From YouTube: 2.8.2022 Technical Advisory Committee
Description
2.8.2022 Technical Advisory Committee
A
All
right,
all
right,
so
yup
thanks
for
having
me
my
name
is
jamie
mccarty,
I'm
the
gis.
B
Coordinator
manager
for
the
city,
I
also
do
a
lot
of
work
on
the
ms4
stormwater
permit.
We're.
B
Now,
entering
into
our
fourth
year
of
that
permit
and
for
last
year's
requirements,
we
had
to.
B
Implement
some
enhanced
stormwater
regulations,
and
so
we
worked
with
the
planning
department.
B
Planning
board
to
amend
the
site,
review
regulations
and
you
can
go
to
the
next.
B
Slide
but
all
this
is
part
of
an
initiative
that
we're
kind
of
marketing
through
the.
B
City
is
think
blue,
so
this
is
all
you
know
we're
trying
to
coordinate
environmental.
B
And
sustainability
actions
throughout
the
city
for
water,
waste,
water
and
storm
water,
so.
B
Right
so
next
slide
some
of
the
resources
that
we
have,
that
you
guys
will
want
to
check
out.
B
It's
called
ptap,
it's
going
to
be
a
lot
of
the
same
stuff
that
you'll
see
in
this
presentation.
B
Planning
board,
we
presented
recommendations
based
on
the
requirements
of
the
ms4
permit.
B
B
B
The
first
item
that
I'll
talk
about
is
the
what
we
refer
to
as
the
land
use
development
tracking.
B
Form
from
now
on
I'll,
just
call
it
ptap
ptap
stands
for
pollution
tracking
accounting
program.
B
Tracking
application,
that
is,
tracking
land
use
and
the
implementation
of
stormwater
bmps
and.
B
How
much
change
and
impervious
surface
there
is
in
these
developments
that
are
going
in.
B
So
this
for
this
form,
was
developed,
so
the
actual
regulation
that
we
put
in
is
that.
B
Program
is
successful,
it'll
all
be
tracked
through
this
ptap
system.
Other
towns,
exeter,
durham,.
B
B
B
Is
is
a
combination
of
unh
stormwater
center
and
a
des
representative,
when
you
guys
set
up
a.
B
It's
it's
not
automated.
It's
an
e,
you
know
it's
an
email
that
gets
generated
and
sent
to.
B
Review
projects,
but
we're
really
looking
for
the
ones
that
are
having
a
disturbance,
if
you,
if.
B
B
So
next
slide
the
and
so
the
on
that
city's
website.
There
is
a
hour
and
a
half
presentation.
B
That
des
and
myself
and
some
other
people
put
together
in
this
room
here
for.
B
B
The
surfaces
like
sweeping
a
parking
lots
that
can
be
put
in
there
also
the
change
in
land.
B
You
know
what
the
acreages
are
of
that
and
then
the
wastewater
is,
you
know
if
it's
going.
B
B
This
is
the
one
off
of
beverly
hill
road.
That's
been
in
review
right
now,
so.
B
In
the
ptap
application,
so
in
that
top
chart
table
there,
each
one
of
those
lines
is
one
of
the.
B
B
Cleaning,
I
think
that's
what
it
says
and
then
and
then
that
last
con
table
is
the
land
use.
B
B
Make
sure
that
your
that
new
site
plans
are
adhering
to
our
enhanced.
B
B
Post
construction
impervious
area
and
then
redevelopment,
if
you're
not
touching
the
existing.
B
Redevelopment
any
existing
parcel
yeah
30
percent
of
the
existing
impervious
cover.
B
B
B
These
bmps
so
you'll
this
is
that
same
project
that
bottom
chart
there
you'll
see
says.
B
For
each
one
of
the
different
bmps
that
were
listed
you're,
you
know
we're.
B
Getting
100
tss
removal
and
generally
80
nitrogen
and
phosphorus
removal
for.
B
B
B
B
But
just
so
you
guys
know
the
city's
using
it
it's
for
their
own
internal
uses.
We
have
to
track.
B
How
much
and
and
required,
to
try
and
reduce
the
amount
of
nitrogen
that
the
city
is
discharging.
B
And
they
can
fill
it
out
themselves
and
submit
it,
and
you
know,
but
all
those
there's
no
new.
