From YouTube: 3.16.2023 Planning Board
Description
3.16.2023 Planning Board
A
A
We
have
determinations
of
completeness
for.
A
A
A
A
A
A
B
A
From
liberty,
mutual
insurance
for
property
at
225,
borthwick
avenue
requesting
a
wetlands.
A
E
For
the
record,
eric
weinrude
with
altus
engineering
tech,
it
application
is
for.
E
E
E
E
E
Water
and
sanitary
services
are,
are
both
adequate
and
and
the
connections
are
fully
separated.
E
E
We're
tying
into
those
with
the
the
addition
in
the
sanitary
services
adequate.
We
are
uniquely.
E
On
and
similar
to
what
we
did
with
jimmy's,
we
are
having
an
internal
grease
trap,
because
there.
E
E
Site
development
issues
on
the
site:
it's
it's
pretty
straightforward
project.
E
Can
statement,
but
the
lot
is
only
6
245
square
feet,
so
the
that
requirement
does
not
apply.
A
E
E
Been
renovated
through
the
on
congress
and
including
jimmy,
and
I
think
that
the.
E
E
E
To
say
it
looks
like
eastern
blocks
post
world
war
ii,
but
it
certainly
it's
a
it's
a
tired.
F
And
then
I
guess
related
to
that.
So
I
see
that
picture
in
our
packet
and
also
your
inspiration.
F
G
So
the
existing
building
is
has
burke
redbrick
palasters.
That
will
be.
G
A
But
thank
you.
Yes,
they
do
have
purview
over
material,
colors,
permanent,
colors,
okay
and
then.
F
F
A
Yes,
andrew
more
of
a
general
statement,
but
I
feel
like
within
consideration
of
whatever.
D
A
A
Anybody
on
zoom
we
do
have
attendance
attendees,
but
no
one
has
raised
their
hand.
H
H
Someone
else,
but
I
think
I
think
that
having
this
built
out,
the
way
it
is
is
going
to
help.
A
A
E
Eric
weinrib
with
altus
engineering,
I'm
also
with
me
tonight,
is
project
architect,
roger.
E
Robert
woodmeier,
with
winterhoban
attorney
derek
durbin,
jeff
dyer
it
with
who's.
E
Operating
the
facility
and
sean
creeley,
the
the
future
owner
and
the
current
owner,
mr
labree.
E
It's
as
I
said,
tax
map
144
lot,
23,
it's
the
former
getty
at
the
corner
of
cabot
and.
E
Islington
street
we've
been
before
you
on
for
several
approvals
on
this
and
and
I'm
a
couple
of.
E
Starts
and
never
nothing's
really
gained
traction
over
the
years
and
for
various
reasons
it
just.
E
The
derelict
or
neglected
site
with
with
no
disrespect
to
anyone,
but
it
has
worked
out.
E
Well,
I
think,
for
the
city
over
the
last
few
years,
using
it,
for
you,
know,
an
area
for.
E
E
Former
gas
station
into
a
bagel
shop,
I
believe
that
the
project
will
improve
the
vitality
to
the.
E
E
It's
highly
paved
now,
it
has,
you
know,
literally
full
access
on
cabot
and
islington
streets
and
and.
E
Building
doesn't
really
fit
for
the
for
the
use
and
that's
why
we
had
to
get
multiple
variances.
E
For
our
conditional
use
permits
and
for
parking,
outdoor,
dining
and
the
site
plan
review.
E
E
Property
to
the
west,
and
and
we
wanted
to
keep
that
one
way
in
only
so
that
you're
not
creating.
E
A
traffic
conflict
coming
out
of
islington
street.
We
have
that
controlled
intersection.
E
I
didn't
really
think
that
it
was
going
to
be
a
healthy
tree.
It's
all,
surrounded
by
pavement.
E
E
E
E
E
E
Worked
off
the
97
tonight
at
2017,
bhb
design
and
when
the
plans
went
to
construction
and
bid.
