►
From YouTube: Board of Adjustment Meeting (01/05/2021)
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
B
It's
been
rescheduled,
so,
if
you
don't
want
to
hang
around
here,
that's
fine,
thank
you.
Do
you
have
any.
C
D
D
D
D
F
D
D
Sure
case
number
voa,
20-1-0-0-197,
the
opposite
owner
is
justin
and
jennifer
windminer
property
address
is
3081
on
court.
Partial
id
is
0.0921-1000
legal
descriptions,
lot,
1
block
12
jacksonville
beach
heights.
Current
zoning
is
an
rs2,
mostly
consider
a
variant
from
the
development
code,
section
34-337,
e1
c.2
for
a
corner
side,
yard
setback
of
one
foot.
They
lose
10
feet,
minimum
and
total
side
yard
setbacks
about
5.6
feet,
inflow
of
10
feet
required
and
34-337
e1e
for
50.1
percent.
B
E
E
Thanks
for
hearing
my
request,
I'm
here
tonight
initially
because
we
we
applied
for
a
pool,
permit
that
bounced
back
due
to
some
previous
work
that
we
had
done
by
another
contractor,
mostly
landscape,
work,
patio.
You
can
see
up
on
the
plan
pergola
on
the
side
of
the
house.
E
E
The
only
new
coverage
that
we're
adding
is
going
to
be
for
the
pool
pump
equipment,
I
believe
less
than
12
square
feet.
E
How
long
have
you
lived
in
a
house
about
five
years
yeah,
the
previous
44
approved,
was
by
our
home
builder.
We
bought
the
homes
to
stack
up.
G
E
Well,
when
we
bought
the
house,
the
44
was
already
approved,
correct.
That
was
upstream
of
us.
We
contracted
with
a
landscape
or
hardscape
installer,
who
had
showed
us
that
everything
was
going
to
be
taken
care
of
come
to
find
out.
It
would
not.
We
did
not
find
out
until
we
submitted
for
this
current
permit,
so
you're
telling
us
no
permit
was
issued
originally
for
this.
Is
that
correct,
correct?
That's
right
and
you
never
thought
there
was
something
strange.
A
A
E
And
we
did
that
that
worked
shortly
after
we
moved
in.
So
it's
probably
been
two
and
a
half
years
that
has
been
on
the
ground,
so
the
only
additional
coverage
that
were
for
because
it's
going
to
be
a
coping,
only
pool
so
no
additional
coverage
there,
it's
just
the
poor
pad
for
the
for
the
pool
equipment.
E
E
I
know
that
the
coverage
is
tight
on
there
to
begin
with,
I
mean
we
are
asking
for
50.1.
We
do
have
a
a
very
small
lot,
that's
smaller
than
the
standard
7
500
square
feet.
So,
honestly,
we
don't
have
much
room
to
work
with.
G
G
And
I
also
do
have
support,
I
believe
you've
received
emails
from
two
of
the
adjacent
property
owners,
one
behind
us
and
one.
F
G
D
E
E
If
the
boat
wasn't
there,
it
would
just
be
gravel.
I
mean
I
personally,
there's
no
requirement,
you
know
to
have
the
gravel
off
of
it's,
not
technically,
not
a
structure.
Okay,
good.
I
tried
to
eyes
from
view
as
much
as
I.
E
E
F
E
E
E
D
I
have
two
at
the
end
of
the
record
here.
The
first
one
is
from
adam
and
lauren
weston,
who
had
331-13,
horncoat,
playlist
next
door
to
the
property.
D
D
The
next
letter
I
have
is
from
philharm,
philip
and
kate
and
zelic
was
outlet
at
3084
bullion
court.
They
live
right
behind
the
whitmer's
residence.
We
approve
the
proposed
plans,
alignment
to
build
a
coping,
only
pool
in
the
backyard
considering
this
is
a
coping
only
pool
and
a
corner
lot
will
have
low
impact
on
the
water,
drainage
and
runoff
on
their
property
and
surrounding
neighbors.
Furthermore,
the
windmillers
pool
plans
are
similar
to
what
other
neighbors
have
been
approved
card
in
recent
years.