B
Of
these
bmps-
and
this
will
just
be
a
way
for
us
to
follow
through
with.
B
A
The
second
item
on
the
agenda
is
70
court
street
who's.
Here
for
that
application.
D
Good
afternoon
chris
mulligan
representing
the
applicant,
I
also
have
with
me
eric
sorry.
D
From
altus
engineer
engineering,
the
project
engineers
on
this
project.
D
D
But
that's
still
short
and
leaves
us
with
a
deficit
of
six,
so
we
will
be
filing.
D
Property
that
is
adjacent
to
two
other
properties:
that
kind
of
connect
to
each
other
and
act
as
a.
D
D
D
D
D
I
think
so
any
questions
from
tech
members.
E
E
G
It
states
the
plan
set
is
intended
to
defeat
the
redevelopment
for
restaurant
use.
That.
A
Familiar
with
the
site
or
the
building,
but
do
you
have
where
it's
a
change
of
use.
A
C
Where
will
they,
I
guess
the
biggest
concern
is
where
they're
going
to
park
in
the
winter.
C
On
the
street,
well
so
again,
we
we
have
an
opportunity
to
utilize
a
shared
parking.
D
Arrangement
with
property,
that's
owned
by
the
same
same
owners
in
a
short
distance
away
or.
D
We
could
you
know
there.
Obviously,
there
are
a
number
of
public.
D
This
property,
so
it's
probably
going
to
be
a
combination
of
those
two.
You
know
we
expect.
D
Because
of
its
location
downtown
that
guests
in
this
type
of
facility,
it's
gonna
be
kind
of.
D
D
Of
town,
so
you
know,
we
would
expect
that
the
type
of
clientele
we're
going
to
see
are
going
to.
C
Gonna
take
well,
you
know,
I
guess
that's
kind
of
what
we
would
like
a
little
input
from.
D
You
know
this
body
if,
if
you
can
give
it,
you
know
we're
certainly
committed
to.
D
H
Not
needing
shared
parking
to
make
it
work.
I
think
that
I'm
not
the
parking
expert.
H
H
H
H
D
D
In
moving
forward
with
this,
the
in
order
to
obtain
a
conditional
use
permit
the
ordinance.
D
Requires
that
we
produce
a
parking
demand,
analysis
and
you
know
for
a
project
of
this
size,
it.
D
Engineered
study
you
know
is:
is
that
typically
acceptable
or
you
know,
are
you
expecting?
Will.
D
C
C
Think
and
maybe
yeah
I
agree.
Okay,
maybe
include
description
of
available
parking
in
there
because.
A
E
A
And
you
are
proposing
caretaker
residents
as
part
of
part
of
this
inn
right
yep.
So
for
that.
A
D
H
F
H
H
H
A
F
A
Or
is
it
simply,
accessibility,
yeah
and
you'll
have
to
have
your
designer
provide
that.
H
H
H
G
One
number
82
and
are
there
easements
for
travel
across
the
two
properties.
D
That
own
point
and
walder
next
door,
so
you
know
they've
got
an
ocean
of
asphalt
back
there.
D
F
I
think
there's
a
few
handicap
spaces,
but
behind
82,
maybe
we
could
put
them
in.
F
D
Amazement
for
that
we
had
actually
thought
you
know.
We
had
bounced
a
couple
of
ideas
around.
D
E
H
F
H
F
H
H
D
I
think
I
can
explain
the
discrepancy
there.
The
way
I've
calculated
it
is
that
we
need.
D
D
We're
going
to
have
the
most
control
over
so
that's
kind
of
the
least
of
our
problems.
A
All
right,
next
on
the
agenda,
we
have
200
230
commerce
way.
I
Good
afternoon,
everyone,
neil
hansen
with
tyne
bonds,.
I
So
project
we're
looking
at
is
at
230
commerce
way.
The
existing
parcel
has
the
three-story.
I
I
Impact
as
you
can
see
from
this,
the
existing
or
the
existing
conditions
plan
anyway,
the
existing.
I
Parking
paved
area
is,
is
already
impacting
the
the
hundred
foot
underfoot
100
foot
welton
buffer.
I
I
I
I
I
I
mean
something:
something's
gonna
fill
that
space,
so
it's
kind
of
hard
to
know
exactly.