E
It
there
were
five
items
in
the
the
tac
or
the
staff
memo
I
apologize.
We
are
in
agreement.
E
E
Similar
in
size
to
the
white
heron,
yet
we're
providing
200
percent
more
parking
than
the
white.
E
E
E
Eric
eby,
and
so
should
this
project
be
approved.
We
would
roll
that
through
on
all
our
plans.
Okay,.
A
And
either
you
or
somebody
will
explain
hours
of
operation.
Yes,
I
I'll
let
the.
F
J
J
J
A
J
Decided
as
a
robert
robert
put
in
there,
I
think
it's
not
not
a
lounge.
I
don't
think
anything
would.
J
Ever
be
a
lounge
at
best,
it
would
be
a
you
know,
an
eatery
that
stays
open
to
capture
more
revenue.
J
Yeah,
just
the
option
would
be
nice
to
have
right.
Okay,
I'm
not
suggesting.
A
Cyclone
questions,
yes,
my
first
question
is
kind
of
about
basic
buildability,
because
when
I
look.
F
Says
it
talks
about
nhdes
case
number
2284
the
release
of
gasoline
was
reported
to
new.
F
Under
this
site
and
case
number,
the
groundwater
is
actively
being
monitored
under
this
other
case,.
F
K
K
K
With
especially
with
petroleum
contamination,
the
the
person
there
forever
I
I've
owned
several.
K
Of
these
contaminated
sites-
and
that's
that's
the
way
it
proceeds,
whoever
the
owner
is
that.
K
K
Lee
melts
petroleum
or
getty
is
the
one
that
filed
that
application.
They
remain
liable
for.
F
It's
gas
and
oil
remediation
are
not
ongoing.
They've
removed
over
200
yards
of
contaminated.
K
They
figured
out
how
to
make
gas
tanks
that
didn't
leak
and
so
that
remediation
work
has
been
done.
K
I've
been
told
by
the
state
they
have,
I
think,
approximately
up
to
1.4
million
dollars
if
needed,.
K
K
K
Proceeding
very
well
and
according
to
plan-
and
there
are
no
concerns
currently
on
the
part
of.
F
A
A
K
Have
continuous
access
to
the
property?
They
have
environmental
engineers
that
sample
the.
K
The
monitoring
wells,
I
think,
twice
a
year,
they
have
full
access
to
the
property,
they
have.
A
Get
to
get
it
all,
I
guess
that's
the
imaginable
horrible!
That's
why
they
that's
why
they
have.
K
Monitoring
wells
and
sample
them
to
to
follow
the
the
levels
of
contamination
in
the.
H
H
Excavating
for
the
grease
trap
you
hit
high
high
numbers,
then,
what's
your
what's
your.
H
J
I
am,
and
they
concluded
that
they
felt
as
if
the
site
was
safe,
when
we
didn't
need
to
proceed.
J
K
Follow-Up
question:
yes,
joe
in
just
a
second
eric,
just
a
quick
question
and
in
the
event.
M
E
E
A
Yes,
to
get
on
a
different
topic,
you've
put
the
addition
in
the
back,
which
has
really
narrowed
the.
B
E
E
E
It's
not
a
large
trash
truck,
it's
all
totes
and
so
forth.
Okay,
that
was
with
me
my
next.
B
A
Yes,
a
quick
question
on
the
on
the
storm
water.
So
just
a
little
bit.
H
Into
the
the
city
drain
system,
so
there's
there's
no
treatment
on
the
site
today
and
it's.
E
C
There's
jane
yeah,
I,
the
number
of
lights,
which
are
a
concern
that
has
been
raised
by
people.
F
Operation
and
the
actual
use,
so
I
just
want
to
understand
that
the
use
of
the
word
lounge.
E
E
F
F
E
E
E
E
Their
reputation
will
not
be
good
and
they
will
not
have
it
that
neighborhood
vibe
that
they're.
