►
From YouTube: CAUD 2023.08.01
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Okay,
I'm
going
to
call
the
August
1st
2023
meeting
of
the
city
of
Bingham,
pins,
commission
and
architecture
and
Urban
Design
to
order
at
12
17
pm.
My
name
is
John
Darrow
I
am
the
interim
chairman
of
the
board
who's.
The
chairman
of
the
board
seems
to
be
conspicuously
absent.
If
you
would
please
introduce
yourself
Erie.
A
Dylan
Pelton
historic
planning
department.
Do
we
have
enough
to
vote
on
minutes
and
stop
to
get
them
out
of
the
way?
Okay,
oh
so
we
still
have
one.
Commissioner,
who's
run
a
little
behind
we're
going
to
try
and
get
ourselves
going
here.
Just
in
the
interest
of
everybody's
schedule
do
I
have
a
motion
to
approve
the
minutes
is
presented
for
the
last
meeting.
A
A
C
A
A
A
F
G
F
A
A
A
C
F
H
When
we
were
a
couple
meetings
back
and
the
chiropractor
was
here,
you
know
the
stickers
on
the
window.
I
think
part
of
that
conversation.
Someone
mentioned
if
it
wasn't
necessarily
affixed
to
the
window.
If
it
was
spit
off
on
the
inside
of
the
store,
whether
it
was
on
a
pedestal,
it
was
hanging
or
something
it
would
preclude.
This
conversation.
F
Yeah
I
understand,
but
I
want
something
to
be
presented
on
the
window,
not
a
week.
That's
what
I'm
asking
permission
for
I
know
that
I
could
put
it
on
the
frame,
but
it
would
be.
You
know.
There's
customers
based
inside
and
you
know
be
a
little
bit
more
of
a
problem.
So
I
just
wanted
permission
to
put
it
on
the
glass
as
we
go.
You
know
yeah
I,.
D
D
I'll
just
add
something:
I
didn't
overarching.
The
intention
is
that
they're
temporary,
we
don't
want
us,
I
mean
your
signs
are
decent
enough
quality,
but
I
think
what
we
might
see
if
we
I
guess
allow
or
permanent
signage
in
your
case,
is
all
of
a
sudden
we're
going
to
have
constantly
like
posters
just
up
on,
like
all
the
windows
in
our
downtown
core,
so
I
just
personally
want
to
emphasize
the
temporary
nature
of
this
and
I
wouldn't
want
to
see
them
up
like
100
of
the
time,
just
swapping
them
out.
A
I'm
a
little
uncomfortable
with
with
it
as
presented.
That's
just
me
not
just
me,
I'm
in
I'm
inclined
to
table
it
for
a
better
presentation
of
what
what's
the
question
and
I'd
also
like
a
little
better
backup
on
what
what
our
overview
is.
A
A
H
F
A
I
would
also
probably
want
to
see
what
the
signs
are
going
to
look
like
going
forward
for
happier
or
something
with
what's
coming
before
us.
I,
don't
want
to
prove
something
that
we
have.
No,
no
visual
surveillance
over
I
think
it'd
be
wrong,
so
the
posters
you're
presenting
are
the
ones
that
are
they
the
ones
that
are
going
to
hang
in
the
windows.
A
A
F
There's
no
set
time
frame
for
I
want
to
see
what
signs
specials
and
stuff
like
that.
So.
B
B
We
need
to
also
to
me
it's
unclear
if
you
said
seasonal
specials
like
are
these
just
the
four
posters
or
is
it
like?
There's
different
posters
for
each
of
those
spots?
That's
going
to
come
up
and
go
down
at
different
times
as
if
there's
you
know,
four
posters
for
each
spot
that
corresponds
to
the
Four
Seasons,
we're
only
seeing
one
set
of
them
and
not
the
full
size.
B
A
A
I'm
I'm
gonna
make
a
motion
table
so
Dave
motion
to
table
pending
further
information
regarding
the
time
frame
of
the
signs
being
posted
and
the
content
of
the
seasonal
posters.
Okay,
so
it's
been
motion
attainable
arms.
