Terry
consider
authorizing
the
minutes
of
the
following
meetings:
jun,
22nd,
2015
council
be
so
moved.
Second,
a
little
vinegar,
unanimous
consent
agenda.
We
report
for
june
five
report
for
june
fire
department
reports
for
the
six
month,
comparison
of
214
and
2
15
jun,
2
15
library,
report,
amendment
to
the
corner
of
plowing
contract
and
the
nile
and
your
board
appointments.
A
C
D
A
G
F
G
F
A
F
F
D
E
F
Taxi
for
proper
age,
20
30
was
kept
by
the
city
to
demolish
aslam
blight.
In
accordance
with
the
dep
regulations,
we
had
a
site
survey
done
for
asbestos,
however,
given
the
state
of
the
building
asbestos
demolition
impacts
serving
cannot
be
completed
as
such,
the
demolition
must
be
done
in
accordance
with
main
DEP
rules.
Even
though
this
is
a
residential
home
when
it
was
tax
acquired
by
the
city,
BP
classifies
it
as
a
commercial
property.
F
The
requirements
for
demolition
are
a
lot
more
stringent
than
if
it
were
to
me,
then,
if
it
were
to
be
considered
a
residential
property,
we
went
out
for
bids
on
the
project
based
on
the
scope
of
work
done
by
chces,
and
we
received
one
bit
of
23,000
850
from
sauber
construction.
They
didn't
know
I'm
a
bid
that,
if
there's
friable
ACM
that
a
change
order
would
be
need
needed
to
be
ordered
for
sampling.
Analyzing
abatement
packaging
disposal
is
for
the
community.
F
If
the
building
was
in
better
shape,
we
would
know
for
sure
there
was
any
friable
materials.
We
did
have
to
do
some
abatements
on
the
properties
on
collins
street
last
year
and
those
ones
ran
between
two
thousand
to
four
thousand
dollars.
So
if
we
run
into
anything
here,
that's
kind
of
the
ballpark
rule
would
expect
the
big
does
not
include
tippy
fees,
which
probably
two
to
five
thousand.
We
would
be
built
directly
by
trican
heading
landfill,
so
the
cost
of
the
project
we
paid
for
our
paid
from
the
techs
acquired
property
remediation
reserves.
E
F
G
D
To
purchase
that
house,
when
it
after
it
had
been
tax
acquired,
was
intent
on
rehabbing
it
and
it
I,
don't
feel
once
they
figured
out
what
they
really
had.
That's
why
it's
like
it
is
today,
and
the
only
other
question
I
would
have.
Is
that
I
realized
that
when
we
sell
tax
for
a
property,
we
are
setting
money
aside
for
this
purpose,
but
it's
almost
half.
G
F
F
A
lot
of
money
I
mean,
if
the
council
wanted,
we
could
try
and
go
out
for
an
asbestos
survey,
try
and
get
something
that
would
go
through
the
house,
which
I
don't
know
if
we
can
get
anybody
go
through.
The
house
is
in
very
rough
shape
and
we
can
always
go
up
for
bids
again,
but
the
fact
that
there's
the
asbestos
issue
there
is
the
biggest
driver
cause
where's.
D
F
C
F
F
F
F
C
B
D
F
B
F
B
G
F
B
In
that
type
of
project,
isn't
just
not
a
it's,
not
a
sought-after
project
in
that
industry,
so
I
mean
I,
yeah,
I,
just
I,
guess
in
the
future.
I
would
say
that
probably
something
to
take
into
consideration
on
those
that
contractors
are
full
up
right
now,
you're
going
to
get
a
place.
That's
indicative
events
whose.
F
F
1.5
million
btu
cost
fifty
one
thousand
765
that
includes
the
gas
light
beam
to
the
outside
boiler
room
wall,
the
installation
of
16
inch
stainless
steel
liner,
the
existing
chimney,
replacing
the
existing
valves
boiler,
room,
piping
valves
controls
as
needed,
and
we
placed
in
the
unit
heater
zone
control
valve
in
the
geography.
