►
From YouTube: Planning and Zoning Commission Meeting 061721
Description
Planning and Zoning Commission Meeting 061721
A
B
A
You
can
we
have
a
motion
to
excuse,
commissioner,
dominguez
and
daniella,
so
emotions
for
a
second.
A
A
D
A
A
A
E
All
right,
yes,
mr
chairman,
for
the
record
the
applicant
is
san
ysidro.
Northeast
limited.
The
engineer
of
record
is
slay
engineering,
approximately
800
acres
located
north
of
balboa,
loop
and
east
of
east
point
drive.
Those
uses
are
residential,
commercial
and
institutional
general
location,
aerial
view
street
view,
and
the
proposed
master
plan.
F
Yes,
good
afternoon,
mr
chairman
commissioners,
my
name
is
ramirez.
I
work
for
city
engineering
and
I'm
the
engineer
for
this
master
plan.
We
concur
with
all
the
comments,
except
for
the
planning
comment.
Number
four,
which
is
the
comment
for
a
dead
end
street
that
exceeds
500
feet
and
I
would
like
to,
I
guess,
explain
the
situation
that
we
have
for
this
subdivision.
F
There's
a
lot
of
elevation
difference
for
this
phase,
so
we're
kind
of
locked
in
where
we
have
the
extent
of-
and
it's
called
street
b
here
on
the
agenda,
but
it's
called
las
colinas
we're
planning
we're
kind
of
locked
in
on
how
how
much
we
can
extend
that
street
and
so
we're
kind
of
locked
in
on
on
that
length.
F
It's
it's
feasible.
The
way
we
have
it
right
now
to
make
sure
that
the
lots
on
the
the
laws
that
are
fronting
the
san
isidro
elementary
school.
In
order
for
them
to
work,
we
need
to
have
the
intersection
where
we
have
it
right
now.
The
total
length
right
now
is
approximately
650
feet.
I
know
we're
over
the
500
feet,
but
I
was
I
wanted
to
see
if
we
can
get
approval
without
without
that
comment,
I'm
also
here
to
answer
any
questions
that
you
may
have.
A
F
That
and
also
that
block
was
laid
out
that
way
because
it's
on
top
of
a
hill,
I
know
we
cannot
due
to
you,
know,
there's
no
concerts
on
the
plan,
but
in
reality,
if
you
go
to
the
side
it's
on
top
of
a
hill
and
that
street
is
right
at
the
center.
So
that
kind
of
dictates
how
much
we
can
extend
that
street.
D
F
If
you
look
at
the
aerial
you
see,
where
kind
of
where
that
arrow
is
pointing,
you
will
see
that
there's
like
there's
vegetation
all
around,
but
there's
a
strip
of
of
of
bare
land
that
say
that
there's
not
like
no
vacation
at
all.
That's
where
that
street
is
laid
out
right
now
and
it's
right
at
the
top
of
the
hill.
I
F
Yeah-
and
this
is
the
northern
map,
but
here
so
that
street
you
know
connects
through
here.
So
this
is
elevated.
It's
like
20.
This
point
here
is
like
maybe
40
feet
higher
than
over
here,
so
we're
kind
of
tied
into
the
type
of
terrain
that
we
have
here.
That's
one
thing,
the
other
thing
I
don't
know
if
you
notice,
but
we
have
a
lot
of
empty
space,
we're
trying
to
do
there's
a
different
approach
that
we're
doing
we're
not
trying
to
do
a
grid.
Like
you
see
here.
F
F
The
way
it
is,
I
know,
there's
not
a
lot,
but
we're
just
gonna
leave
the
brush
there.
So
I
guess
that
was
that
was
the
main.
C
On
his
explanation,
as
far
as
elevation
the
hill,
how
do
y'all
still
feel
about
your
comment?
There
that's
been
placed.
I.
E
Mean
ultimately
it's
a
decision
of
the
commission.