F
In
the
current
plan,
so
that
everybody
is
noticing
that
I
believe
on
our
site
lighting
plan.
O
Hello,
robert
wedemeyer,
with
winterholdman,
architects
and
design.
D
Ground
level
for
pedestrians,
walking
about
the
patio
yeah
I
mean
under
the
canopy
we
have,
I
think.
O
O
Pulled
on
the
revised
yeah
and
so
it'll
be
more
of
a
lattice
or
some
mesh
scenario.
D
E
Staff
is
asking
that
that
wire
be
entirely
removed
and
all
the
burlap
removed.
So
that's.
E
D
Someone
who
walks
bikes
and
drives
to
white
hair
and
frequently
when
that
parking
lot.
E
E
B
E
E
To
keep
going,
we
don't
anticipate
because
of
the
visibility
of
the
lot
that
people
will
on.
A
I
guess
we'll
have
we
have
three
public
hearings
we're
going
to
go
through.
Q
P
Of
what
I'll
be
talking
about,
and
the
other
one
is
t1
and
t2
of
this
site
plan,
which.
P
P
Was
the
question
there's
one
one
by
itself
and
then
three,
so
you
should
have
gotten
three.
P
F
P
P
P
Hit
the
either
this
retaining
wall
or
the
curb
or
whatever.
So
there
are
a
few
places
that
do
hit.
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
A
Anybody
else
wants
to
speak
too
far
against
mr
chairman,
members
of
the
board
on.
R
L
Yeah
that
that
last
comment
is,
is,
I
guess,
a
misunderstanding,
we'll
say
by
mrs
prater
about.
R
R
Or
zoning
relief
requested
for
anything
greater
than
the
50
within
the
building,
so.
S
S
The
environmental
concerns
I
just
want
to
say
that
I
think
that
mike
has
probably
had
as.
S
S
S
S
T
T
For
the
improvements
to
the
site,
I'm
excited
for
updated
lighting.
Franklin
said
for
more.
F
Well,
I'd
just
like
to
say
that
just
sticking
to.
F
F
F
F
F
F
Drive
through
for
your
bagel
kind
of
thing,
there's
no,
no,
there's
no
drive
through.
F
For
the
neighborhood,
I
agree
about
the
lights
being
turned
off
a
half
an
hour.
After
closing,.
F
I
actually
think
maybe
some
of
the
polls-
I'm
not
an
engineer,
but
I
don't.
I
think
everything.
F
Neighborhood
in
terms
of
light
and
noise,
I'd
like
to
see
more
parking
spaces.
A
Be
presumably
other
things
being
consumed,
the
number
of
people
inside
the
restaurant.
A
A
A
H
H
As
far
as
the
site
plan
goes,
you
know
I
so
I
run
past
this
site
regularly.
In
fact,
this
morning.
H
H
H
Some
additional
parking
back
there
and
also
have
the
loading
as
well.
Unfortunately,
there.
H
H
Those
are
easements
for
the
butter
right
there,
so
that's
tight,
and
this
is
obviously
you
know.
We.
H
H
H
H
Large
tree
and
it
would
hate
to
see
it
go
so
by
by
moving
things
back
I,
with
the
retaining
wall.
H
H
For
the
site,
the
other
thing
as
far
as
traffic
moving
through
the
site
not
having
a.
H
H
Down
the
road
at
the
the
dunkin
donuts
with
people
queuing
and
that
sort
of
thing,
but
it.
H
The
drive-through
issues
won't
be
there
so
and
then,
just
briefly
on
the
contaminated
soils,
front.
H
H
B
B
A
H
And
I
forget
what
exactly
triggered
them
and
if
they're,
if
this
says
I
have
to
go
through
des.
H
They
would
likely
have
to
look
at
this,
but
there
are
certainly
stipulations
that.
H
H
Of
material
that
are
hauled
off,
the
site
have
to
get
tested
to
meet
the
different
soil,
s1.