D
I
will
say,
since
I,
in
that
park
every
day
of
the
week
what
has
been
done
in
the
house
that
makes
it
a
very
attractive
area.
E
G
D
D
34-286
we
have
the
next
case.
Please
number
20-100-198,
the
applicant's
owner
is
dsm,
renovations,
llc
property
addresses
804
to
17th
avenue.
North
partial
id
is
175
190-000
legal
description
lot,
6
block
3
beach
home
sites
unit
3.
current
zoning
is
an
rs1
motion.
Consider
a
variance
in
the
land
development
code
sections
34-336-e
1e1c.
D
B
B
E
B
Worry
so
we
have
a
standard
size
lot
at
9380
square
feet
instead
of
10
000.
and
we
are
on
a
corner.
So
we
have
a
little
larger
setback
required,
which
gives
us
a
smaller
platform
for
the
house
layout
and
we've
spoken
to
neighbors
and
everybody's
real
happy
about
what
we're
going
to
do
there
and
we
have
some
communication
from
them
here
too.
G
G
C
Street
the
generally
high
answer,
one
of
my
questions-
was
with
a
single
story
or
gold
story
building,
because
I'm
just
concerned
about
the
integrity
of
the
neighborhood.
The
continuance
of
the
appearance,
there's
a
lot
of
neighborhoods
and
to
me
have
gotten
some
giant
homes
in
there
that
don't
go
along
with
the
rest
of
the
neighborhood.
So
that
was
one
of
my
concerns
and
I
don't
know
he
said
you
have
some
support
of
some
of
the
neighbors
there's
an
older
gentleman
who
lives
next
door.
C
I
always
know
his
first
name,
but
I
mean
you
know
he
might
may
or
may
not
know
about
me.
I
know
he
got
a
ladder,
I'm
sure,
but
it
just
seemed
like
this
plan
was
you
know
awful
close
to
his
house
and
I
don't
know.
A
C
C
You
know
the
side
and
behind
really
those
are
my
just
be
concerned,
but
that's
all
I
have
to
say
thank
you,
okay.
Well
just
so
you.
A
Know,
they're
they're
not
asking
for
side
yards
that
they're
only
over
here.
What's
that
bad?
Well,
it's
okay!
So
we
think
they're
equal
in
that
point.
Okay,
thank
you.
Thank.
D
First
one
is
from
anthony
and
jennifer
dillon
at
814
18th
avenue
north
concerning
the
hearing
in
the
property,
804
17th
avenue
north
and
a
request
for
a
rear
yard
setback.
My
wife
and
I
are
not
in
favor
of
the
approval
for
this
adjustment
on
the
above
property.
Being
the
steps
of
the
development,
proper
property
setbacks,
allow
for
safety
and
curb
appeal
for
all
laborers
in
the
community.
D
And
I
have
a,
I
believe
this
is
what
was
submitted
to
the
dsm
reservation:
the
llc's
applied
for
variance
to
decrease
the
rear
setback
at
11.75
feet
and
increase
lot
coverage
and
39
to
construct
the
new
lifestyle
home.
We
are
asking
if
you
would
support
this
request.
The
meeting
will
take
place
in
january.
D
I
have
a
dorman
v,
the
panther
and
I
can't
not
read
the
other
one.
I
believe
it's
probably
the
spouse
up
there
at
803,
north
17th
avenue
of
sydney,
l
carter-
and
I
can't
read-
I
guess
that's
just
that's
a
north
17th
avenue,
and
then
I
have
a
jill
phillips
at
1755
north
k
street,
all
in
favor
of
it,
and
I
have
one
last
letter.
D
A
And
do
you
does
the
applicant
want
to
address
any
of
those
outlets.
A
B
B
B
B
B
G
F
E
B
D
286
case,
please
certainly
case
number
voa
number
20,
100
1999,
the
applicant's
owner
is
john
p
gray.
Junior
agent,
bob
hamill
of
henderson
cool
service
property
address
is
3972
concierna
boulevard.
Partial
id
is
nine
zero,
zero,
zero,
zero.
The
legal
description
is
locked
one
block
12
ocean
terrace.
Current
zoning
is
an
rs1,
a
variance
from
the
land
development
code
sections
34-336e
for
47.1
percent.
