From YouTube: Bloomington Redevelopment Commission, October 3, 2022
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Opposed
all
right
minutes.
Pass
next
item
is
examination
of
claims
september
16th
2022
for.
A
A
A
Report:
here's
the
man
president,
I
think
you
just
briefly
tonight
just
want
to
remind.
E
E
E
F
A
H
E
Okay,
if
we'd
like
to
maybe
move
to
the
next
item.
Madam
president,
I.
E
J
Hi
patrick
dergis
city
engineering
department,
the
first
street
project
is
reconstructing
first.
J
J
First,
the
project
is
a
full
reconstruct
new
sidewalks
tree
plots
and
full
reconstruction.
J
J
For
the
for
the
project,
vs
was
the
design
firm
and
and
then
through
the
federal
process.
Since.
J
We
went
out
to,
I
believe
it
was
five
firms
yeah
five
firms.
Hwc
engineering
was
the.
J
Highest
ranked
from
the
five
proposals
received
and
they
we
have
agreed
to
a
contract
to.
C
Think
of
that
space
and
the
so
the
whole
hopewell
rebuild
there's
going
to
be
a
ton.
C
And
utilities
before
the
construction
all
gets
put
place,
we
may
have
to
fix
up.
J
I
would
say
the
there's
a
few
different
ways
to
go
about
it.
One
of
one
of
the
items
for
this.
J
Project
is
the
timing
of
the
federal
funding,
and
so
we
have
to
before,
I
believe
march,
would.
J
J
One
east:
there
will
be
a
new
first
street
there'll,
be
new
madison
and
new
university.
J
And
so
that
really
leaves
your
access
from
morton
for
the
for
the
southeast
corner
and
then
for.
J
J
Can
access
from
these
non-reconstructed
roads
and
destroy
those
as
they
do
their
projects
and.
J
Keep
our
new
ones
nice,
the
other
part
for
first
street,
for
example,
is
as
we
develop.
You.
J
J
C
That's
correct,
yep,
and
so,
and
so
it
it
really
depends
on
how
it
lays
in
the
current.
J
Land
and
then
also
how
the
amenities
lay
out
and
the
master
plan
envision.
These.
J
Park
facilities
and
typically
parks,
small
ones
like
this,
with
with
large
common
space.
J
East,
basically,
from
from
like
euclid
down
to
rogers,
we'll
have
to
almost
stair
step
as
we.
J
J
And
so
that's
what
we're
that
that's
the
next
phase.
But
I
guess
going
back
to
your.
K
J
We
will
most
likely
be
exceeding
the
the
required
20
match.
F
So
we
have
about,
I
think
it
was.
I
think
that
put
us
about
800
to
900
000,
so
we'd
be
closer
to
4.
J
Back
so
for
construction
inspection
about
14,
they
guidance
is
about.
J
Investigations
we
will
always
do
environmental
investigation,
but
when
you
have
the
federal.
J
Funds
there
are,
there
are
requirements
that
basically
lead
to
higher
environmental
cost.
J
J
I'm
not
exactly
sure
percent
wise
I'd
have
to
look
a
little
bit
closer.
J
Basically,
indot
sets
a
dbe
percentage
and,
and
so
the
this
price
contains
the
sub
value.
I
So
for
for
these
federal
projects,
indot
sets
a
disadvantage.
Disadvantaged
business.
J
J
For
example,
there's
a
lot
of
very
easy
ones
to
to
use
a
lot.
Trucking
is
a
big
one.
J
Percentage
for
that,
for
this
one,
the
highest
selected,
firm
hwc,
is
not
a
dbe,
and
so
they
elected.
J
Be
on
like
bigger,
bigger
poor
days,
or
something
like
that.
I
use
poor,
but
it's
probably
a
placement.
J
J
For
those
operations
are
temping,
the
trucks
you're
pulling
every
single
ticket.
Your
your
checking.
J
J
J
J
J
And
so
so
it's
we're,
locking
the
developers
in
and
basically
in
in
in
definitely
in
the
plat.
J
And
council
has
been
pretty
firm
in
there,
not
changing
the
right-of-way,
and
so
so.
J
Buildings
on
their
site,
some
people
have
set
building
plans
that
they
just
go.
J
J
J
J
That
but
overall,
I
think
we
are
setting
up
the
best
situation
for
the
whole
site
to
be
developed.
J
And
and
hopefully
we'll
lead
every
parcel
label
to
be
developed
versus
you
know,
possibly
creating.
J
J
K
In
a
in
a
sequenced
way
consolidated,
tiff
dollar
wise
when
we
look
at
this
project
as
an.
K
D
D
K
J
That
need
to
take
place
and
we're
working
on
getting
those
to
notice
to
proceed
so
that
they.
J
Can
be
ahead
of
us,
but
I
definitely
we
should
be
able
to
start
breaking
ground
in
the
spring
at.
J
Least
in
multiple
areas,
we're
planning
to
overlap
the
first
street
and
phase
one
east
together.
J
J
J
Up
to
the
contractor
exactly
how
they
want
to
to
let
overlap
them.
You
know
most
likely.
J
And
then
there's
the
reconstruction
of
of
the
kroger
entrance
and
the
sidewalk
and
everything.
J
A
unique
challenge
for
us,
as
we
definitely
want
to
keep
an
equal
sized
facility
open.
J
And
so
we'll
have
two
projects
that
both
need
to
be
in
morton.
Do
a
lot
of
work
in
morton.
K
K
E
E
E
E
Is
parcel
10
and
that's
where
the
master
plan
had
some
single
family,
some
possible
more
units
on.
E
E
E
E
E
J
J
Our
consultant
thinks
is
the
best
approach,
so
you
know
I
don't
first
street
I
think
is
going
to.
J
Finish
because
of
landscaping
and
such
in
the
spring
of
2024.
phase,
one
east
is
going
to.
J
Look
at
about
the
exact
same
schedule,
and
so
so
I
think
at
least
the
last
conversation
I
was.
J
In
we
were
talking
about
sometime
in
the
spring
of
23,
going
out
with
maybe
some
rfis.
J
With
them
getting
in
there
right
as
we're
finishing
up
phase
one
east
and
and
hopefully.
J
Getting
completed
before
second
street
comes
along
in
2025.,
so
there's
a
lot
of
things.
J
J
We
have
to
on
on
our
projects.
Primary
thing
is
to
get
your
infrastructure
on
their
first.
K
K
K
K
K
A
L
L
L
L
L
L
L
L
L
L
F
F
Project
tiff
is
eligible
to
be
spent
on
local
public
improvements
which
have.
A
You
next
item
of
business.
Is
there
any
general
discussion
needed
tonight.