►
From YouTube: Bloomington Plan Commission, October 18, 2021
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Two
petitions
continued
to
the
next
meeting
and
two
petitions
that
we
will
hear
tonight
before.
A
We
get
to
that,
we
do
have
some
minutes
to
be
approved.
We
have
minutes
from
the
september
13th.
A
All
right,
all
in
favor
of
approving
the
september
13th
2021
meeting
minutes.
Please.
A
Say
aye
aye
and
the
opposed
okay,
so
the
minutes
are
approved.
We'll
move
on
now
to
reports.
A
Resolutions
and
communications
do
we
have
any
reports,
resolutions
or
communications
from.
A
Staff
this
evening
we
have
one
jackie
scanlan
development
services
manager.
We
had
intended
to.
C
Appoint
a
new
platt
committee
member
tonight,
but
we
will
wait
until
next
month.
C
C
If
need
be,
but
they
would
prefer
to
wait
to
fill
the
full
position
until
they
have
a
new.
C
Staff
member
so
we're
going
to
wait
on
that
and
then
phil
peden
will
serve
in
his.
C
Position
as
to
alternate,
if
we
need
someone
before
they
have
someone
hired
so
that
will.
A
This
is
a
primary
plat
approval
for
33
single-family
lots
at
311,
south
walnut
street
pike.
A
For
property
in
the
3500
block
of
north
hackberry
street.
A
So
two
petitions
that
we
will
hear
tonight:
sp
2721.
A
Which
is
a
subdivision
at
2306
and
2310
west
third
street?
So
we'll
start
with
27-21.
A
And
I
believe
we
have
eric
relic
here
to
present
the
case.
D
West
8th
street,
this
is
the
site
just
north
of
the
johnson
creamery
building.
D
So
this
side,
as
I
mentioned,
is
part
of
the
property
that
contains
the
current
johnson.
D
D
D
Basically,
ripping
up
all
of
eighth
street
to
move
that
pipe.
However,
there
were
a
lot.
D
So,
as
I
mentioned,
this
is
the
previous
site
plan
had
the
building
in
the
location
of.
D
D
D
D
That
allows
for
them
to
have
a
fifth
story
on
the
building,
so
they
are
requesting.
D
Of
go
over
that
a
little
bit
later
as
well,
so
this
is
a
rendering
showing
how
the
building
would.
D
Trail
that
would
go
to
that
plaza
area
that
would
also
access
the
site.
There's
an
entrance
on
the.
D
North
side
of
the
building
to
that
entrance
the
ground
floor
along
8th
street
would
have
a.
D
D
D
Underside
of
the
proposed
building,
so
with
this,
as
with
the
previous
petition,
they
were.
D
Proposing
some
landscaping
along
the
property
that
helped
kind
of
interact
and
buffer
this.
D
Within
that
easement,
so
we
will
be
reviewing
that
a
little
bit
closer
with
the
grading
plan.
D
D
D
D
Ratios
that
are
required
along
both
frontages.
The
petitioner
is
meeting
that
with
a
60.
D
D
So
they
have
shown
the
required
modulation
throughout
the
building
as
well.
D
So,
within
this
overlay
district,
the
udl
requires
that
70
of
the
building
be
at
the
build
to
line.
D
So
the
bill
two
line
at
this
area
here
is
between
zero
and
five.
D
To
have
about
two
percent
of
the
building
at
that
line,
you
know
if
you
go
back
and
look
at.
D
D
Build
2
line,
so
the
petitioners
have
requested
a
separate
variance
from
that
aspect
and.
D
That
will
be
heard
at
this
week's
board
of
zoning
appeals
meeting.
So
this
site
plan
is
obviously.
D
Contingent
upon
that
variance
being
granted,
but
that
would
be
the
the
only
aspect
of
this
that.
D
Does
not
meet
our
architectural
requirements
so,
as
I
mentioned
earlier,
they
are
proposing
to.
D
D
As
with
the
similar
the
previous
petition,
they
are
meeting
that,
through
the
light
colored.