A
It
was
very
isolated
under
the
old
tanks
and
I
guess
the
question
is:
is
there
testing
as
the.
A
A
The
ds
required
no
digging
whatsoever,
so
I
guess
if
we
just
said
in
accordance.
C
The
other
things
since
I
have
the
microphone
for
30
seconds.
This
is
good
timing,
because
the.
C
City
will
be
redoing
the
section
of
islington
street
we're
doing
very
technical
term
there,
but.
C
You
fall
within
the
window
of
work
that
will
take
place.
This
construction
season.
H
A
F
A
F
F
Heading
towards
9
pm
the
hours
of
operation
we're
talking
about
here
and
thank
you,
I'm
just
going.
F
F
F
Outside
area
and
the
the
businesses
that
are
being
compared
to
this
business
have
very
very.
H
And
mitigation
plan,
I
think
we
should
with
which
includes
addressing
possible.
H
Is
turned
off
30
minutes.
After
closing,
I.
E
E
E
R
I
know
it's
hard
again
for
the
record,
derek
durbin
on
behalf
of
the
applicant.
I.
R
Know
it's
hard
not
to
delve
into
the
outdoor
seating
issue,
given
the
fact
that
these.
R
R
R
R
R
They
never
they
never
actually
made
it
to
the
site
itself.
I
mean
they
were.
R
A
E
B
A
F
F
F
F
F
E
E
E
E
E
U
U
E
Go
to
any
restaurants
in
portsmouth
by
vehicle!
That's
a
mile
from
market
square.
A
A
Andrew
you
had
your
hand
up
more
of
a
comment
than
the
question
something
I've
been
toggling.
D
With
this,
entire
time
is
to
james
point,
we've
now
removed
the
bagel
shop
identity
and
as
much.
D
D
D
A
Thank
you
yes,
joe
chairman,
if
I
could
I,
I
do
believe
that
it's
a
balance,
a
lot
of
a
lot
of
the.
M
M
Very
community
oriented
meeting
spaces,
I'm
speaking
of
you
know
the
list
that's
been
put.
M
Before
us,
I'm
in
the
kitchen
cafe
clean
they,
they
have
zero
parking
spaces,
and
I
know
that.
M
Being
someone
that
frequents
them
a
lot
myself,
I
mean
I
live
downtown.
I
I
too,
I
I
when
I
first.
M
F
A
A
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
V
V
A
Anybody
on
zoom
anyone
on
zoom
like
to
comment,
raise
your
hand.
A
P
On
the
little
list
that
I
gave
you
that
there
there
are
there's
information.
A
Now
we
have
somebody
on
zoom
yeah,
joe
adler,.
H
F
F
F
F
F
F
H
It's
it's
a.
I
certainly
see
a
lot
of
the
the
points
being
made
on
both
sides.
H
The
additions
you
just
you
won't
be
able
to
get
the
traffic
flow
or
anything
else,
and
it's.
H
On
the
two
spaces
on
cabot
street,
there
is
a
sign
there
that
says
no
parking
from
here
to.
H
H
Also,
looking
at
you
know,
I
guess,
for
starters,
just
kind
of
looking
at
the
the
master
plan.
H
And
it
does
kind
of
it
does
call
for
balance.
You
do
have
to
balance
the
parking,
but
also
the.
H
H
Third
is
green:
the
remaining
is
to
actually
get
the
cars
through
the
site.
So
to
me,
it's
it's.
H
Development,
but
that's
that's
something
to
discuss
in
the
future.
The
master
plan
that
we're.
H
Working
with
now
calls
for
the
balance,
and
I
think
we
see
that
the
other
thing
just
to
kind.
H
Of
go
on
the
comment
about
you
know,
folks,
out
of
town
not
being
able
to
walk
or
bike
or.
H
Have
to
cross
through
the
bartlett
intersection,
there
is
a
current
sidewalk
there,
along
with.
H
At
least
I
I
believe
so
when
the
everything
is
fully
built
out
through
there,
but
I
think.
