a
barrier
between
the
pedestrian
path
and
to
behavior
travelers.
AB
Also,
in
addition
with
that,
as
part
of
this
proposal
proposing
to
the
wide
open
street
so
that
current
record
with
a
little
bit
wider
and
what
that
does
is
it
creates
an
opportunity
to
install
or
or
construct
the
westbound.
The
bike
lane,
as
well
as
additional
storage
capacity
for
country,
also
making
a
little
easier
for
these
larger
trucks
to
make
return
the
optical
instrument
or
thumb
or
your
teeth
will
come
out.
So
that
was
another
key
problems.
AB
Related
is
treaty.
If
you
they're
gonna,
hear
about
mid-block
on
4th
Street
that
currently
serves
an
ancillary
parking
area,
it's
the
Acura
that
great
parking
space
essentially
as
participial.
We
would
close
that
perk
up
and
reposition.
This
areas
would
now
become
the
new
brother
acts
book
to
the
garage
and
the
loading
space
to
bloody
force
today
distant
garage
access,
historic
Taylor
industry.
Again,
we
just
sliding
the
primary
access
points
about
big
block
industry.
AB
AB
AB
F
AB
K
AB
AB
AB
AB
A
AB
Throughout
the
process,
we
received
some
really
good
feedback
that
was
incorporated
into
the
drawings.
Okay,
an
example:
we
met
with
BTS
miner,
saying
that
the
city
has
a
capital,
Drupal
project
plan
for
the
Brooklyn
Avenue
right
away,
and
it
may
include
new
bike
lane
facilities
and
potentially
of
a
northbound
bustling
length
along
this
corridor,
pond
Avenue.
AB
Aside
from
VTE
that
we
didn't
have
a
chance
to
meet
with
boss
Loretta
our
process,
we
do
have
an
approved
site
plan
which
it
just
came
in
last
month,
so
we're
happy
to
say
that
they
have
that.
In
addition,
area,
brothers
have
support
from
a
b
a
b
b
b
tv
excuse
me:
the
disability,
commission,
neighborhood
services,
verizon,
national,
great,
etc.
So
we're
having
to
for
the
next
up
the
process
again,
thank
you
for
let
us
propose
or
meet
with
you
to
talk
about
their
any
project
without
ethical
questions.
B
So
these
40
coughing
the
beauty,
conversations
obviously
further
towards
Beacon
Street,
there's
the
Bee
Gees
working
on
sir,
that
new,
a
new
path
Jason
to
your
property,
that
it's
nice
to
reconnect
with
the
muddy
river
I
know
that
does
play
outside
the
extent
of
this,
but
I
Superbike
facilities
working
at
the
Fulton
would
actually
connect
to
that
path.
Is
that
right,
yeah.
AA
C
AB
So
at
this
time,
Greg
Rooney
has
approved
our
conceptual
design
report.
I
know,
there's
been
some
back-and-forth
I
think
that
you've
been
copied
on
that
we're
gonna
continue
more
closely
with
BT
to
make
sure
our
design
is
consistent
with
btv
standard.
Make
sure
that
that
control
box
is
in
a
position
where
it
makes
sense
and
especially
think
about
the
bike
lane
we're
thinking
about
all
these
things
that
were
to
work
through
with
your
office.
AB
G
B
Pickup
drop-off
that
happens
at
the
Regal
theater
I
assume
this
is
also
gonna,
create
even
more
pickup
drop-off
demand.
Essentially,
on
that
block
base,
we've
done
the
pilot
one
block
away
from
you
for
pickup
drop-off.
We
should
be
finding,
as
we've
learned,
take
lessons
learned
from
that.
How
that
also
it
could
be
looking
at
the
block
phase
here,
I'll
go
find.
AA
Out
yeah
I
mean
one
of
the
things
we've
done
as
well
as
a
little
bit
of
further
down,
but
we've
been
working
with
the
ride-sharing
companies
to
change
their
drop-off
pin.
So
we've
shifted
it
to
the
front
of
the
building
and
we've
actually
created
a
turnaround
zone
on
partner
eyes
so
that
people
don't
even
have
to
go
into
the
garage
turn
around
or
you.
AA
C
AB
Conceptual
design
report,
so
our
signal
team,
as
well
as
our
traffic
team
internally,
we
submitted
a
you,
know
a
pound
of
paper
essentially
to
take
corrective
and
it
included
site
plans,
signal
drawings,
a
book
marking,
drawings
and
he's
comfortable
with
it.
At
this
time,
we
just
found
out
that
there's
a
bike
lane
a
city
project,
essentially
that
we
need
to
incorporate
into
those
drawings.