Lock
coverage
is
35.
Maximum
42
has
previously
been
approved
to
allow
for
swimming
pool
and
paver
patio
auditions
to
an
existing
family.
Gloves.
B
A
G
Our
hardship
is
that
this
is
a
substandard
sized
lot
for
the
zoning
zoning
is
that
rs1
minimum
required
plot
size
for
rs1
is
10
000
square
feet.
Subject
locks
only
7
315
square
feet
35
of
10
000
square
feet
is
thirty
five
hundred.
If
the
subject
lot
was
a
standard
size
lot
and
a
variance
would
not
be.
A
F
G
Right,
I
understand
examples
like
a
swimming
pool
equipment
pass.
We've
had.
I
think
that
robert
has
gone
through
the.
G
F
H
D
D
D
D
917-000
legal
description,
lots,
4
and
11
block
3
surf
park
unit.
1.
current
zoning
is
an
rs1
motion.
Is
there
a
variance
in
the
land
development
code,
sections
34-336e1c.1
for
a
front
yard
setback
of
18.8
feet
to
move
25
feet
to
minimum
34-336
e1c.2
for
side
yard
setbacks
of
6.1
feet
in
lieu
of
10
feet,
minimum.
D
B
C
C
Mr
gills
would
like
to
split
a
lot
and-
and
he
has
an
agreement
with
mr
atkins
to
sell
the
lot
and
in
order
to
do
so
with
the
live
split,
it's
gonna
make
his
home
non-conforming
by
quite
a
few
standards,
and
so
we
would
like
to
seek
variance
in
order
to
be
able
to
get
him
to
maintain
the
property
as
it
is.
C
Although
the
plan,
if
variance
is
granted,
is
to
remove
pavers
and
a
gazebo
in
the
back,
that
would
slightly
reduce
the
lot
coverage
a
little
bit
on
his
on
his
lot
on
14th
avenue,
and
then
we
understand
from
mr
atkins
he's
a
experienced
prolific
builder
in
the
area
that
he
plans
on
building
on
13th
avenue
or
something
that
would
be
conforming
to.
No
further
variance
would
be
required
for
what
we
cannot
be
removed.
C
I'm
sorry!
What
would
the
lock
coverage
be?
If
you
remove
the
papers,
we
have
it
at
58.6
once
that's
gone
and
the
dizzy
version.
C
G
C
G
G
G
So
I
purchased
them
in
2007
and
the
papers
were
there
at
that
time.
G
G
C
Yeah
we
understand
that
it's
pretty
standard
as
to
the
state
of
the
rest
of
the
houses
on
the
street
about
68.
Excuse
me,
the
rest
of
the
houses
are
58
percent.
My
coverage-
I
don't
know
that
I'm
saying
the
size
of
the
the
size
of
the
lot,
but
you
don't
know
that
to
be
true.
C
I
do
have
a
note
in
the
five
from
the
senior
planner
that
that
states
that
all
the
locks
on
the
block
three
are
the
same
size.
I'm
just
talking
about
the
left
curve.
We're
not
talking
about
the
same
thing.
Thank
you.
We
discussed
other
ways
to
remove
lot
coverage
you
know,
but
since
jack
speaks
currently
he
doesn't
give
any
credit
for
pervious
papers
that
there.
C
That
we
could
do
to
recover
take
out
a
little
bit
of
the
walkway
in
the
back
of
the
house,
but
then
he's
walking
out
of
his
back
back
of
his
house
onto
the
grass
or
something
to
keep
the
rain
off
the
house.
This
raft
is
also
29
feet
wide
too,
so
that
that's
for
code
as
well
2019.
G
D
G
I
guess
this
is
this:
approval
is
required
to
for
the
break
out
of
this
parcel
before
correct.
Yes,
sir,
are
we
allowed
to
make
forward
conditions
on
a
parcel
to
be
sold
that
maximum
block
coverage
could
be
41
to
offset
the
two
together
to
make
30
49.9
each
I'm
not
sure,
but
I've
never
seen
it.
I've
never.
C
D
D
And
I
have
no
problem
with
someone
trying
to
profit
from
selling
a
lot
to
that
thought
and
trying
to
make
something
of
that
is
just
having
that
much
coverage
on
the
current
life.
