From YouTube: Public Improvement Commission Hearing 9-6-18
Description
The Boston Public Improvement Commission (PIC) is the owner and regulator of the City's rights of way. The PIC plays an integral role in the City's development and permitting process. From the restaurant that wants to add a seasonal cafe on the public sidewalk, to the developer who wants to construct an underground parking garage for a new housing development, or the homeowner who wants to add an architectural feature to a house that juts into the public space, each must seek approval from the PIC to have its private venture occupy public space, either permanently or on a licensed basis.
A
A
Good
morning,
public
Improvement
Commission
hearing
of
September
6
2018,
our
first
order
of
business,
is
to
note
that
the
minutes
from
the
previous
public
Improvement
Commission
meeting
will
reviewed
and
approved
by
the
PSE
staff.
Our
first
item
of
business
is
a
public
hearing
continued
on
a
joint
petition
by
Broadway
and
8th
Street
LLC
in
the
Boston
Planning
and
Development
Agency
for
the
vertical
discontinuance
of
portions,
of
the
following
public
ways
in
South,
Boston
vertically
above
and
below
grades
in
the
sidewalks.
A
The
locations
are
West
Broadway
on
its
southwest
least
sided
addresses
number
79,
89
southeast
of
a
street,
a
street
on
the
southeast
side
southwest
of
West
Broadway.
This
was
new
business
on
July
12
2018
and
had
its
first
public
hearing
on
August
23rd
2018
possessed
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
airspace,
subsurface,
discontinuance
plan,
79,
89,
West,
Broadway,
8th
Street,
South
Boston
three
sheets.
Yet
at
June,
29th
2018.
B
C
D
So
the
79
89
West
Broadway
project
we're
at
the
intersection
at
West,
Broadway
and
a
street
in
South
Boston
will
be
a
proposal
as
to
replace
a
gas
station.
We
have
a
six
story:
mixed-use
building
commercial
ground
floor
space
about
65
residential
units
above
ground.
The
petition
today
is
for
discontinuance
of
balconies
that
are
overhanging
the
property
along
West
Broadway
and
along
a
street,
and
then
also
we
have
footings
for
the
columns
of
that
first
floor.
Overhang,
also
extending
over
the
property
line.
E
Petition
by
Broadway
in
a
street
LLC
for
the
Boston
Planning
development
agency
for
the
vertical
discontinuance
of
portions
of
the
falling
public
waves
in
self
lesson
is
written
to
the
record.
Play
chair.
I
shown
the
set
of
plans,
internal
city
of
Boston,
Public,
Works,
Department
engineering
division,
airspace,
subsurface,
discontinuous
plan,
79,
89,
West,
Broadway,
8th
Street,
South,
Boston,
June,
29,.
B
G
A
G
G
G
G
C
A
B
G
G
A
Sean.
Our
next
item
is
on
a
petition
by
Emerson
College
for
the
making
of
specific
repairs
within
Boylston
Street
Boston
Proper,
located
on
the
south
side,
address
number
76
through
162
between
tremon
Street
and
Carver
Street,
consisting
of
curb
realignment,
sidewalk
and
pedestrian
ramp
reconstruction,
as
well
as
new
and
relocated
specialty.
Pavement
pavement
markings
by
crack
street
furniture,
planters,
landscaping,
irrigation
infrastructure,
private
utility
infrastructure,
a
digital
campus,
wayfinding
information,
kiosk
and
arrays
crosswalk.
H
H
Changes
in
the
sidewalk
design
that
we
showed
you
sidewalk,
banding
and
width
changes
have
occurred,
we've
removed
the
banding,
expanded
the
widths
to
accommodate
needs
and
requests
of
the
disability.
Commission
we
met
with
the
group
say
we're
very
pleased
with
all
of
it,
including
the
handicap
selection
spots
and
the
entryways
which
we
will
improve,
and
the
cross
slopes
have
improved,
so
I.
Think
if
you,
if
you
speak
to
them,
they
have
they
have
given.
This
report
is.
K
C
H
H
H
For
example,
the
little
building
will
be
accommodating
all
new
freshmen.
Both
freshmen
are
new
all
freshmen
and
they
will
load
in
from
7:00
a.m.
to
7:00
p.m.
so
we'll
get
the
major
move
done
in
that
day,
the
returned
students
will
also
have
some
separate
buildings,
but
we
can't
put
them
all
in
the
one
in
one
building.
Each
of
the
move-in
families
has
a
time
to
be
there
right.
Now
they
get
30
minutes
in
the
future.