So
that's
essentially
the
final
piece
from
there
I
think
we'll
be
able
to
get
into
the
nitty-gritty
signal
design.
Some
of
the
timing,
the
sequences
things
of
that
nature,
but.
AB
Correct
absolutely
we've
engaged
our
burgers
and
he's
been
he's
been
part
of
the
conversation
dating
back
to
phase
1
of
the
project
so
have
redundant
conduit
that
you'd
mentioned.
You
know
it
extends
currently
to
the
limits
of
the
phase
1
project
as
part
of
phase
2.
We
would
extend
that
along
the
sidewalk
in
Brooklyn
Avenue
as
well.
So
we've
pointed
that.
AB
AA
AA
AA
Very
elaborately
bttm
TPA
planning
staff
to
ensure
it
related
actions,
particularly
lated
actions,
are
consistent
with
a
12-point
plan
projects
approved
for
488
units.
We
are
the
site
itself
is
over
between
the
surrounding
neighborhoods
Jodi
Kaus
Hill
for
Savin
Hill.
So
one
of
the
fundamental
aspects
of
the
plan
is
creating
a
new.
It's
actually
private
drives
of
won't
show
up
in
the
big
plans.
What
I
do
really
a
publicly
accessible
open
space
and
connection
through
the
neighborhood
placing
about
over
a
hundred
street
trees
couple
thousand
square
feet
new
sidewalks.
AA
Ferocity
through
this
block,
it's
currently
comprised
of
actually
demolished,
but
it
used
to
be
industrial
buildings.
It
was
a
real
barrier
to
traffic
connectivity.
So
this
is
an
aerial
view
here.
Let
the
street
freak
out.
We
passed
a
building
going
back
to
the
article
ad
process
on
a
prior
developer
and
proposed
an
above
grading,
marketing
team
owners
more
or
less
middle
the
site.
We
worked
to
put
it
below
great
open
up
more
open
space,
get
over
eight,
your
open
space
in
the
project,
increased
setbacks
and
reduced
heights
of
buildings
along
the
way.
AA
AA
For
one
way
and
from
God
out
two-way
drives
coming
in
that
corner,
Pleasant
Hancock
up
to
Hancock
part
of
our
mitigation
is
where
rebuilding
is
the
intersection
you're
working
through
the
BTD
review
process
on
that
we're
approaching
the
75%
design.
So
that's
that
would
be
in
front
of
you,
probably
hoping
in
a
few
weeks,
but
we
separated
that
action
from
the
project
related
actions.
AA
AC
AC
A
AC
B
A
C
AC
T
C
AA
I
think
the
master
plan
for
the
other
side
of
the
street
contemplates
blocks
it
Auckland
into
our
street
and
there
was
not
I
mean
there
was
really
no
mid-block
crossing
proposed.
There.
We've
thought
you
know
over
time,
maybe
as
that
side
of
the
street
develops,
there
ought
to
be
a
mid
block,
pedestrian
crossing-
that's
not
included
in
the
in
the
plans.
At
this
point,
we're
really.
C
AA
AA
B
J
A
AD
AD
AD
A
AC
Actually,
the
curb
line
has
been
moved
towards
the
site
to
accommodate
the
future.
While
eating
restricting
of
curb.
We
have
a
three
half
foot
furnishing
zone
with
the
trees
street
lights
and
by
rekhs,
and
then
sidewalk
and
our
pedestrians
to
the
back.
Sidewalk
you'll,
see
on
the
planes
mirror
showing
cafe.
A
AC
AC
AC
AC
AC
AC
K
AA
L
C
AD
So
just
to
clarify,
because
the
proponent
is
granting
a
10
foot
wide
pedestrian,
easement
or
highway,
each
name.
Excuse
me
along
a
Chester
Avenue.
What
we've
chosen
to
do
now
is
that
what
we're
calling
outdoor
seating
areas
they're,
not
technically
cafes,
because
we
don't
have
operators
and
we
don't
know
exactly
where
they're
going
to
be,
but
what
all
we
are
doing
is
getting
conceptual
agreement
as
to
where
those
outdoor
seating
areas
are
going
to
be
in
front
of
the
two
buildings
that
we'll
have
ground
for
commercial.
AD
L
So
the
this
should
show
up
primarily
is
like
public
outdoor
seating
until
we
have
an
operator
but
point
we
will
verify
the
dimensions
is
that
it
all
works.
We've
asked
them
to
slow
back
the
building
for
our
future
Dorchester
plans,
but
right
now,
they're
going
to
be
the
only
recessed,
so
they're
gonna
occupy
the
setback
with
the
cafe
until
such
time.
