A
A
Next,
second
order
of
business
award
recommendation
bid
for
2022
sanitary
sewer
and
water
main
improvements
Ron.
This
is
lowest
responsible,
dinner,
Factory
construction,
one
brick
Avenue
for
a
cost
of
80
885
000.
The
low
bid
was
from
Chicago
construction
at
874
000
that
contractor
informed
the
city
they
were
unable
to
perform
the
work.
This
year
we
have
a
motion
that
makes
a
motion
to
have
a
second
all,
those
in
favor,
aye,
aye,
third
order
business
change
order,
number
one.
A
This
is
through
the
housing
department.
We
just
need
a
450
dollar
increase
in
the
cost.
A
Change
order
number
one
for
the
new
city
fire
station
material
testing.
We
want
to
increase
the
inspections
in
line
by
three
thousand
dollars
to
inspect
interior,
concrete
slab,
concrete
sidewalk,
slabs
and
aprons,
as
well
as
sub
bass
and
asphalt.
Pavement
additional
testing
is
required
around
okay.
Do
you
have
a
motion.
A
A
A
A
Next
order,
business
contract
extension:
this
is
for
Peter
Popovich
not
to
exceed
38
000.
A
B
B
It's
replacing
an
old
one
that
the
repairs
for
the
old
ones
like
ten
thousand.
What
does
this?
Do
it
cleans
the
floors
in
Sacramento,
audio
oil?
That's
built
on
the
floor.
It
grubs
it
right
up
things
it
up
any
debris.
That's
left
on
the
Central
Garage
from
the
garbage
truck
snow,
everything
if
we
use
it
throughout
the
whole
building.
We
use
it
upstairs
in
the
break
room.
Okay
of.
A
A
So
do
you
have
a
motion
to
approve
pending
verification
of
either
state
or
County
contract
or
the
lowest
responsible
bidder
for
purchase
of
the
auto
scrubber.