►
From YouTube: 10.4.2022 Technical Advisory Committee
Description
10.4.2022 Technical Advisory Committee
A
All
right
I'll
note:
we
have
a
couple
postponements,
375.
A
A
Good
afternoon,
thanks
peter
neil
hansen
and
patrick
kermans
with
time
bond.
B
B
Be
the
radius,
I
think,
okay,
that's
that's
kind
of
what
we
were
thinking.
Okay,
so
if
that's.
B
If
that's
what's
being
asked,
then
yes,
we
can.
We
can
do
that
and
I
did
take
a
quick
look.
B
B
Side
of
the
buildings,
so
we
don't,
we
don't
have
an
issue
doing
that.
Our
intention
of
having
it.
B
Buildings,
so
we
would
be
fine
with
with
putting
in
a
couple
speed,
bumps
kind
of
looking
at
the.
B
Plan
we'd
think
that
we'd
put
one
behind
building
one
just
before
the
muse
to
slow
cars.
B
Down
prior
to
where
those
pedestrians
would
be
coming
out
from
between
the
buildings
and
then.
B
Maplewood
and
looking
at
the
plans,
it
wasn't
clearly
identified,
so
we
will
make.
B
Sure
that
we
we
make
sure
that's
that's
much
clearer,
moving
forward,
that
that
is
the
intent.
B
B
At
this
prior
to
resubmitting
and
peter,
would
you
mind
going
to
the
utilities
plan.
B
So
there's
a
couple
of
construction
issues
that
we
see
with
with
doing
this,
and
I
think,
if.
B
Just
go
back
to
the
single
crosswalk
that
we
had
initially
had
on
our
plans
during
tac.
B
B
Issues
that
we
think
we're
going
to
run
into
with
trying
to
raise
this
so
on
the
on
the.
B
Poor
walk
side
of
deer
street,
there
is
a
the
gas
main
runs,
pretty
close
to
the
curb
line
and.
C
C
C
C
Looking
after
it,
as
far
as
I
recall,
I
don't
know
anything
about
the
gas
line,
conflict.
C
C
C
B
B
You
with
six
feet
so
that's
as
steep
as
a
typical
pedestrian
ada
ramp,
which
is
a
steeper
traffic.
C
C
D
D
E
B
And
all
right,
so
six
parking
spot
closest
to
crossing
a
port
walk
place
will
need
to
be.
B
Removed
due
to
the
proximity
with
the
crossing-
that's
that's
fine.
We
can
remove
that
limo
parking.
B
B
For
their
use,
which
is
why
we've
left
it
there,
turning
templates
still
needed
for
turns.
B
So
maplewood
onto
deer,
the
first
is
the
first
page.
It
shows
the
existing
and
the
proposed.
B
Condition
so
they
they
both
are
very
similar.
Where
that
that
trailer
does
does
encroach
on.
B
B
We
want
to
look
to
make
some
sort
of
adjustment
to
improve
that.
I
think
we
do
have
a
little
bit
of.
B
B
Widen
that
outbound
lane
to
make
that
turn
work,
and
it
would
just
be
a
small
adjustment.
B
A
little
bit
more
from
there,
but
we
can
make
it
work
if,
if
that's
the
the
direction
that.
B
B
B
Likely
going
to
use
market
street
from
from
95,
so
I
think
it'd
be
a
pretty
limited.
H
Do
we
have
this
turn
on
a
template
for
the
fire
truck?
No,
we
only
did
the
turning
on
and
off
the.
B
H
H
H
H
D
B
So
on
in
the
next
one,
are
we
good
on
that
then?
Okay,
so
corner
building,
one.
B
Is
in
city
sewer,
easement
real
line
sewer
main
into
maplewood
under
the.
B
In
maplewood,
so
what
we
would
propose
would
be
to
be
we're
already
giving
a
fair
share
for.
B
B
G
B
B
B
B
B
B
B
C
Okay,
I
know,
because
I
was
told
that
they
were
opposed
to
offense
if
they're
opposed
to.
B
Okay,
that
was
the
last
thank
you
open
up
for
attack
for
questions
or
comments
to
the
applicants.
J
Can
I
just
ask
one
question
for
that
number
13:
would
you
mind
putting
that
as
a
note
on
the.
J
L
Good
afternoon
elizabeth
we're
out
of
property
owner
159
mcdonough
street.
I
sent
you
a
very.
L
L
L
L
L
L
L
L
L
L
L
Things
is
going
to
be
helpful.
I
think
that
people
are
going
to
walk
down
the
middle
or.
L
L
L
L
Should
be
on
that
far
side,
and
I
don't
think
it
should
be
marked
with
colored
stones.
I
think.