H
Know,
traffic
issues
with
those
coming
and
going
in
the
mobile
station
down
the
road
and
such
but.
H
I
don't
think
I
think
the
balance
is
there
in
aligns
with
the
master
plan.
Thank
you.
B
B
B
B
B
Hope
they're
successful
in
doing
so
because
I
will
hear
about
it,
I
live
just
a
few
blocks
away.
B
B
B
Cause
the
parking
issue
that
long-term
parkers
cause
issues.
So
that
is
my
added
to
the
comments.
F
F
F
U
U
For
for
bicycling-
and
you
know,
unless
there's
snow
on
the
ground
anyways-
maybe
there's
some
type.
U
Of
compromise
to
exchange
some
of
that
outdoor
seating
for
a
parking
spot
or
two
to
increase.
U
M
M
M
M
A
A
A
A
But
I
am
concerned
about
employees
in
the
owner's
parking.
That's
my.
A
My
biggest
concern
with
respect
to
parking:
could
you
squeeze
more
parking
there?
You
could.
A
It's
a
balance,
it's
you
know
it's,
but
it's
also
not
a
suburban
location
and
I
I'd
hate
to
see
it.
A
D
H
In
there,
because
they
were
able
to
get
rid
of
one
or
two
was
it
just
one?
Looking
to
the
cities,
I.
L
H
H
Particularly
in
the
winter
months,
because
you're
not
going
to
have
mopeds
there
in
the
winter
and
it's
going
to
be
dead
space
in
the
winter.
So
is
there
any
reason
that
would
take
care.
H
H
It's
getting
in
and
out
of
there
is
going
to
be
tricky,
but
well
we
just.
A
I
I
mentioned
it
because
I
think
it's
it's
good
the
way
they
did
it.
I
think
it's
it's
a
good.
It's.
D
D
A
Have
a
second
we've
talked
about
possible
changes.
Employee
parking
has
come
up
the.
M
That
could
be
taken
advantage
of
here
as
well.
For
correct,
I
mean
the
foundry
right
yeah,
it's
a.
M
H
H
H
A
Was
that
I
guess
that
would
be
a
stipulation
added
to
the
added
to
the
motion.
U
R
Of
the
applicant,
there
is
the
application
before
you
for
conditional
use
permit
for
the.
R
Outdoor
seating,
the
outdoor
seating
is
the
brown
shaded
area
on
the
plan.
The
outdoor
seating.
R
R
Designed
to
to
draw
people
locally
in
from
the
neighborhood,
the
other
purpose
behind
it.
R
R
R
R
R
R
I
know
the
numbers
have
been
like
between
40
and
43.
There.
R
R
R
R
R
R
R
R
H
Yes,
so
how
much
of
the
roof,
so
it
looks
like
you're
keeping
the
canopy.
O
Hello
again,
robert
wedemeyer,
with
winterholden
yeah.
Basically
the
canopy,
as
is,
is
supported
at.
O
The
building
and
then
has
four
columns
along
the
what
used
to
be
where
the
pumps
were.
O
And
then
the
bay
to
the
east
side
also
the
idea
being
first
off
just
to.
H
H
Seating
is
that
it's
it's
part
of
outdoor
seating,
again,
the
idea
being
that
being
seasonal,
we're.
H
M
A
Yesterday,
yeah,
is
it
possible
to
provide
some
of
your
quote
robust
landscaping.
O
So
as
direct,
I
guess
to
your
question
about
under
the
canopy,
as
you
can
see,
we
have
if
we
go
from.
O
Towards
the
main
entrance,
that's
got
biking
or
bike
parking
on
either
side,
and
then
you
can
see.
O
O
O
Beyond
that,
we
have
in
the
limited
areas
of
greenery
that
we
were
able
to
get
onto
this
site.
O
O
That
very
mature
maple
into
the
back
area
and
then
referencing
our
previous
discussions
of.