For
that
which
is
very
unusual
for
jacksonville
beach,
I
mean
I
would
feel
better
if
you
came
back
with
proposal
what
you
want
to
remove
from
that
to
bring
it
down
to
more
equitable,
lock
coverage
for
us
from
the
existing
structure
on
the
existing
structure.
C
D
D
C
What
you're
saying
about
moving
the
needle
the
actual
outside
exterior
footprint,
the.
G
C
C
D
C
And
we
had
heard
that
going
into
this
as
well.
We
thought
hard
about
ways
that
we
could
mitigate
that,
but
we're
also
under
somewhat
of
the
understanding
that
this
was
really
glad.
It
was
too
lost
that
it
would
seem
like
it
was
gonna.
It
was
gonna,
go
a
little
bit
easier,
but
if
there's
a
way
that
we
can,
we
can
do
it
to
make
it
more
valuable.
We
certainly
would
want
to
do
that.
D
F
John
atkins
1888
post
lane
jacksonville
beach,
as
has
been
stated
that
I
do
have
a
contract
to
purchase
the
split
lot,
which
is
not
a
split
lock.
Just
so
we're
clear
on
this.
This
is
two
planets
right.
F
F
F
These
are
substandard
lots
for
rs1
rs1
is
10
000
square
feet.
These
are
7
200
square
feet,
we're
getting
real
close
to
a
blended
rate
of
35
percent.
If
these
were
full-sized
lots,
so
on
his
face,
the
58
is
shocking.
You
know
wow,
that's
really
high.
I've
been
up
here
enough
before
you
guys.
Let
me
know
please
to
know
that
you
know
there's
a
heartburn
over
50.
F
What
I'm
saying
is
the
end
result
here
is
going
to
be
something
that
is
not
overwhelming
for
these
two
pieces
of
property.
So
again,
if
you
put
that
stipulation
in
there
that
the
parcel
is
split
off
may
not
require,
may
not
be
granted
will
not
be
required.
Regular
variants
for
the
construction
of
a
new
home,
I'm
perfectly
fine.
D
F
Is
it
something
we
I
don't
know
if
this
is
a
question
for
george
the
plane
department
that
we
came
in
with
an
overall
plan
for
both
lots
and
the
variance
was
granted?
You
may
build
this
on
this
lot
and
you're
allowed
to
split
it
off.
You
definitely
have
the
power
to
do
that.
To
say
yes,
this
when
you
split
these
two,
because
otherwise
what
you're
saying
up
here
is
we
hold
up.
F
F
F
E
Of
looking
at
drainage
on
property
has
been
shifted
from
the
public
works
department
to
my
department,
one
of
the
things
that
I've
learned
in
studying
about
how
that
works.
When
you
talk
about
the
impervious
surface
area,
which
is
what
you're
concerned
about
with
luck
coverage,
there
are
ways
to
mitigate
that
only
existing
light.
E
If
that,
if
that's
a
concern
in
the
end,
not
not
just
this
any
lot
that
may
go
over
50.
If
steps
were
made
to
mitigate
the
stormwater,
it's
an
offset.
For
instance,
there
is
no
current
stormwater
management
plan
for
that
lot.
If
there
were
one,
it
would
mitigate
the
fact
that
it
was
over
over
the
black
coverage
and
is
that
something
that
this
board
is
empowered
to
request
or
tack
on
to.
E
Absolutely
I
would
believe,
because
now
you
are
talking
about
this
one
lot
that
he
has,
which
is
the
one
that
he's
asking
for
a
variance
on.
For
instance,
if
you
suggested
you
approve
more
than
50,
with
the
caveat
that
they
do
a
storm
water
management
program
on
there
to
handle
the
water,
because
it's
over
the
lock
coverage
just
throwing
it
out
there.
E
Well,
we
can
tap
something
on
this,
that
they
just
say
a
store
water
management
plan,
yes
or
some
type
of
mitigation
for
the
stormwater,
which
would
be
approved
by
the
city,
which
would
mitigate
the
damages,
which
a
lot
of
properties
of
nowadays
they
have
to
be
guttered.