L
L
Don't
think
that
would
be
helpful
just
to
say
to
mark
out
the
crosswalk
for
things.
I
think
you.
L
L
L
L
L
L
A
big
old
deck
and
I
didn't
see
any
easements
for
the
community
space.
I
think
those
are
required.
L
C
C
Hanover
street:
that's
why
we're
talking
quite
differently
about
a
raised
crosswalk.
C
C
The
fire
truck
in
addition,
so
we
can
look
at
both
the
the
lori
here
and
the
the
ladder
truck
and.
C
Third
plus
third,
whatever
discussion
needs
to
take
place,
if
any
on.
What
I
think
I
recall
was
a.
C
C
C
C
K
K
C
B
B
One
to
make
that
decision,
but
there's
a
look
at
that
in
a
site
visit.
That's
a
good
suggestion.
A
All
right,
as
I
mentioned,
item
d
and
e
for
212
woodbury
there
they
requested
to
postpone
so.
A
A
With
associated
73.3
foot
road
extension
as
follows:
proposed
lot,
one
with
eleven
thousand.
A
A
Good
afternoon
peter
chris
mulligan
for
the
applicants,
I've
got
jeff
collins
here
to
my
left.
M
M
What
we're
doing
a
couple
of
weeks
ago,
brenda
prepared
a
comprehensive
response
to
what
were.
M
M
M
Submission
which
we
think
are
very
minor.
The
first
comment
has
to
do
with
a
drainage
pipe
being.
M
M
M
M
G
K
M
Is
the
easement
plan?
Thank
you
and
I've
spoken
with
trevor
and
I'm
sure
this
is
not
news
to.
M
You
but
he'll
put
this
on
the
agenda
for
the
city
council
to
accept
the
easements.
K
K
That
to
the
city,
I
guess
well
actually
there's
one
of
each
so
the
turnaround
easement.
M
Will
benefit
the
city,
so
that
will
be
from
the
collins's
to
the
city
for
the
purposes
that.
M
M
City
will
want
that
to
be
a
license
and
not
an
easement.
So
if,
in
the
future
it
needs
to
be
moved.
K
K
C
G
G
Yeah,
so
we
talked
about
having
a
riser
pipe
for
both
of
them
and
well
they
we
have
an
orifice
in
the.
F
E
F
F
F
F
F
G
G
So
then,
my
comment
would
be
that
rain
garden,
detail
details
and
the
plant
view.
J
J
J
Prior
to
recreation,
right,
beverly,
yeah
and
we'll
just
put
a
note
in
there.
Okay,
we
always.
K
K
Moving
a
little
quicker
that
seamless
and
then
the
proposed
principal
structures
will
be
located.
J
G
K
K
K
Here,
including
the
runoff
that
has
to
be
directed
away
from
the
houses
and
some
of
the.
C
K
A
A
A
A
M
With
me
to
my
left
is
john
shagnan,
the
project
engineer.
We
john
just
passed
out
an
updated
plan.
M
O
O
O
O
O
O
O
O
O
The
fee
is
now
vested
in
the
lot
so
we're
showing
that
on
this
plan
and
we're
certainly.
O
Please
provide
a
easement
plan
and
table
with
unique
identifiers,
so
my
two
easements,
like.
K
I
I
Yeah
who's
who's
holding
these
sure
so
yeah,
the
applicant
has
lived
there,
life
or
since.
O
His
father
built
the
house
and
so
in
the
house,
you're
gonna
tear
down
yes
yeah.
It
was.
O
Or
is
it
a
covenant,
you
could
say
that
it's
a
restriction
on
future
development,
so
it
sounds.
I
C
O
M
But
you
know
either
way
would
work.
I
mean
we
could
grant
an
easement
to.
I
Have
to
they
have
counselor
would
have
to
accept
it.
Ultimately,
if
not,
you
know
the
idea
of.
C
O
K
Friends.
Okay,
so
then
the
next
comment
was
no
new
water
main
use
existing
two
inch.
O
O
O
O
O
O
O
O
And
then
the
there
is
a
according
to
city
records.
There.
P
Give
us
a
question
about
the
destructive
covenant
outside
of
my
wheelhouse
for
sure,
but
so.
P
P
That
what
you
typically
well,
no,
I
mean
if
we
weren't
granting
an
easement
for
the
benefit
of.
P
I
O
P
C
C
E
K
C
I
G
G
O
And
there
still
is
a
communication
line
that
is
mid-span
oysters,
hopefully
they'll.
E
Sorry,
I
don't
see
so
I
I
was
just
curious
to
if
you
could
just
state
your
name
answer.
P
Oh
laurel
sanborn,
you
know
in
these
lots,
are
they
cleared
already
or
is
it
woodland.
