Hello,
I'm,
Walter
Road,
the
infrastructure
program
manager
for
the
city
of
Biloxi
today
is
Wednesday
December,
21st
2022
I'm
here.
To
give
you
an
update
on
the
FEMA
funded
infrastructure
repair
program
in
the
city
of
Biloxi.
The
infrastructure
program
is
comprised
of
the
repair
of
over
426
000
linear
feet
of
sewer,
Mains
485,
000,
linear
feet
of
water
mains,
320,
000,
linear,
feet
of
storm
drainage,
removal
of
30
sewer,
lift
stations
and
the
repair
of
43
lift
stations,
also
the
replacement
of
over
100
miles
of
Street
Paving.
A
Furthermore,
contractor
will
begin
the
installation
of
double
barrel
51
by
31
inch
drainage
pipes
on
Street
between
Bonner
in
the
north
and
Howard
Avenue
to
the
south
after
they
complete
the
installation
of
the
sewer
maintenance.
This
43.8
million
1065
Day
project
is
located
between
Holly
Street
and
the
west
and
point
Cadet
to
the
east.
Currently
the
contractors
completed
20.5
million
of
the
43.8
million
project
with
work
scheduled
to
be
complete
in
December
2023.
A
on
the
West
Side
Biloxi
DK's
Brothers
Construction
Company
continues
to
work
in
Project
areas,
adjacent
to
U.S,
Highway
90
from
the
bees
Road
in
the
west
to
Veteran
Avenue
and
the
east.
The
city
awarded
the
contract
in
the
case
Brothers
Construction
company
for
32
million.
This
project
has
a
duration
of
1,
000,
180
calendar
days
and
a
nose
proceed
was
issued
with
a
start
of
construction
of
July
11
2022.
A
A
Additionally,
the
contractor
has
completed
the
installation
of
the
15
inch
sewer
Main
and
the
16
inch
water
main
adjacent
to
the
north
side
of
Highway
90
between
Ocean
Club,
Boulevard
and
Brady
Drive.
Next
for
This
Crew
will
be
the
installation
of
24
inch,
sewer
main
beginning
at
Ocean
Club
Drive
and
will
proceed
East
to
Camellia.
Street
drivers
should
expect
the
right
lane
of
Highway
90
westbound
between
Ocean
Club,
Boulevard
and
Camellia
Street
to
be
intimately
closed
through
March
2023.
A
Driver
alert
on
Tuesday
November
1st,
the
south
portion
of
beauval
road
was
closed
between
Highway
90
and
the
Mississippi
Coast
coliseum's
East
Gate,
to
allow
Nikes,
Brothers
Construction
company
to
install
new
water
and
Sewer
Mains
and
drainage
along
the
roadway.
This
south
portion
of
beauval
road
for
approximately
600
feet
is
closed
through
February
1st
2023.
detour
signs
will
be
posted,
directing
Motors
to
use
Veterans
avenue,
Verizon
Howard
Drive
as
alternate
route
to
travel
between
Highway
90
and
pass
road.