E
H
For
the
little
building
it
will
be,
we
will
be
using
trim
on
street
Allen's
alley
and
we
will
be
utilizing
the
state
transportation
buildings
parking
lot
with
campus
available
in
the
lobby
of
the
little
building,
so
they'll
be
moving
around
at
this
point.
I
don't
know
at
this
point,
I
haven't
been
told
that
but
I
will
keep
you
yeah
well,
I
know
they'll
pull
in
there
and
that's
another
question.
You
actually.
E
H
And
they
do
move
them,
and
that
is
the
new
program
that
you
asked
for
to
which
was
well.
How
are
we
going
to
keep
those
via
those
trucks?
Emerson
College
is
Police
Department.
The
chief
has
agreed
to
having
two
officers
dedicated
to
that
spot
to
those
spots
all
along
Boylston
Street,
for
as
long
as
it
takes,
and
you
know
that
might
be
forever,
but
two
additional
offices
they
will
hire
to
actually
enforce
it.
H
So
they
went
to
the
president
they've
gone
to
the
their
staff
and
they
they
actually
felt
that
in
order
to
get
the
commitment
truly
to
be,
in
effect,
they
had
to
hire
more
officers
and
they
got
permission
to
do
that,
so
that
enforcement
will
happen.
I'm
thrilled,
so
I
hope,
you're
happy
as
well.
You
know,
and
they
will
we.
H
H
H
That's
the
other
answer
to
question
both
of
those
the
mid-block
crossing
which
begins
at
the
entrance
to
Boylston
place,
I'm
trying
to
segment
all
those
and
give
you
a
sense
why
a
mid-block
crossing
the
research
that
we've
done
and
continue
to
do
has
shown.
This
is
a
need
with
the
following
data
and
the
following
opinions
prior
to
the
colonial
open
opening.
H
H
K
K
C
L
Who
the
following
you
are
drawing
the
pants?
Yes,
so
dumb,
hey
spud
said:
do
one
of
the
two
things
because
you
are
putting
a
meet
block
race
cross
border,
so
you
are
trying
to
create
a
level
of
safety
of
perceived
safety,
so
topic
8
on
the
Benedictus
engineering
team
at
be
ready,
but
simultaneously
make
an
assessment
as
to
whether
you
need
to
pack
the
interception
in
case
we
need
to
put
overhead
planishing
activated.
It
is
same
for
flight
that
sort
of
stuff.
C
L
To
say
in
a
very
it
will
be
you
you
should
be
able
to
catch
on
to
what
I
am
saying
without
me
saying.
So,
if
I
were
you,
you,
which
you
should
be
coming
back
to,
are
saying
that
you
will
crack
it
so
that
the
underground
hardware
is
available,
and
the
petitioner
is
willing
to
add
that
piece
of
hardware
if
it
is
needed
from
the
transportation.
E
I
We
have
done
an
analysis,
we've
looked
into
traffic
volumes
and
stream
volumes
and
the
the
warrants
are
not
met
for
a
signalized
crosswalk.
So
it
needs
to
be
an.
L
Sir
yeah,
it
is
awkward
for
us.
Yes,
I'll
do
that
little
bit
of
work,
but
since
you
are
sincere
or
acknowledging
that
there
is
a
pedestrian
need,
but
you
want
to
be
calculus
pontificate.
You
guys
know
this
better
than
we
do
or
as
well
as
we
do
to
the
underground
hardware
so
that
people
flashing
akin
is
needed.
It
is
not
an
afterthought
to
care
everything.
These
are
proactively
guys
doing.
You
are
not
good
at
this
stuff.
Okay,
we.
E
L
L
H
B
K
I
Intersection,
yes,
so
the
the
intersection
today
has
a
very
generous
exclusive
pedestrian
phase.
So
there's
nothing
in
the
street
changes
that
would
impact
the
delay
for
pedestrians.
They
will
have
the
same
wait
time.
They
will
experience
the
same
and
it
is
very
generous
period
that
the
red
to
red
is
is
something
like
29
seconds.
So
we
were
not
anticipating
that
pedestrians
would
have
any
difference
in
their
experience
at
the
intersection
with
the
changes.
I
E
L
L
A
M
C
C
M
F
M
B
A
E
Competition
by
Emerson
College
for
the
making
specific
repairs
within
Boylston
Street,
Boston
Proper
has
written
and
record
by
the
chair
in
consisting
of
curb
realignment,
sidewalk
pedestrian
ramp
reconstruction,
as
well
as
new
relocating,
especially
pavement
pavement
markings
plague,
black
street
furniture
and
planters
landscaping,
irrigation
infrastructure,
private
utility
infrastructure,
individual
campus.