A
A
A
F
A
Bye
bye,
one
all
the
time
framework.
I
know
what
the
posters
are
going
to
pay
for
five
cents
coming
off
or
whatever
this
10
posts
are
going
up.
I
think
the
thing
is,
he
needs
to
make
it
historic
who's.
Gonna
I
mean
he
needs
to
stay
with
the
area
it's
going
to
occupy
and
if
all
of
them
comply
with
the
historic
nature
of
the
district
and
all
of
them
that
roughly
the
same
size,
that
would
be
fine.
C
A
Was
here
last
time
he
left
early
before
this
case
came
up
for
the
first
one
for
the
second
one.
Okay,
what
do
we
got
here?
We
got
the
Kilmer
building,
31
Lewis
Street
advance
and
be
recognized.
Sir,
come
on
down
state
your
name,
drink,
swamp,
Swampert
makes
friends.
A
Some
of
the
proposals,
the
applicant
Marty
Dietrich,
would
like
to
build
a
structure
and
comes
in
the
roof:
the
stairwell
and
extend
the
fire
suppression
system,
the
rooftop
access
in
2014,
a
larger
structure
previously
approved
by
Cod,
but
the
project
never
materialized.
So
this
is
a
updated
version
of
what
they're
going
to
do
to
the
staircase.
On
top
of
the
building.
F
I
Your
name
for
the
record
Dietrich
from
Norwich
New,
York
yeah,
so
in
2014
this
was
mentioned.
This
was
received
in
a
Skip
and
appropriateness
from
this
group.
The
project
was
much
larger
in
scope.
I
I
There
is
two
decks:
a
vestibule
on
top
of
the
stairwell
and
like
a
pavilion
like
structure
that
was
originally
approved,
the
decks
are
in
place.
All
we're
looking
to
do
is
to
complete
a
approximately
10
by
20
vestibule,
where
the
roof
opening
is
right.
Now
it's
just
a
temporary
structure
and
not
not
usable,
so
the
vestibule
is
almost
the
same
dimensions
is
what
was
originally
approved.
I
What
we're
not
going
to
do
is
construct
the
with
the
billion
like
production,
so
you'll
go
up.
The
stairwell
you'll
come
into
this
10
by
20,
vestibule
and
you'll
have
the
access
onto
a
deck
which
you'll
have
lighting
and
railing
and
as
outlined
in
he's,
revised
engineered
drawings.
Here.
A
Is
this
in
conjunction
with
the
restaurant
or
anything
or
is
it
strictly.
I
Primarily,
we
have
apartments
on
the
sixth
floor
of
the
building
two
have
built.
We
have
approval
for
three
more.
It's
it's
initially
for
their
use.
I
I
Okay,
fine
sight
lines
to
it
are
almost
on
each
side
of
this
vestibule
there's
two
elevator
structures,
so
this
is,
it
was
just
kind
of
situated
between
the
two
elevator
boxes
on
top
of
the
roof.
I
A
D
All
right
all
right,
I'll
make
a
motion
to
approve
the
improvements
as
presented
for
31
Lewis
Street,
given
that
it's
not
within
the
sight
lines
formally
approved
and
smaller
than.
A
A
A
So
summary
is
the
app
can't
Hornback
we'd
like
to
demolish
the
rear
of
structure
and
construct
a
new
wall
for
the
rear
of
the
building
must
also
replace
repair
the
main
street
in
the
northeast
corner
of
the
building
in
kind.
Currently,
the
building
is
condemned
due
to
the
condition
of
the
back
wall
of
the
structure.
A
I
emailed
you,
the
engineering
report
of
the
back
of
the
building,
now
there's
full
disclosure
here
when
I
started
this
project,
it
was
a
state
and
National
registered
structure.
So
when
I
asked
Daniel
Boggs
who
is
works
for
the
shipo
Department
I
asked
why
half
the
structure
was
in
an
estate,
National
Registry
and
not
the
rest
of
it
is
half
of
it
was
half
of
it
wasn't,
and
he
said
to
me:
oh
that's
a
mistake,
so
none
of
it
is
State
national
registered.