D
Hardscaping,
that
is
being
provided
on
the
site
with
the
covered
parking,
the
cooler
vegetated.
D
D
D
D
D
Reduction
from
the
the
45
required
spaces,
which
would
bring
the
requirement
down
to
38.
D
You
know,
with
this
being
a
very
bedroom
count
being
one
mostly
one
in
studios.
You.
D
Know,
there's
a
less
parking
need
for
that,
but
with
the
previous
petition
that
we
pointed
out.
D
D
D
D
A
final
verification,
hopefully
of
the
actual
approved
resolution
that
solidified
that
so
we.
D
A
Thank
you
eric
are
there.
Representatives
of
the
petitioner
would
like
to.
A
Add
anything
to
the
presentation.
D
F
G
G
To
be
back
with
this
new
proposal,
you
know
we
were
excited
also
about
our
first
go-around.
G
But
unfortunately,
you
know
due
to
some
circumstances
outside
of
our
control,
that
one.
G
G
Did
another
great
job
and
eric
has
been
very
helpful
in
in
getting
us
here
to
this
point.
G
To
get
started
on
this
sometime
late
spring
early
summer
next
year,.
A
Commissioner,
st
john,
thank
you.
Thanks
for
the
presentation,
both
from
staff
and
the
petitioner.
H
I
just
had
two
quick
questions,
and
this
is
really
for
eric
or
mr
burlich.
On
page
five,
it.
H
Is
that
am
I
misreading
that
or
no
that
that
it
was
an
accidental
carryover
from
the
previous.
D
Since
the
number
of
spaces
on
the
site
has
gone
down
a
lot
more,
you
know
they
will
have
spaces.
D
In
there,
obviously,
for
you
know
all
the
people
using
the
site,
but
they
are
not
setting
aside.
D
D
Of
a
property
has
not
been
developed,
so
you
basically
show
how
much
is
going
to
be
green
space.
D
D
D
H
I
All
right,
thank
you,
I'd
love
to
follow
up
on
some
of
these,
so
I
have
a
particular
question.
I
I
I
D
Parking
that
has
on
the
property
as
a
whole.
You
know
all
of
these
spaces.
Those
are
surface
spaces.
I
D
The
existing
surface
parking
that
is
behind
the
build
okay,
all
right:
okay,
that's,
okay,
good.
I
And
then
the
other
question
I
had
is
just
about
just
to
clarify
the
concerns
about
the
culvert.
I
D
I
I
I
That's
right,
okay,
good
good,
and
then
I
just
want
to
confirm
well
in
this
having
this
image.
I
D
Yes,
so
the
alley
runs
through
basically
kind
of
like
that
nice
use
of
pointer,
okay,
okay,
great.
I
C
Adding
the
condition
is
there,
where
eric
has
indicated,
appears
to
still
be
a
planted.
C
C
We
should
have
caught
this
last
time
as
well,
but
basically
and
eric
thinks
that
he
has
seen.
C
C
C
Want
to
hold
them
up
and
eric
was
pretty
sure
that
they
sussed
this
out.
The
last
time.
C
C
In
order
to
have
this
site
plan
approval,
because
if
they
don't,
you
know
and
then
just
said,
oh.
C
Presented
here
so
so
the
condition
will
be
that
they
have
to.
You
know
either
prove
that.
I
C
That
eric
mentioned
earlier
that
we're
adding
tonight,
okay
great,
so
that's
not
in
our
packet.
I
Time
no,
the
the
previous
petition
did
have
some
limestone
bands
on
it.
You
know
yesterday
and.
G
Had
some
limestone
featured
around
the
retail,
what
was
going
to
be
the
retail
component
of
it.
A
J
To
yeah
this
one
right
here
and-
and
I
guess
just
to
verify-
that
the
commercial
or
office
space.
G
And
let
them
know
that
you
know
parking
is
not
going
to
be
guaranteed.
We
did
also.
G
G
A
number
of
parking
options
like
daytime
parking
garage
options
if
any
additional.
J
J
Was
going
to
ask
as
well-
and
I
guess,
as
I
read
the
the
parking
study
that
was
associated
with
this.
