From YouTube: East Biloxi infrastructure update, Nov. 15, 2018
Description
Here are east Biloxi infrastructure updates from Oscar Renda Contracting and Hemphill Construction Co. Oscar Renda is the firm rebuilding and replacing infrastructure covering 55 miles of streets north of the CSX railway in east Biloxi. Hemphill is rebuilding infrastructure on eight miles of roadways south of the CSX Railway, from downtown to Seashore Methodist. To see project maps for November 2018, visit https://www.biloxi.ms.us/wp-content/uploads/2018/11/projectmaps11132018.pdf
A
Hi
I'm
Jennifer
Matranga
the
project
manager
for
Oskar
into
contracting
I'm.
Here,
to
give
you
an
update
on
the
progress
structure
project,
we
will
be
finishing
up
the
sewer
work
on
Porter
at
the
end
of
this
week.
If
weather
allows,
we
will
then
follow
behind
with
installation
of
the
storm
train
beginning
next
week
we
will
be
installing
the
sewer
main
on
Main
Street.
We
will
start
the
work
on
Main
Street
north
of
division.
First,
we
have
just
completed
all
of
the
storm
drain
structures
on
cuarón's.
A
We
will
be
following
behind
with
road
base
over
the
next
couple
of
weeks
and
then
base
course
of
asphalt
on
Bonacci.
We
are
continuing
to
work
on
the
jack
and
borer
under
the
CSX
railroad
to
tie
in
the
water
in
the
sewer
south
of
the
tracks
once
that
is
complete,
we'll
complete
the
installation
of
the
storm
drain
down
Bonacci.
We
have
installed
road
based
on
Esposito
and
will
install
base
course
of
asphalt
over
the
next
couple
of
weeks.
A
We
are
working
on
esters,
Boulevard,
east
of
Main
Street
in
the
CSX
right
away,
installing
the
sewer
system.
Once
that
is
complete,
we
will
install
the
storm
drainage
to
complete
the
utility
work
in
that
area.
We
have
completed
the
installation
of
the
base
course
of
asphalt
only
Muse
from
esters
Boulevard
to
elder
Street.
We
have
completed
the
installation
of
the
base
course
of
asphalt
on
Magnolia
south
of
Division.
A
A
We
will
be
installing
the
road
base
on
Magnolia
and
north
of
division
over
the
next
couple
of
weeks,
followed
by
the
base
course
of
asphalt.
We've
installed
the
surface
course
of
asphalt
on
all
streets,
east
of
Oak
Street,
on
the
east
side
of
the
project
and
depending
on
the
weather,
towards
the
end
of
this
week.
We
should
be
installing
the
surface
course
of
asphalt
on
Division
Street
east
of
Lee.
Over
the
next
several
weeks,
we
will
begin
working
on
the
sidewalks
on
all
paved
streets,
north
and
south,
of
division
to
the
east
of
Chi.
A
Vet
then
followed
by
landscaping
and
restoration
to
keep
you
updated
on
a
couple
of
issues,
the
issue
on
rain
or
where
we
installed
the
curbing
and
Road
base
for
plans.
However,
it
was
determined
that
there
was
a
design
error
issue
with
the
back
of
curb
elevations
being
too
high
and
we
were
stopped
from
laying
asphalt
paving
on
June
13th.
We
are
working
out
the
details
of
the
change
order
so
that
we
can
proceed
with
that
work,
north
of
divisional
rain
or
Cruces
elder
strawberry,
Cavett
and
galata
and
Fayard.
A
There
were
design
errors
also
and
the
quantities
and
sizes
of
the
drainage,
pipe
and
structures
were
changed,
drastically.
Changing
the
scope
of
work
for
that
area.
This
work
will
require
a
change
order.
We
are
working
out
the
details
of
the
change
order
with
the
city
so
that
we
can
proceed
with
the
work
we
would
like
to
remind
residents
and
visitors
that
our
speed
limit
throughout
the
construction
site
is
15
miles
per
hour.
This
is
for
the
safety
of
the
workers
and
for
your
safety.
A
We
would
also
like
to
remind
residents
that
the
orange
Rock
bags
that
are
located
in
front
of
the
drainage
structures
are
to
protect
our
local
water
waves
and
a
requirement
of
the
contract
and
should
not
be
moved.
The
bags
filter
sediment
from
the
water
before
it
travels
through
the
drainage
system,
preventing
silt
and
debris
from
going
into
the
drainage
pipes.
A
B
Hello,
my
name
is
Jack
gråvik
I'm,
the
assistant
project
manager,
with
hippo
construction
on
the
Biloxi
South
contract
and
I'm.
Here,
to
give
you
an
update
on
the
status
forward,
we
currently
have
a
crew
on
Gila
Avenue,
installing
the
new
water
line.
After
that's
complete,
we
will
move
in
a
cream
to
finish
the
sewer
and
following
that
we
will
begin
a
read
restoration.
We
also
have
a
crew
on
Bolton
lane
installing
the
sewer
line
you've
already
completed
the
water.
After
the
sterilised
complete,
we
will
look
to
begin
restoring
the
reading.
We.
B
A
career
on
Porter
Avenue
finishing
you
up
installing
the
sewer
line.
The
waterline
is
also
complete
on
that
street.
So
after
the
sewer
is
complete,
we
will
begin
putting
the
concrete
back
and
restoring
the
rain.
We
have
concrete
crews
on
highway
90
and
st.
Francis,
putting
back
on
the
sidewalk
and
driveways
we're
still
waiting
on
Centrepointe
to
finish
their
work
on
Howard
I've
named
before
you
can
move
back
there
to
complete
the
work
on
that
street
they're.
B
Swing,
Hopkins,
Boulevard
and
the
next
coming
weeks
we
are
hoping
to
put
down
base
asphalt
on
Hopkins
Boulevard,
Oak
Grove
place,
Bolton
Lane
and
Roosevelt
Street
for
the
end
of
the
year.
We
would
like
to
thank
the
public
again
for
cooperating
with
our
construction
and
keeping
in
mind
the
safety
of
our
employees
when
driving
around
our
constructions
ends.
Thanks.