They
have
to
be
downspouted
and
that's
all
part
of
handling
the
stormwater,
which
is,
which
is
what
the
intent
of
the
code
is
when
it
regulates
the
outcome.
E
But
that's
certainly
at
your
discretion,
but
when
you're
looking
for
options
of
what
mike
did
and
that's
something
that
the
applicant
would
have
to
work
with
the
city
on
before
implementing
right
to
make
sure
that
they
were
actually
handling.
And
why
wouldn't
we
just
make
it
49
corporations
than
george?
H
G
G
Yes,
it
may
not
be
a
financial
hardship
for
mr
atkins,
but
it
is
for
me
due
to
divorce
in
2020.
So
for
me
to
stay
in
the
home.
That's
why
I'm
pursuing
the
sale
of
the
backlot.
It's
not
my
desire
to
do
it,
but
in
order
for
me
to
stay
in
the
home,
that's
what
I
need
to
do,
not
if
that's
relevant.
A
G
So
again
we
suppose
the
end
of
whatever
we
prove
at
that
point,
because
I
don't
think
I
want
to
carry
forward
this
kind
of
law
coverage.
If
this
house
was
taken
away,
it's
just
40
or
50,
whatever
percent
we
decide
on
so
again,
that's
just
one.
I
would
like
to
add
on
when
we
put
the
motion
on
to
it.
Whatever
we
decide
will
be
fair.
E
Yeah,
I
don't,
I
don't
think
anybody
wants
to
see
a
home
with
that
much
lot
coverage,
but
the
the
part
that
I'm
having
an
issue
with
is
that
he
purchased
the
home
like
this,
and
it
was
built
long
before
he
built
and
expanded
long
before
he
purchased
it.
And
to
me
that's
the
actual
hardship
is
that
he
he
inherited
the
home
and
the
law
coverage
in
this
state,
and
I
I
don't
know
the
answer
to
this.
D
D
I
prefer
that
they
come
back
with
some
sort
of
bold
little
breaking
law
coverage.
Now
I
mean
because
built
in
1948
purchases
in
2007,
I'm
not
that
concerned
about
the
setbacks
versus
the
lock
coverage
and
come
back
to
something
for
us,
then
that
would
be
more
eligible.
E
E
F
F
B
B
D
We
have
the
next
case.
Please
yes,
case.
Number
doa
number
20-100-202
the
applicant
is
cultural
construction
and
consulting
the
agent
is
jeffrey
taft.
Our
owner
is
james
m.
Howard
property
address
is
40,
35
public
drive,
personal
id
is
181
679-000
legal
description
is
lot
8
block
d
panavidra
accepting
therefore
they're
from
any
lands
lying
east
of
the
erosion
control
line
for
sega
county
current
zoning
is
an
rs1
mostly
consider
a
variance
from
the
land
development
code.
H
H
The
the
landscape
architect
has
very
beautifully
covered
every
square
inch
of
anything
that
would
be
covered
a
lot
like,
for
instance,
he
took
into
consideration
the
overhangs
of
the
roof
he
added
in
for
the
pool,
but
he
added
in
for
the
hvac
equipment.
All
these
things
are
covered
that
make
up
that
three
percent
overage,
so
he
even
had
it
for
defenses
that
are
along
the
side
of
the
property
when
we
bought
it.
The
fences
were
not
included
in
the
live
coverage
calculation,
but
because
we're
building
a
new
fence
he's
added
in.
H
It
out
so,
we
would
like
to
ask
if
we
could
use
a
block
like
a
belgium
type
block
in
the
driveway,
so
we
have,
we
won't
have
the
rabbit
always
sliding
out
into
the
street
and
to
mitigate
that
even
further
in
terms
of
our
earth.
Mr
knight
mentioned
something
about
previous
surfaces.
We've
added
gutters
we've
had
it
downspouts
that
will
help
with
the
water
and
then
we've
also
had
it
in
the
after.
H
This
was
submitted.
We
put
in
place
grass
strips
between
the
blocks
of
the
driveway,
so
that
even
reduces
it
even
slightly
more.
So
if
you
take
away
the
fences
which
you
are
calculated
at
three
percent
and
you
take
away
the
additional
grass
that's
going
to
be
actually
embedded
into
the
driveway,
I'm
not
really
sure
they're,
even
over
so.