G
So
we
I
think
we
are
still
going
to
attempt
to
have
one
card
like
a
ride,
share
space,
dedicated.
G
Pushed
towards
the
the
b
line,
so
it
would
have
been,
you
know,
taking
away
from
some
of
the.
G
Landscape
space,
so,
ultimately
you
know
we
ended
up
having
to
as
part
of
the
design
and
trying
to.
G
A
little
bit
more
space,
but
we
have
talked
to
the
city
about
again
leasing
parking
in
the.
G
The
brand
new
parking
garage
that
was
just
built
in
the
trades
district
garage.
G
G
G
One
of
these
ride
sharing
companies
will
even
lease
a
spot
in
this
location.
I'm
happy
to.
G
G
If,
if
there
is
a
company
out
there,
that
is
willing
to
rent
one
and
and
partner
us
up
with
us
on.
G
This
location
we're
happy
to
do
so.
I
I
think
we
had
some
of
the
conversations
very
initially.
J
J
Understand
it,
you
know
you're
next
to
I,
just
drove
like
a
very
narrow,
12
foot
wide
right
way.
J
Around
so
just
curious,
if
the
development
team
has
really
thought
through
and
could
explain.
G
Absolutely
I
think
my
director
of
development,
joe.
F
On
the
question
that
andrew
had
regarding
the
the
car
sharing
request
in
the.
F
That
we
request
that
a
car
sharing
space
be
reserved
in
the
public
parking
garage.
So
we
we.
F
F
That
one
and
then,
if
I
could,
I'm
sorry
I
was
trying
to
type
at
the
same
time.
So
if
you
wouldn't.
F
Mind
repeating
the
question
you
had
about
access,
I
could
probably
help
on
that
one
as
well.
J
Like
potential
impacts
to
farmers,
markets
or
just
knowing
trucks
and
deliveries
like
I
just
don't.
J
J
With
a
12-foot
wide
alley
on
one
side:
yeah,
no,
it's
a
good
question.
So
we
we
have
been
reviewing.
F
Of
the
one
of
the
benefits
we
do
have
is
that
space
that
I
think
was
referenced
earlier,
which
is.
F
Now
they
would
still
have
to
come
in
and
out
of
the
alley.
The
other
benefit
is
that
we
do
have.
F
Eighth
street-
and
we
do
have
you
know
somewhat
circular-
I
guess
traffic,
if
you
will,
between.
F
F
Eighth
street,
where
the
traffic
is
a
little
bit
less
and
obviously
we
would
just
have
to
do.
F
F
F
F
F
F
Connections,
there
are
a
few
that
would
happen
in
eighth
street
and
then
a
couple
that
would
be.
F
All
be
temporary,
though,
and
I
think
we
could
certainly
coordinate
anything
that
happens
along.
F
Eighth
street,
to
avoid
farmers
markets
that
might
happen
in
the
parking
lot
across.
F
That
it
gives
us
a
one
area
where
we
can
stage
stuff
and
keep
it
on
our
property.
A
Thank
you
any
additional
questions
from
commissioners,
commissioner
herrera
right.
K
Thank
you.
This
is
representing
the
always
of
paradigm
and
recreations,
and
also
the
board.
F
Yes,
I
mean
eric,
would,
would
you
be
able
to
bring
up
the
landscaping
plan?
I
think
that.
F
F
So
we
have
two
connections
to
the
b
line
and
we
would
we
would
essentially
take
the
sidewalk.
F
F
F
F
Angles
and
the
the
you
know
the
slope
to
make
sure
that
they're,
handicapped
accessible,
certainly.
F
Landscaping
again,
what
we've
done
here
is:
we
are
showing
essentially
landscaping
within
our.
F
F
Existing
grass
and
shrubs
and
trees
in
those
areas
right
now
so
I
mean
our
intent
was
since.
F
F
D
D
Street,
where
this
parking
lot
is,
I
I
can't
speak
to
why
there
is
so
much
pooling
that.