L
AD
This
block
this
project
has
a
lot
of
crunch
under
Chester
Avenue,
but
there
is
a
building
right
at
the
building
building
line
to
the
north
and
then
there's
also
property
to
the
south.
So
this
is
Jeff
block
for
any
future
lightning,
the
virtuous
gravity,
but
in
the
meantime
there
could
be
interim
period
where
there's
the
possibility
of
side
effects.
B
AA
C
AD
A
C
Z
Z
AE
Or
retention
along
West,
second
Street,
as
as
Steve
had
mentioned,
the
foundation
wall
for
the
below
grade
space
is
going
to
extend
up
to
property
line
on
West
second
Street.
In
order
to
construct
that
below
great
space,
we
are
proposing
a
supportive
excavation
system
that
extends
out
into
the
public
way
along
West.
Second
Street.
This
is
a
similar
system
to
when
it
previously,
but
approved
many
months
ago
by
the
public
Improvement
Commission
along
West,
first
Street,
who
now
expanding
that
approval
to
also
capture
earth
retention
along
West,
2nd
Street,
north
retention.
AE
AE
The
height
of
Earth
that
is
being
retained,
it'll
be
a
braced,
supportive,
excavation
system
along
West.
Second
Street
internal
bracing
only
consisting
of
steel
breakers,
extending
into
our
site
all
components
of
the
supportive
excavation
system,
including
the
breakers
and
six
feet
of
the
soldier.
Piles
that
extend
on
West
second
Street
will
be
cut
and
removed.
Following
the
completion
of
the
below
grade
excavation
excavation
will
extend
through
fill
and
into
the
Glacial
bearing
soils,
we
do
not
have
organic
soils
on
our
site,
so
we
don't
expect
that
odors
will
be
an
issue
during
construction.
C
Z
C
B
AF
Where's,
chair
medical
from
gradients
Cano
on
behalf
of
one
Newton
Street
with
me,
as
well
as
Jody
Ganges,
to
my
right,
we're
here
this
morning
seeking
a
vertical
discontinuance
at
one
Newcomb
Street.
By
way
of
brief
background,
this
request
is
being
made
in
conjunction
with
an
approved
residential
development
at
one
knew
who
street
the
project
contains
23
residential
units
in
a
six
story.
Building
the
project
went
through
the
PPD,
a
small
project
review
process
and
was
approved
by
the
BPD
board,
as
well
as
the
Zoning
Board.
AF
Looking
as
for
the
vertical
discontinuance
itself,
we're
seeking
it
for
a
series
of
bump
out
surveys,
starting
at
the
second
floor
and
extending
through
the
roofline
for
building
the
bump
out
start
approximately
12
feet
above
grade
and
extend
5050
three
and
a
half
feet
above
that
start
go
pretty
much
the
2nd
through
the
6th
floor
of
the
building.
The
total
area
of
discontinuance,
as
you
can
see
by
the
plan,
I
submitted,
is
2.3
feet
by
18
point
3
3
feet
for
a
total
discontinued
area
of
42.2
square
feet
and
2257
cubic
feet.
B
AF
AG
C
AG
X
K
B
X
We
coordinated
that
with
the
disabilities
Commission,
we
looked
at
that
there's
a
street
like
control
box
on
the
opposite
side,
that
sort
of
prevents
us
from
physically
retards
in
the
other
side.
So
we
have
adjusted
the
proposed
ramp
based
on
the
comments
that
we
received
to
them
to
make
it
as
best
as
we
could.
B
P
W
P
A
very
brief
piece
of
context:
these
two
intersections
were
part
of
our
a
larger
corridor
improvement
plan
for
Beacon
Street
through
the
Back
Bay,
an
additional
traffic
calming
bike
facilities,
etc.
Improving
signals
to
changing
signals
to
improve
the
pedestrian
experience
inoperability
these
two
specific
intersections.
AH
Wanted
to
do
another
perfect
session
across,
but
there
was
a
desire
to
potentially
work
currently
there's
another
traveling,
that's
making
a
left
turns.
We
want
to
maintain
that.
But
the
really
nice
thing
about,
maybe
the
the
curb
ramps-
is
get
more
space
to
dwell
there
as
a
pedestrian
I
meant
a
week
and
then.
L
AH
Oh
really
important
thing
to
is
really
sensitive
to
drainage,
and
so
we
don't
want
to
impact
that
as
much
as
possible
to
escalate
costs
so
in
all
corners.
