►
From YouTube: 2022.11.16 Board of Contract & Supply
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Really,
it's
called
the
board
of
contract
and
Supply
meeting
for
November
16th.
The
first
order
of
business
is
the
approval
of
the
minutes
from
November
19th
promotion
motion.
Second,
oh
all
in
favor
aye.
Second
order
of
business
is
a
bid
opening
for
the
Ely
Park
water
transmission,
main
replacement.
A
A
A
Third
order
of
businesses
contract
approval:
this
is
for
pjf
Enterprises
for
additional
patching
to
basement
concrete
ceiling.
B
A
A
A
A
C
A
Would
our
heat
pumps,
for
it
provides
the
air
conditioning
and
supplemental
heat
in
order
to
the
buildings
are
currently
needed
with
very
Antiquated
boiler
systems
outside.
B
A
The
next
one
is
repoint
existing
masonry
on
engine,
one
two
and
four
correct:
that's
on
the
outside
of
the
building
or
yes,
definitely
outside
a
lot
of
it
in
very
bad
shape.
Engine
pull
over.
Actually,
the
walls
are
starting
to
come
down
and
the
upstairs
area
around
the
water
and
tubes
and
it's
coming
through
the
masonry.
A
Second,
all
in
favor
all
right
and
the
last
one
is
Smith's.
Lake
evolvement
replace,
failed
condensation
piping
at
engine
two
correct,
that's
180,
Main
Street,
and
this
is
part
of
the
old
boiler
system.
It's
actually
how
the
the
Water
returns
through
the
boiler,
and
it
lays
along
the
floor
and
it's
failing.
It's
leaking
in
multiple
places.
A
Any
questions
for
our
talent
with
the
motion
to
approve
be
second
and
all
these
on
the
account
number
I
believe
they're
supposed
to
be
f0015
after
each
one
of
these
we're
using
arpa
money
for
all
this
correct,
Bill,
correct.
A
A
The
next
one
is
change
order:
mirabito
Stadium,
with
blending
electric
no
cost.
This
is
just
coming
out
of
the
bid
allowance.
Yeah.