G
H
D
H
That's
part
of
it
also
calculated
the
fences
which
actually
exist.
Apparently
we
did.
The
initial
lock
covers
calculation,
they
didn't
calculate
the
wall
defenses
and
in
this
calculation
they
are
calculated.
So
it's
a
minor
number,
but
he
also
said
he
calculated
him.
The
full
equipment
block
coverage,
the
hvac
equipment
coverage,
the
shedding
the
roof
shed
over
the
overhangs.
G
H
E
And
I'm
sorry
did
I
understand
that
you
said
you're,
adding
some
grass
patches
to
beyond.
D
B
C
I
just
want
to
say
that
first
of
all,
the
house
is
amazing
and
I'm
really
impressed
by
how
tall
it
is.
It
already
seems
like
it's
taller
than
the
hydrant
and
it's
a
spectacular
house-
and
I
know
three
percent
doesn't
seem
like
much,
especially
when
we
heard
these
other
ones
that
I
go
on.
I
just
wanted
to
remind
you
guys
that
I
live.
You
know
the
back
of
duval
palm
right
there
and
two
out
of
the
last
three
storms.
C
C
D
C
G
C
G
D
I
have
martin
dupree
would
like
to
address
the
council.
A
I
just
like
to
say
I'm
opposed
to
the
variance
because
of
the
flood
issues.
Since
I've
lived
in
my
house,
I've
had
three
floods
that
I
had
to
file
flood
claims
for,
and
it
is
a
problem
in
our
neighborhood.
The
house
is
beautiful.
There's
no
question.
There's
got
to
be
a
compromise
that
that
doesn't
increase
the
impervious
payment.
D
B
G
B
G
Good
evening,
thanks
for
hearing
my
testimony
here
tonight,
I
live
at
4112,
which
is
just
almost
exactly
across
the
street.
All
is
all
breaks.
Briggs,
40
30
is
right
across
the
street
and
then
morgan's
right
next
to
him.
I
know
that
there
have
been
three
flooding
instances.
I've
been
in
the
house
for
26
years
down
the
street
for
30
years
and
we
are
in
flood
zone
double
x
to
fema.
The
latest
fema
study
18
puts
us
in
flood
zone
xxx.
G
G
We
could
call
when
the
hurricane
was
coming
in
and
public
orders
would
bring
a
backhoe
down
and
clean
out
the
culvert
37,
because
that
that
water
drainage,
it's
french
green,
which
comes
all
the
way
from
pond
weaver
all
the
way
down
there,
and
it
comes
back
right
behind
all
of
the
houses.
It's
behind
tom's
house
to
the
lesson
behind
paul's
house
to
the
east
and
flows
down
into
lake
embalm
and
drains
out
the
culvert
and
237th
street.
For
the
ocean,
the
last
few
times
we've
called
public
works,
they've
told
us.
G
Well,
we
don't
do
it
anymore,
because
we're
going
to
get
more
complaints
about
the
danger
and
the
hassle
of
clearing
the
culvert
at
37th
street,
then
we
do
about
a
foot
I
haven't
called,
but
I
know
that
john
bordellon,
dr
bordello
has
called
and
he
was
told
no,
we
don't
do
it
anymore.
So
really
what
we're
here?
What
we're
here
to
talk
about
is
two
fundamental
concepts.
One
is
safety
one's
hardship.
G
We
just
we've
heard
a
lot
about
flooding
and
I
won't
go
over
that,
but
they
said
it's
true.
I
know
there's
been
flooding
at
the
meadows
house
at
the
dupree
house
at
the
borderline
house
and
I
don't
know:
what's
happened
on
the
other
side
of
lake
duval
on
the
east
side
or
the
west
side,
but
it's
probably
worse
there.
G
So
there's
as
the
owner
mentioned,
there
is
a
very
steep
driveway,
there's
three
or
four
times
the
impervious
surface
for
the
house
and
was
there
before
it's
impervious
all
the
way
along
both
sides
and
working
south
to
pave
where
the,
where
those
fences
are
and
as
he
wants
more
paving
out
on
the
front.
I
don't
think
it's
a
reasonable
request.