So
this
is
by
far
the
most
pressing
need,
while
a
pellet
boiler
works
better,
since
the
auger
system
was
installed,
the
back
of
boiler
is
in
rough
shape
when
a
large
bay
doors
are
open
for
the
trucks
to
enter
or
exit.
F
We
should
consider
is
replacing
bay
doors
and
main
entrance
doors.
These
doors
are
rough
shape.
They
have
a
tough
time
opening,
given
the
current
state
as
well.
If
you
meant
across
communities
for
the
main
interest,
it
would
replace
the
current
doors,
Apollo,
metaframe
stores
and
new
hardware.
It
would
be
all
the
same
as
the
existing
doors,
except
that
we
have
light
on
the
doors
and
two
insulated
metal
panels
of
the
window
units
the
cost
for
this
from
JP
Martin
in
sizes,
12
to
16
Portland
last
was
ten
thousand
474
for
the
garage
bay
doors.
F
They
were
replaced
with
hollow
metal
frames,
doors
and
hardware
be
as
soon
as
the
existing
cost
from
JP
Martin's
on
this
9006
42
and
from
Porton
last
8000
to
18,
for
both
of
these
projects
being
can
utilize
Maya
fire
from
the
reserve
just
333
thousand
dollars,
that's
a
typo
in
the
packet
300
3000
476.
We
could
utilize.
G
F
Kid
funds
as
well:
we've
set
aside
a
million
dollars
and
tif
funds
for
fire
station
improvements
over
the
other
need
that
we
have
for
the
fire
stations
replace
the
current
driveway
parking
area.
The
estimate
from
Trombley
Industries
is
to
remove
all
the
existing
hot
tub
on
the
front
of
a
building
facing
high
street
fair,
be
regraded
three
fourths
and
crushed
gravel
compacted
in
software.
As
we
dug
down
crushed
new
reading
material
replaced,
their
approximately
13,000
600
square
feet
will
receive
twelve
point:
five
millimeter
surface
code
of
nine
point.
F
Five
millimeter
replaced
in
compact
for
total
1.25
inches
cost
is
32,500.
While
the
parking
lot
is
in
pretty
rough
shape,
it's
not
the
most
impression.
No
most
pressing
issue
could
be
addressed
next
year.
If
we
do
it
next
year
would
probably
go
off
for
bids
with
that
included
in
the
paving
vids
with
Public
Works
that
we
do
but
wanted
to
at
least
make
the
council
where
that
that's
going
to
be
on
the
radar
for
next
year.
So
we're
asking
for
counsel
for
the
world
boiler
and
to.
A
F
D
E
D
D
D
A
A
B
H
B
G
H
Proposed
it
to
them
under
the
same
restraints,
the
difference
is
important.
Glass
is
going
to
use
a
little
room
and
said
steel
to
frame
all
the
door,
so
we
won't
have
that
same
problem
again
with
the
rusting
and
the
caving
into
the
door
frames
that
was
going
to
changes.
That's
why
he
called
them.
They
work.
F
Required
by
the
state
we've
gone
out
for
RFQ
for
engineering
services
at
the
airport
for
the
next
five
years.
The
selected
firm
would
assist
us
for
the
next
five
years
and
the
plan
projects
that
we
have,
which
include
apron
and
taxiing,
work
hanger
development
in
the
fuel
terminal
system.
We
received
only
one
RF
key
when
that
was
from
stantec
stantec
has
been
writing
these
services
to
the
city
for
the
past
five
years,
they've
been
great
to
work
with
very
responsive
and
have
made
the
projects
that
have
been
completed
over
that
time
period.
F
Given
the
history
of
working
well
with
Stan
check,
the
airport
committee
is
quite
comfortable
with
awarding
them
of
five
year
contract
for
engineering
services.
It's
recommended
the
council
authorized
a
five
year.
Engineering
services
agreement
between
the
city
and
Santa
can
authorize
the
city
manager
to
execute
any
and
all
documents
necessary
for
session
green.