O
To
balance
on
this
so
but
since
we've
already
discussed
the
possibility,
which
has
been
rejected.
F
O
O
E
E
Corey,
you
had
a
question
just
curious
and
I
apologize
if,
if
this
has
already
been
presented,.
H
But
when
you
guys
went
through
all
the
other
various
boards
and
and
commissions
and.
H
H
Was
it
pushed
by
you
know,
zoning
or
other
groups,
or
anything
like
that?
I
know
I
mean.
O
That's
that's
mainly
a
design
choice.
Okay
and
again
I
mean,
I
think,
we
kind
of
touched
on.
O
Sort
of
the
history
of
it
it
was
a
service
station,
so
we
want
people
to
look
at
it
and
sell
that.
O
R
I
I
think
that,
had
there
been
an
impact
impact
associated
with
the
prior
use,
the
rap
shack,
which.
R
Actually,
where
the
vehicle
sat
itself,
probably
a
slightly
greater
area
there,
weren't
weren't.
R
Any
at
least
cited
to
complaints
by
neighbors
we're
actually
adding
plantings
and
other.
R
Mute
a
lot
of
the
noise
across
where
this
site
is
projecting
onto
other
properties,
so.
R
R
Is
out
of
balance
or
is
detrimental
in
a
unreasonable
type
of
way?
I
would
say:
no,
it's
not.
P
P
P
P
P
P
P
P
P
P
P
P
P
M
H
So,
just
speaking
on
this,
I
at
first
you
know
kind
of
threw
me
for
a
loop,
a
little.
H
Bit,
I
didn't
realize
just
how
much
they
were.
I
guess
include
how
much
green
space.
H
It's
pretty
impressive
in
the
fact,
also
that
over
more
than
half
of
it
is
going
to
be
open.
So.
H
People
are
going
to
be
kind
of
moved
into
that
one
corner
that
is
covered,
but
so
and
it's.
H
A
F
F
A
B
Think,
since
some
of
the
neighboring,
two
of
the
neighboring
places
have
8
p.m,
and
I
I
think.
A
H
One
stipulation
that
the
outdoor
use
shall
not
extend
beyond
8
pm
just
just
to
keep
it.
H
H
D
D
D
D
D
Is
going
to
be
directly
incorporated
into
this
next
iteration
of
plans?
So
that's
really.
D
D
So
if
there
is
in
fact
neighboring
noise
and
disruption
caused
by
this
business,
we
can
bet.
D
That
we'll
hear
it-
and
you
know
that'll,
be
the
front
page
of
the
headline
like
you
can
see
it
now.
D
And
so
with
opening
your
new
business
whatever
it
may
be,
I
think
that
you'll
find
respecting.
D
D
Respecting
a
lot
of
those
people
and
I'm
really
excited
for
the
overall
project
itself,
so
really.
D
A
A
A
A
A
A
F
I
would
like
to
make
a
motion.
However,
you
do
that
for
the
chair
to
specify
an
advisory
committee.
F
F
F
N
So
that
was
that
was
the
most
that
could
it
could
be
a
motion.
I'm
sorry,
I'm
gonna
do
something.
A
A
A
A
A
A
little
bit
before
you
were
this
morning,
so
I'm
a
little
tired
too.
It
may
not
be
100
of
my
game.
A
F
F
A
A
A
I
Whether
that
had
come
in
yet
it
has
not,
I
can
follow
up
with
them.
Okay,
great.
I
And
then
I
also
understand
that
the
lonza
expansion
was
approved
by
the
pda
in
january.
L
I
think
there
were
minor
amendments
that
they
they
went
through.
The
pda.
L
And
had
approved
by
their
board,
I
think
if
they
make
additional
changes,
they'll
they're.
L
That
will
include
that
information.
Okay,
we'll
include
whether
this
board
will
see.
I
We
saw
the
we
saw
alonso's
lunchroom
in
the
summer,
and
we
haven't
seen
the
big
one
here.