All
of
the
drainage
structures
are
maintained,
which
also
accounts
for
why
the
curve
essentially
look
a
little
funky.
There
they're
a
little
tighter
than
normal,
but
we
have
been
working
with
Public
Works
for
the
last
year,
so
these
dimensions,
the
radii
of
those
parents
and
their
extensions
themselves
and
they're
on
board.
AH
AH
Oh
and
one
last
thing
is
gal:
supporting
with
the
utility
company
is
our
source
because
they
have
some
big
bolts
here,
which
we
want
to
make
sure
that
we
don't
disrupt.
But
we
also
recommend
them
to
lower
our
bolts.
Because
it's
in
one
of
the
key
positions
that
we
need
to
lower
the
sidewalk
a
little
bit
to
make
sure
that
we
meet
our
rates
for
a
da.
B
B
E
And
they
just
had
another.
We
had
a
couple
other
comments,
so
one
of
the
existing
catch
basins.
If
you
look
at
the
handicap
ramp,
they
look
like
they're
close
to
the
beginning
of
the
taper
or
the
middle
of
the
taper.
We
just
want
to
make
sure
that
we
can
fit
got
a
mouth
on
all
the
solid
catch
basin.
So
you
you
know
if
you
can't
fit
them.
They'll
have
to
just
move
to
catch
basins.
Okay,
Denise.
A
E
AH
AH
Although
the
grip
that's
installed
there,
even
coordinated
to
redo
that
break
as
much
as
possible,
especially
in
the
the
north
east
and
southeast
locations,
where
there's
not
enough
space
behind
it
to
deploy
the
concrete
and
there's
been
a
request
to
make
that
all
brick
so
we'll
have
a
special
consideration.
That
was
the
flatlining,
especially
on
those
eastern
corners
and
we've
been
working
with
Public
Works
and
that's
some
feedback
that
they
provided
us
or
how
we
should
reconstruct
this.
AH
E
AH
A
AH
AH
B
AH
AH
AE
B
B
Z
AI
Minutes
good
morning,
commissioners,
thank
you
very
much
on
behalf
of
the
secretary
and
myself,
who's
been
managing
this
project
for
the
last
nine
months.
I
want
to
thank
you
for
accommodating
us,
we're
a
little
bit
under
a
tight
schedule
which
we'll
explain
in
a
minute
since
the
city
of
Boston
last
had
ownership
of
the
Chelsea
Street
Bridge
her,
but
a
few
things
that
have
happened.
It
was
reconstructed
and
opened
in
2012
and
as
you're
aware
it
went
from
avascular
to
vertical
lift
the
span
is
longer
and
the
lift
goes
to
170
feet.
AI
This
was
done
done
to
address
the
Maira
of
safety
issues
and
incidents
that
were
occurring
on
the
creek
and
I
am
happy
to
report
that,
since
that
bridge
has
been
open,
there
have
been
no
maritime
incidents
on
the
bridge.
An
unfortunate
consequence
of
that
bridge
is
that
it
has
had
a
great
impact
on
traffic
and
both
from
East
Boston
and
for
Chelsea.
AI
They
have
handwritten
logs
and
they're
a
phone
call,
so
it
makes
it
very
difficult
to
notify
the
public
on
when
it's
gonna
lift
and
sometimes
people,
and
actually
more
often
than
we
would
like,
are
waiting
up
to
two
hours
to
get
across
the
bridge.
We
were
fortunate
enough
to
find
and
and
make
progress
with
federal
highways
to
receive
a
grant
to
do
the
improvements
and
the
movements
actually
impact
the
bridge
itself,
but
also
benefit
East
Boston,
and
what
we're
here
to
do
today
is
to
walk
you
through.
AI
T
So
the
major
portions
we're
here
to
talk
about
today
are
two
variable
message:
signs
are
proposing
on
Chelsea
Street
in
East
Boston.
We
found
through
various
stakeholder
outreach
that
the
existing
warning
signs
are
the
most
helpful
thing.
That's
been
done
for
travelers
for
the
bridge
and
they
essentially
say
Chelsea
Street
Bridge.
T
As
you
can
see
from
the
plans,
we
designed
these
signs
to
try
and
minimize
impacts
on
the
sidewalks
for
the
utility
trenching,
because
these
will
be
utility
powered
this
first
plan
here
on
Chelsea
Street
I,
guess
you
were
proposing
right
near
an
existing
utility
line.
This
is
a
road
side
mounted
sign
it's
four
feet
wide
and
there's
plenty
of
pedestrian
clearance.
Here
from
the
edge
of
the
pole
to
the
back
of
the
curve,
it's
ten-foot
sidewalk.