J
That
can
you
hear
me-
and
you
know
at
this
point
what
I
had
my
engineer
here:
Robert
Harner
and
I
have
my
contractor
up
there,
the
incredibly
handsome
Troy
Roman
and
from
lexicron,
and
these
between
these
two
guys,
they
have
kind
of
told
me
to
you,
know:
try
to
look
for
The
Best
of
Both
Worlds,
like
I,
said
for
this
project.
K
First,
first,
your
name
surfing
Robert,
Harner,
Lakeside
engineering.
We
did
a
structural
assessment
of
the
building
and
it's
in
Jeopardy
of
collapsing.
K
Essentially
the
the
beams
have
pulled
away
from
the
building
water
got
in
and
the
whole
brick
facade
ready
to
come
down.
So
if
that
goes,
then
we're
going
to
lose
the
floor.
So
something
has
to
be
done
relatively
soon.
So
we're
proposing
to
you
know,
Shore
things
up,
stabilize
it,
remove
the
brick
and
go
up
with
a
wood
wall
to
to
support
it.
For
now,.
J
Yeah
I'd
like
to
put
a
metal
irrigated
metal
on
the
back.
A
J
I
was
thinking
like
gray,
like
on
the
structure
that
I'm
redoing
on
59
Albert
Street.
The
great
is
one
of
my
favorite
colors
and,
like
I
said
it
would
look
good.
It
would
tie
in
with
the
other
building
right
in
the
back
of
it,
which
would
look
sharp.
A
A
You
know
you
earned
it
it's
not
given
you
earned
it
man.
Thank
you.
What
I
think
we
can
do
here
is
to
approve
the
project
is
presented
to
share
up
the
building,
get
things
going
for
the
corrugated
you're
going
to
have
to
come
back
and
or
submit
to
him,
because
we
can't
do
an
approve
of
something
we
have
no,
no
visual
reference
to
I.
A
A
A
A
A
G
A
A
Anyone
take
a
stab
or
I
will
okay
I
make
a
motion
to
approve
the
project
is
presented
for
234,
236,
Shenango
Street,
or
the
stabilization
and
renovation
of
the
deteriorating
structure
in
order
to
save
it
than
to
lose
it,
and
with
the
visual
review
of
the
two-tone
gray
corrugated
metal
to
be
used
as
wall
covering
at
about?
F
A
A
A
E
Yep,
so
we
Pat
McGinnis
Binghamton
Parks.
We
met
on
site
to.
I
E
Out
a
final
location,
we
all
came
in
agreement
that
the
top
location
on
the
corner
of
Laura
lab
and
Seminary,
where
there's
a
raised
platform
of
Earth
there
I
think
it
used
to
be
a
flagpole
almost
that
one
at
one
point
way
back
would
be
the
best
spot
for
it,
and
then
we,
the
pictures
there
is
some
base
details
from
the
statue.
E
So
the
base
is
18
inches
high
and
then
it's
got
some
inscriptions
that
are
listed
and
then
the
last
picture
is
an
example
of
how
underneath
the
pedestal
will
look,
it's
something
we
that
the
parks
departments
could
install.
We
did
a
similar
one
on
the
Firefighters
Memorial
on
the
South
Side,
so
it'd
just
be
a
you
know:
inlaid
paver,
with
circle
base.
A
E
E
So
around
on
the
ground
like
underneath,
the
statue
will
be
concrete.
You
won't
see
that,
but
then
around
the
area
would
be
a
paver
base.
You
know
very
similar
looking
to
that
might
not
be
exactly
the
same,
but
you
know
in
the.
E
It's
good
to
be
about
this,
like
we're,
not
gonna,
go
not
to
wear
this
it'll,
be
about
the
size
of
that
raised
circular
platform.
A
A
All
business
new
business
questions
comments
next
meeting
is
September
5th
of
September
5th
guys.
Thank
you.
I
would
make
a
motion
to
adjourn
the
Cod
Commission
meeting
for
August
1st
2023.
Second,
second,
all
in
favor
everybody
wants
to
go
unanimous,
Veronica.