D
D
To
get
into
the
existing
culverts
that
are
along
rogers
street,
you
know
and
eighth
street
has.
D
D
D
With
the
utilities
department,
you
know
as
part
of
the
grading
permit
process,
I
mean
it
certainly.
D
Won't
be
making
it
worse,
you
know
I
don't,
but
I
think
that
the
the
fix
to
that
is
beyond
what.
D
L
Development,
I
appreciate
the
attention
to
the
environmental
considerations
here,
for
this.
L
And
all
the
work
that
went
into
redoing
this
after
the
complications
with
culvert
arose.
A
The
lobby
of
the
johnson
creamery
recently
you
know
that
a
building
and
pooled
water
can.
A
The
construction
process,
so
that's
my
only
comment,
commissioner
kinsey.
You
have
a
comment.
I
I
I
I
A
Thank
you,
commissioner.
Cochran.
M
I
never
thought
of
this
parking
lot
as
an
infill
lot.
The
way
it's
being
utilized.
A
All
right,
so
the
motion
is
for
approval
and
darla.
Would
you
please
call
the
roll.
B
Okay,
kate,
yes,.
A
B
In
stevor,
thank
you
all
right
motion
carries
and
the
petition
is.
A
Approved
our
next
petition
is
dp
29-12.
A
Petitioner
is
alecrity
investments,
sigvinder
meta,
the
property
location.
A
Is
2306
and
2310
west
third
street
and
eric
are
you
presenting
this
one
as
well.
N
I
am
actually
oh,
we
have
karina
here
to
present
sorry
about
that.
The
floor
is
yours.
Take
it
away.
N
Okay,
hi
everyone
I'll
just
share
my
screen:
real
quick.
N
Okay,
so
this
is
a
request
for
a
primary
plat
approval
to
change.
N
One
lot
into
two
lots
and
the
secondary
plot
approval
to
be
delegated
to
planning
staff.
N
And
there
are
two
sinkholes
that
require
karst
conservancy
easements,
one.
N
There
is
also
an
existing
five
foot
wide
sidewalk
along
the
lot
frontage.
That
was.
N
Installed
by
the
city
with
a
previous
project
along
the
third
street
corridor,.
N
N
N
To
be
within
the
right-of-way,
the
petitioner
will
install
or
bond
for
the
required
right-of-way.
N
N
Minimum
lot
size
and
maximum
impervious
surface
coverage,
which
is
60
for
the
mc
zoning
district.
N
A
A
Commissioner
kinsey,
I
have
one
question.
This
probably
goes
to
karina's
staff.
N
C
C
Requirements
so
she's
verifying
that
creating
this
lot
will
not
make
that
lot.
Non-Conforming.
I
C
Based
on
minimum
lot
size
and
our
other
requirements
in
the
future,
okay,
thank
you.
A
Any
other
questions,
commissioner
sieber.
J
The
western
property
line,
but
I
guess
between
the
driveway
and
the
railroad
tracks,
realizing.
N
Because
there
is
yeah,
there
is
a
parcel
there.
That
is
between
the
lot
that
we're
talking
about.
C
Right
so
yeah
exactly
so
in
this
case
frontage
for
the
sidewalk
that.
C
Will
be
wider
than
the
rest
is
roughly
from
the
existing
driveway
to
the
western.
C
Oh,
I'm
sorry,
could
you
state
your
name
for
the
record
for
the
next
sorry,
diana
reynolds.
C
A
Make
public
comments,
I
think
that's
that's
going
to
do
it
we'll
be.
A
Back
to
the
commission
now
for
any
final
comments
or
questions
or
for
a
motion.
L
Approval
and
adopting
the
proposed
findings
and
approving
dp
2921
with
the
staff
conditions.
A
All
right
looks
like
we're
ready,
darla.
We
please
call
the
roll
on
the
motion
to
adopt
the.
A
Is
approved,
thank
you
to
everyone
that
is.
Our
final
petition
for
tonight
seems
hard
to.
A
Believe
but
I
think
we
are
ready
to
adjourn
unless
there
are
any
final
announcements.