I
mean
there
are
some
valid
terrain
issues
that
they
do
have
there,
and
I
do
understand
that
they're
trying
to
preserve
the
view
on
that
area.
It's
actually
quite
nice
view
of
laredo.
So
I
mean
again
it's
up
to
that.
It's
up
to
the
commission,
the
distance
it
does
exceed
the
500,
but
I
mean.
A
A
F
A
F
A
F
F
F
There's
there's
the
I
guess.
The
low
point
will
be
that
big
rectangle
on
top
is
sanitary,
elementary
school,
so
just
on
the
south
east
corner,
that's
where
the
southwest
corner
that
that's
the
level.
A
That's
what
we're
taking
it!
That's
what
you're
going
to
collect
here?
Okay,
all
right!
We
have
a
motion
in
a
second
all,
those
in
favor
of
the
motion
signify
by
saying
all
right,
all
right,
all
those
again
signify,
but
nothing
hurt
motion
carries.
Thank
you.
Thank
you
all
right,
the
next
seven
that
we
have
is
review
and
we
and
revision
to
parkview
at
century
south
park
master
plan.
The
purpose
of
this
revision
is
to
reconfigure
faces
and
remove.
E
The
street
the
intent
is
residential
and
commercial
for
the
record.
The
applicant
is
xtx
land
development.
The
engineering
record
is
surface
engineering,
approximately
20
acres
located
south
of
hymas
about
the
memorial
highway
and
west
of
century
city
boulevard.
The
zoning
for
this
104th
law
development
is
r1a
and
b3,
and
the
proposed
use
is
residential
and
commercial.
E
H
A
Motion
we
have
a
second
by
commissioners,
all
those
in
favor
of
the
motion
signify
by
saying
all
right.
All
right,
those
against
motion
carries.
Thank
you.
The
next
action
we
have
is
consideration
of
the
following
preliminary
flats
and
preliminary
replace
preliminary
consideration
of
the
plan
of
sales.
North
east
las
palmas
subdivision
the
intended
residential
and
commercial.
E
The
african
san
diego
northeast
northeast
subdivision
limited
the
engineer
of
records
engineering,
approximately
33
acres,
located
east
of
bucky,
haldman
and
north
of
simon
bolivar.
The
zoning
for
the
64
law
development
is
r1
proposed,
uses
residential
and
commercial
general
location,
real
view
street
view.
F
Good
afternoon
again,
engineering,
we
concur
with
other
comments,
except
for
the
same
comment
as
before.
This
is
common
number
five
and
it's
the
dead
end
length
of
that
exists
over
500.
D
All
right
do
I
hear
a
motion
motion
to
approve
the
subject
of
the
same
change
that
we
did
on
the
previous
moving.
A
E
Yes,
mr
chairman,
for
the
record,
the
applicant
is
pakistan
holdings
llc.
The
engineer
of
record
is
top
site
civil
group,
approximately
17
and
three-quarters
acre
located
north
of
doc
adams
drive
and
kilim
industrial
boulevard.
This
one
into
this
one
lot:
developments
m1
and
the
proposed
use
of
industrial
general
location,
aerial
view
street
view.
I
All
right
good
evening,
mr
commissioner,
I
mean
mr
chairman,
commissioner,
ricardo
villarreal
with
top
side
civil
group.
We
concur
with
everybody's
comment
on
here.
We
just
want
to
clarify
something
that
the
northern
boundary
of
pakistan
is
the
right-of-way
line
for
viaceo.
So
I
know
there
was
several
comments
in
there
from
texas
from
traffic,
so
that
is
the
southern
boundary
for
ico,
as
it
currently
is
a
lot
very
good.
I
A
E
The
for
the
record,
the
applicant
is
ranchers
limited.
The
engineer
of
record
is
top
side
civil
group,
approximately
1.93
acres,
located
at
the
southwest
corner
of
remington
drive
and
u.s
high
59
and
the
zoning
for
this
one
lot.