P
P
O
P
Yeah,
because
I
I
just
didn't,
know
how
big
the
lots
were
and
how.
How
much
of
the.
O
E
Spinnaker,
civic
center
or
workout
center
and
I
think
the
questions
are
being
asked
and.
E
In
part,
on
the
benefit
of
the
turkeys
that
that
mate
behind
behind
this
property.
E
E
In
relation
to
the
front,
half
of
the
property
is
being
cleared
for
the
development.
That's
on.
C
H
E
N
Hi,
so
my
name
is
matthew:
doherty,
I'm
the
a
butter
on
birch.
Although
my
address.
N
Is
really
tier
hardware,
so
do
you
did
you
understand
like
do
you
know
where
the
property.
N
Line
is
okay
because
I'm
obviously
intimately
familiar
with
the
property.
So
my
questions.
N
And
I
apologize
if
you
already
went
over
this,
I
just
found
out
about
this.
The
meeting
was
going.
N
On
now
is
with
regards
to
the
street
placement,
because
my
house
is
grandfathered
in
and
it's.
N
Line
it
goes
into
the
street
it's
here,
so
I
just
wanted
to
find
out
kind
of
what
was.
N
But
so
I'm
wondering
just
like
kind
of
what's
going
to
happen
with
this.
Okay,
if
anything
so.
O
If
I
can
sure,
if
you
go
to
sheet
three
three,
the
intention
is
to
replace
birch
tree.
O
O
O
O
That
corner
in
we're
defining
you
a
driveway,
okay
and
that's
the
plan,
and
you
can
see
that.
O
O
N
N
O
Ran
a
line
right
on
the
your
house
side
of
the
tree,
the
new
line,
or
is
it
on?
It-
must
be
on.
N
So
here's
the
property
line
and
here's
the
you
can
see
the
existing
road
there's
this.
This.
N
N
C
G
We
did
that
last
time.
Third
time's
a
charm
so
not
to
beat
the
addressing
dead
horse
too
much,
but.
O
H
Mr
doherty
yeah
yeah
his
address
is
that
it's
to
get
away
from
this
having
houses
on
one
street.
H
E
The
driveway
for
a
lot
218
5-2,
I
think
that's
going
to
be
cutting
into
the
sidewalker.
M
The
sidewalk
to
you
have
to
do
without
it,
maybe
not
over
the
way.
F
Something
about
not
disturbing
kearsage
as
little
as
possible
to
put
the
tip
downs
in
yeah.
O
K
J
Everything
articulated
on
your
letter,
as
well
as
something
articulating
the
process
for.
J
The
restrictive
covenant,
yep
and
then
dave
you
had
one
more
item
to
add
regarding
an
angle
point.
K
E
A
M
So
good
afternoon,
peter
chris
mulligan
again
from
bozen
associates
for
the
applicant.
M
Mchenry
architects
also
with
us,
is
richard
dejardin
from
mchenry
and
do
we
have
alex.
M
Is
hopefully
in
route,
so
the
proposal
here
is
to
convert
the
existing
structure
into.
M
That
program,
but
change
the
internal
layout,
so
we
went
through
the
the
fair
amount
of
the.
M
M
Were
I
didn't
get
any
plans?
No,
I'm
sorry.
We
didn't.
Oh,
we
didn't
circulate
the
plans.
Okay,
so
alex.
M
M
Needed
to
support
the
plans
as
proposed,
so
what
we
had
proposed
in
the
floor
plans
that
you
have.
M
M
M
On
the
plan-
and
I
again
I
apologize
that
we
didn't
submit
new
plans,
but
the
corrected.
F
E
M
E
Court
in
case,
maybe
it
is
so
the
I
don't
doubt
you.
G
G
J
Upsizing
the
water
line-
yes,
they'll-
have
to
draw
that
on
the
plan.
Okay,
yeah.
I
I
I
I
H
H
For
the
upstairs
units,
a
single
exit
yeah,
I
haven't
seen
anything
to
address
those
concerns.
F
H
Yeah-
and
I
thought
it
was-
we
were
allowed
one
I
mean
I
don't
even
write
down
the
reference.
F
E
J
A
I
think
that
there's
anyone
here
or
on
zoom
yeah
is
there
anyone
from
the
public.
J
J
Office
and
keep
the
residential
portion
under
500
square
feet,
the
coverage
percentages
need
to.
J
Be
updated
on
the
plan,
looks
like
that's
been
done
with
the
updated
plan
hasn't
been
submitted.
J
Yet
addressing
the
utility
poll
next
to
the
parking,
sewer,
lateral
relocation
and
changes.
E
I
also
have
that
construction
as
they
provide
the
sweeps,
instead
of
moving
the
connection
that.