G
I
don't
think
the
denial
of
this
request,
which
is
what
I'm
asking
you
to
do.
What
would
result
in
the
exceptional
hardship?
The
code
says
that
standards
applicable
to
all
variances
must
find
that
special
conditions
and
circumstances
exist
which
is
peculiar
to
this
partial
land.
It
also
says
that
these
special
circumstances
and
conditions
must
not
result
from
the
actions
of
the
applicant,
which
is
throwing
them
filling
the
lot
up
with
the
house
and
then
walking
more
for
parking.
G
D
I'll
bring
the
spoke.
It
also
has
a
letter
here
concerning
the
variance
request
for
38
percent
lock
coverage
a
little
35.
What
is
the
hardship?
The
subject
addresses
new
construction.
Where
will
the
water
grow?
Once
again,
the
vault
drive
has
been
redesigned
to
reduce
street
flooding,
but
lake
duval
still
overflows.
The
house
wheel
looks
nice
and
is
very
well
done.
I
have
no
complaints.
D
D
D
D
This
tree
had
a
long
history
of
flooding.
Even
after
a
typical
afternoon
rainfall.
It
is
bordered
by
water
on
both
sides
of
lake
duval
in
the
atlantic
ocean,
the
city
of
jacksonville
beach,
invested
our
tax
dollars,
improved
the
drainage
system
and
helped
minimize
flooding.
The
board
can
actually
keep
allowing
for
larger
lifetime
without
putting
our
current
residents
in
danger
of
future
flooding.
D
Someone's
home
flooding
is
a
hardship
not
having
parking,
because
two
people
want
a
park
to
entertain
is
now
hardship
being
in
the
home
design.
Business.
Mr
howard
should
be
crystal
clear
on
dimensions
and
measurements.
He
deliberately
chose
to
squeeze
in
an
oversized
house
and
essentially
have
plans
to
ask
for
this
variance
later
the
house
that
sees
the
height
limit
at
various
points
and
endorse
large
two-story
homes.
D
It's
by
far
the
tallest
home,
and
now
he
wants
more.
There
is
nothing
unique
or
different
about
these
lots
that
require
a
variance
for
decades.
People
have
built
and
remodeled
on
this
street
within
the
allotted
35
live
coverage.
Families
have
lived
here
for
generations
comfortably
with
35
percent
coverage,
I'm
glad
you
shared
guarani
for
special
events
and
celebration.
We
have
survived
just
fine,
helping
our
neighbors
out
when
our
parking
is
needed.
D
Sadly,
we
are
seeing
a
very
selfish
trend
of
people
over
building
and
asking
for
variances
later
the
hardship
for
the
residents
have
endured
for
the
past
one
and
a
half
years
counting
are
living
on
the
cult
of
construction
of
workers
who
possibly
break
our
city
ordinances
listening
to
workers
before
they
build
the
safety
dangers
that
have
been
sadly
created
due
to
over
abundance
of
large
trucks,
etcetera
having
one
and
a
half
years,
not
being
able
to
literally
see
the
road.
The
safety
pull
out
in
your
driveway
picking
up
the
construction.
A
A
H
I
didn't
know
that
the
water
behind
there
was
called
regular
ball,
and
I
did
not
know
that
as
I,
as
I
have
said,
the
landscape
architect
calculated
all
this
came
up
with
everything,
including
pads
roof,
overhangs,
we're
still
only
at
three
percent
three
percent's,
a
pretty
small
amount
to
be
talking
about.
H
H
Change
the
driveway
to
gravel
it's
going
to
shed
out
of
industry,
it's
going
to
create
a
different
problem,
so
I'm
not
sure
I
have
an
answer
for
that.
We
complied
with
building
coordinates
with
type
restrictions
and
everything
that
had
to
be
done.
All
that
was
done.
A
I
have
a
question.
It
seems
a
lot
it's
higher
than
the
other.
Lots
in
that
area
is
you're
sure
that
this
bill,
you
didn't
put
fill
in.
A
A
F
B
G
Let's
go
to
election
for
new
york.
G
E
A
A
E
Because
of
the
mayor,
I
once
you
adjourn
the
meeting
I
just
like
five
minutes.
Okay,
thank
you.