I
What
what
would
go
there,
but
either
way
it's
it's
pretty
pretty
low
change
in
traffic.
I
I
As
far
as
I
know,
there
is
none
for
that
rear
parking
lot.
Is
it
all
sheep
flow
or
is
it.
C
I
C
C
C
I
Any
sort
of
sort
of
green
bmp,
as
opposed
to
what
we're
just
showing
is.
I
Obviously,
very
conceptual
beacon
of
green
bmps,
the
salt
storage
on
the
site
in.
C
Yes,
can
you
take
a
look
at
that
when
you
bring
the
application
in
yeah,
make
sure
it
meets
our.
E
Fire
suppression
system
going
in,
I
assume
yeah
I
would
assume
so,
but
that
would
be
up
to
the.
I
I
I
Be
something
architect
would
have
to
look
at
and
then
the
access
around
the
side
and
the
rear.
E
It
may
be
affected
whether
or
not
there's
a
fire
suppression
system
in
there.
Okay,.
H
C
C
And
then
there's
some
pretty
narrow,
slivers
you
got
on
here
just
make
sure
your
delineation.
C
Is
up
to
date?
Yes,
that
is
so,
and
I
I
didn't
mention,
but
we
are
going
to
be
a
conservation.
I
Commission
tomorrow
for
work
session,
yeah
and
we
do
have
go
of
environmental-
is
going
to
be.
I
J
Easy
other
comments,
david
couple
things
so
when
the
city
rebuilt
commerce
way.
J
J
Between
these
two
buildings,
the
proposed
and
the
existing,
so
we're
probably
going
to
task
you.
J
J
Thanks
dave
you're
welcome
the
electrical
that
you're
showing
is
coming
off
of
a
little
tiny.
J
C
J
And
last,
but
certainly
not
least,
she's
gonna
request
that
you
build
a
sidewalk
on
market
street.
J
A
E
L
We
were
asked
to
submit
you
said
over
the
tac
website.
We
originally
submitted
through.
L
H
H
C
L
L
And
bernie
lee
of
severino
construction
again
we're
here
for
325
little
harbor
road
where's,
a.
L
Residential
property,
it
is
a
private
island,
it's
also
known
as
lady
isle
or
belle
isle.
L
I
think
it's
beneficial
that
we
hear
input
from
the
city
as
well.
Bernie's
actually
doing
the.
L
C
And
it's
a
whole
new
sewer
service
for
the
streets
really.
So
let
me
see
if
I
can
get
this
to.
L
I
L
L
House
is,
and
then
also
to
the
north
there's
an
overhead
utility
line
that
connects
from
pleasant.
L
Via
the
belle
isle
road
right
there-
and
that
is,
if
you
go
to
the
next
page,.
L
L
L
L
Next
to
that,
if
we
can
go
back
to
the
page
before
we
have
sewer,
so
we're
going
to
be
doing.
L
You
can't,
you
might
not
be
able
to
see
it
here.
We
have
a
sewer
gravity,
that's
going
to
come.
L
L
We're
gonna
do
electric
we'll
do
four
conduits,
two
four,
just
plain
old
electric
two
for.
L
Communications
and
that's
gonna
connect
just
across
the
way
at
a
utility
pole,
underground.
L
So
that's
the
gist
of
the
utilities
where
there's
an
existing
driveway.
K
Stopped
that
was
there's
the
depth
of
the
mud
was
was
not
enough.
We
had
to
bury
those
utilities.
M
J
L
L
J
The
we
have
other
means
that
are
just
as
long
with
force
mains
and
you
just.
J
J
K
J
J
J
G
M
M
M
K
K
We
do
have
plenty
of
vegetation
left
over.
You
know
that
we
wouldn't
be
impairing
the.
K
K
M
M
M
Lane
that
we're
in
we
wouldn't
want
the
lane
we
want
the
we
want
it
just
like
it
is.
K
K
M
M
M
A
Will
there
be
how
many
structures
are
out
there?
Seven,
I
think
one,
two
three,
two
residential.
K
The
rest
are
barns
or
garages
there'll
be
a
oh,
they
won't
be
living
at
the
same.
G
K
K
L
E
E
E
K
And
that's
all
I've
heard
so
far:
oh
repeating
yeah
repaving
of
little
harbor
road
ready
to
go
so.