Development
is
b3
and
the
proposed
use
is
commercial,
general
location,
aerial
view
street
view.
I
Mr
chairman,
commissioner,
with
topside
civil
group
again
representing
the
client,
we
do
have
just
one
question
for
the
utility
comment
number
one.
It
might
be
just
specific
to
something
that
they're
going
to
require
later
on,
but
the
comment
basically
states
that
we
need
to
have
a
conceptual
plan
to
loop,
the
lines
there.
It
might
just
be
wording
the
way
this
site
is
laid
out.
I
B
I
It's
this
one,
the
water
and
says
knee
conceptual
utility
kind
for
water
and
sanitary
sewer
means
to
be
linked.
Any
off-side
improvements
need
to
have
easier,
which
I
think
in
the
offsite
improvements
yeah.
They
do
need
to
have
easements,
but
I
guess
the
way
I'm
reading.
The
comment
is
that
we
need
to
provide
a
utility
plan
so
that
we
can
loop
the
lines.
But
in
this
case
we
don't
need
to
loop
the
line.
So
it
might
be
something
that
if
we
just
can
improve
it
based
off
of
one
stop
shop
and
that's.
C
A
B
A
Other
questions
for
the
engineer:
nobody
all
right,
I'm
back
in
motion
to
approve.
Subject,
other
comments.
We
have
a
motion.
We
have
a
second
second,
second
from
johnny,
all
those
in
favor
of
the
motion
signify
by
saying
aye
aye.
All
those
against
motion
carries.
Thank
you.
The
next
title,
preliminary
consideration
of
the
plata
lorenza
platt,
lock
one
block
one
day,
tennis
residential
mr.
E
Chairman
for
the
record,
the
applicant
is
gilberto
valdez
jr.
The
engineer
of
record
is
tec
engineers
and
consultants,
approximately
one
and
a
quarter
acre
located
west
of
balboa
group
and
south
of
casa
la
road
and
there's
only
for
this
one.
La
development
is
b4
and
r3,
and
the
proposed
uses
residential,
her
location,
aerial
view,
great
view.
J
Good
evening
from
tech
engineers,
we
agree
with
all
the
comments,
except
for
water
utilities.
At
the
end
of
comment
number
one,
is
it
not
recommended
to
preliminary
acceptance?
I
don't
get
it
if
we
don't
get
here
for
preliminary,
how
we
supposed
to
know
what
kind
of
comments
are
we
supposed
to
meet?
Okay,.
A
That's
a
good
question:
vanessa
ralph.
E
When,
when
I
don't
know
exactly
what
how
why
their
comment
is
worded
that
way
when
we
had
spoken
to
text
off,
they
had
shown
us
a
preliminary
design
of
a
potential
widening
for
the
loop
in
that
area.
I
do
believe
that
they
can
work
this
out
at
a
one-stop
shop
and
would
text
that
as
well.
I
mean
that's
how
I
would
perceive
that
that
they
should
that
they
should
go
forward
with
this
preliminary
yeah.
It
is
preliminary
and
they
can
be
with
tech
side.
E
It
seemed
like
it
might
be
a
very
slight
impact,
okay,
but
just
to
keep
that
in
mind.
A
You
have
an
existing,
you
don't
have
an
existing
entrance
there
right
now.
Do
you
on
the
property.
C
A
D
C
A
E
Mr
chairman,
for
the
record,
the
applicant
is
aquido
management,
2
llc,
your
junior
record
sports
and
engineering,
approximately
two
and
a
quarter:
acres
located
south
of
state,
highway,
39
and
east
of
los
angeles
boulevard.
The
zoning
facility
law
development
is
r1b
and
r1a
and
the
proposed
residential
general
location
aerial
view
street
view.
B
Okay,
yeah
all
right
hello,
mr
chairman
wayne,
with
porous
engineering.
We
agree
with
all
the
comments
except
for
traffic
item
number.
Six.