While
we
finding
information,
kiosk
and
raise
and
plus
we're
raised
for
us,
we
all
show
another
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering,
the
ladies
Pacific
repairs
when
76
162,
Boylston
Street
Everson
call
it
wasn't
done
before
she's
dated
August
2018.
C
A
Item
is
on
a
petition
by
Comcast
of
Boston
for
a
granted
location
with
weave
company's
status
and
no
participants
to
install
new
telecommunication
conduit
with
city
shadow
within
the
following
public
way.
As
in
Boston
Proper
locations
are
new
Market
Square
generally
between
Gwynn
way
and
Southampton.
Street
Theodore
a
grid
way
between
Massachusetts
Avenue,
a
South
Hampton,
Street,
Topeka
Street
northeast
of
Southampton
Street.
A
O
Last
meeting
we
discussed
the
possibility
of
any
participants.
I
submitted
the
emails
back
to
Todd
that
we
received
Verizon
got
back
to
me
right
away
last
Friday
there's
no
new
developments
that
there
that
there
need
to
do
at
this
time
and
then
the
telecommunication
companies
as
well
have
nothing
in
that
area.
It's
a
large
commercial
area,
so
I
don't
think
they're
getting
much
out
of
it.
A
O
So
yep,
so
we're
gonna
be
installing
for
forage
conduit
with
the
to
tell
quad
doc,
tell
de
for
the
city
shadow
we're
starting
over
at
pompeii
street
crossing
Mass
Ave
continuing
down
Theodore
going
way
to
Topeka
Street,
then
we'll
also
from
theater
going
way
we're
going
down
new
Market,
Square
and
continuing
down
to
225
self
hand
industry
which
it's
been
a
final
destination.
L
C
K
P
C
C
B
A
Thank
you.
Our
final
public
hearing
item
is
on
a
petition
by
first
light,
fiber
for
a
grant
of
location
with
Reid
company's
status
and
three
participants
to
install
new
telecommunication
conduit
with
City
shadow
within
the
following
public
ways
in
Boston
Proper
Berkeley,
Street
generally,
between
Boylston
Street
and
st.
James
Avenue
with
st.
James,
Avenue,
Southwest
and
Berkeley
Street.
This
was
new
business
on
August,
23rd,
2018
and
assessed
shown
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
barn
engineering
division,
granted
location
plan,
200,
Berkeley,
Street
Boston
for
sheets
in
September,
5th,.
Q
I'm
Shelly
Cullen
with
access
engineering,
and
this
is
John
Barry
from
access
engineering
and
we're
representing
first
light.
This
is
Danny
Pelletier
from
first
light,
so
basically
we
petitioned
for
LEED
company
status
and
in
the
grant
of
location
we
put
notice
out
and
we
received
actually
three
participants
who
are
interested
in
this
dig.
Because
of
that
we
were
asked
to
add
an
additional
city
city
shadow.
So
we've
done
that
and
we
are
in
the
process
of
getting
all
the
paperwork
completed.
Q
B
A
J
E
E
B
B
R
Mr.
chairman,
commissioners,
for
the
record
work
hard
on
Susan
from
pencil
belt,
I
here
on
behalf
of
the
petitioner
extant
systems
and
John
Morrison
from
UC
synergetics.
An
engineer
and
Commissioner
assist
a
continuing
effort
by
X
net
systems
to
extend
its
wireless
vast
network
by
utilizing
the
city's
street
lights,
and
these
digs
involve
essentially
four
notes
that
are
located
in
the
Back
Bay
I'll
or
the
notes
were
brought
to
the
VBAC
back
bay,
architectural
commission
and
we
have
a
certificate
of
appropriateness
from
just
for
the
record.
Please.
L
R
C
R
A
R
R
N
E
R
E
C
E
E
L
R
I
think
that's
clearly:
the
trend
in
the
industry
is
to
just
make
everything
smaller.
The
pressure
is
both
on
the
carriers
and
also
the
manufacturers
to
try
to
find
a
way
to
do
that.
We
believe
we've
gone
a
long
way
if
you
compare
it
to
a
typical
macro
sight,
but
our
that's
absolutely
the
direction,
and
we
we
communicate
that
message
every
time
that
we
speak
to
them.
So
myself
included.
L
Please
don't
be
compelled
to
answer
this
question
but
being
a
position
where,
in
the
future
you
I
have
miniaturized
it
to
a
point
where
it
is
actually
pleasant.
Will
you
be
in
a
position
to
retrofit
now,
all
the
other
ugly
ones
or
the
whole
less
desirable
part
keep
that
in
the
back
of
your
mind.
Yes,.