If
you
could
take
it
back
to
the
I'll,
be
happy
to
explain
it.
They're
asking
us
to
connect
cervando
with
an
existing
street.
That's
in
a
previously
planted
area.
This
would
require
us
to
go
through
lots
that
are
that
are
built
on
that
we
no
longer
own.
We
it
just
it's
they're
asking
for
something
that
can't
be
done.
B
What
they're
saying
is
they're
asking
to
extend
this
street
up
to
this
street?
This
is
previously
recorded.
There's
a
house
there's
drainage,
inlets
right
here,
there's
a
lot
owned
by
somebody
else,
and
they
go
up
the
property
lines
all
the
way
there.
So
I
can't
get
through
there
now.
It
would
also
create
other
traffic
issues
and
for
the
record
too,
this
is
a
plaque
that
has
appeared
in
front
of
this
commission.
I
mean
the
mastermind
has
appeared
in
this
exact
way
out
of
front
of
this
commission
multiple
times.
B
B
At
all,
so
the
rest
of
the
comments
we're
fine
with
but
we'd
like
that,
one
strict,
okay,
any
any.
A
A
We
have
a
motion
on
a
second
all,
those
in
favor
signify
by
saying
aye
aye.
All
those
against
motion
carries.
Thank
you.
Thank
you.
Very
much.
Next
item
is
preliminary
consideration.
The
replied
of
lot,
one
block,
one
501
imperial
partners,
banana
subdivision
plot
into
log,
one,
a
block
one
block-
I
guess
it's,
I
501
imperial
partners,
another
celebration
replied,
the
intend
is
multi-family.
E
Chairman
for
the
record,
the
applicant
is
501
imperial
partners,
lp
and
501
web
realty
llc.
The
engineer
of
record
is
power:
consulting
llc,
approximately
15
acres,
located
west
of
mcpherson
and
north
of
shiloh.
The
zoning
for
this
one
other
known
as
r2
and
v3,
and
the
proposed
uses,
multi-family
general
location,
aerial
view
or
street
view.
E
I
Okay,
yes,
sir
good
evening,
my
name
is
fernando
blanco,
representing.
A
C
A
Questions
motion
to
approve:
we
have
a
motion.
We
have
second,
second,
second,
a
second
from
commissioners,
all
those
in
favor
signify
by
saying
aye
aye.
Those
against
motion
carries
all
right.
The
next
item
we
have
is
reconsideration
of
the
following
preliminary
plants
and
preliminary
replays
preliminary
reconsideration
of
the
plight
of
parkview
at
century
south
park
subdivision
phase
one
and
granting
of
a
variance
to
reduce
a
front
yard
setback,
20
feet
to
10
feet
on
lots,
one
and
two
block
one
and
locks
one
and
two
block
two
in
tennis.
E
Residential
for
the
record
stx
land
development,
llc,
the
engineer
of
record-
is
sure
for
engineering
company,
approximately
seven
point:
three
acres
located
south
of
jaime
zapata
and
west
of
century
city
boulevard,
the
zoning
for
the
fortified
lot
of
this
r1a,
the
proposal
to
the
residential
general
location,
aerial
view
street
view.
E
H
Good
evening,
mr
chairman,
frank,
estrada
and
in
the
commission
apologize
frank
style
with
surefield
engineering
and
we
concur
with
staff
comments.
A
Frank,
I
got
a
question
for
you
on
the
bearings
that
you're
asking
for
in
those
slots.
What
is
the
depth
of
those
lots.
H
H
H
Sir,
we're
kind
of
bounded
on
the
east
side
over
here
is
on
the
west
side.
This
is
owned
by
the
city
of
laredo,
and
this
is
another.
This
is
another
developer
sitting
right
here
and
it's
kind
of
hard
to
get
into
the
typical
cul-de-sac
framework
that
we
typically
do
so
we
had
to
okay
up
these
lots.
The
way
they
were
and
that's
why
we
requested
america.