From YouTube: Development Review Committee 07-23-2021
Description
Development Review Committee 07-23-2021
A
C
All
right,
it's
nine
o'clock,
call
to
order
the
development
review
committee
meeting
for
july,
23
2021
we'll
do
the
roll
call
we'll
start
over
here
with
marty
and
just
go
around
state.
Your
name
and
department
you're
from.
C
All
right,
the
next
scheduled
meeting
is
august.
13
2021.
Are
there
any
citizen
comments
on
today's
agenda
items
only
not
seeing
any
so
we'll
ask
for
approval
the
minutes.
A
C
C
second,
are
wheel,
stops
proposed
for
all
parking
space
or
just
the
accessible
space.
Will
there
be
curbing
along
the
edge
of
the
parking
lot?
Please
refer
to
exhibit
a
code
requirements,
chapter
26,
article
10,
section,
10.3
parking
specifications
for
all
uses
except
single
family
and
two
family
dwelling
standard
curving
shall
be
provided
along.
The
periphery
of
all
driveways
parking
and
loading
areas.
C
Curb
and
gutter
shall
be
installed
redeemed,
necessary
by
the
public
works
director
within
all
street
parking
and
loading
areas
in
order
to
manage
storm
drainage,
channelize
traffic,
protect
buildings
and
landscaping
areas
and
separate
pedestrian
and
vehicular
circulation
areas.
There's
a
landscape
comment
that
the
landscape
plan
does
meet
the
city
code
police.
Do
you
have
any
comments?
No
comments,
fine.
A
I
have
a
couple:
would
the
applicant
please
approach
the
fence
early
yeah.
A
You
did
receive
the
comments
correct,
yes,
ma'am,
okay,
so
one
of
the
things
that
I
wanted
to
follow
up
with
you
when
you
do
your
plan
revisions
to
address
the
details
of
the
wheel,
stop
just
send
us
through
the
revised
plans,
okay,
and
we
did
request
that
any
root
barrier
be
incorporated
where
there's
planting
materials
next
to
sidewalks.
Okay,
we're
fine
with
the
stormwater
permitting
and
the
stormwater
plan
that
you
had
submitted.
So
we're
fine
with
that.
A
Okay,
perfect,
and
so
I
think,
once
you're
available
and
can
have
those
plans
revised
to
address
that
minimal
comment.
Please
make
arrangements
with
us
for
the
sign
off
sheet.
Okay,
and
we
can
schedule
that
time.
Perfect
sounds.
B
A
B
Thank
you,
brian
for
the
record.
I
will
give
you
your
sign
off
sheet.
You
will
need
to
physically
complete
this
bring
back
any
all
of
the
approvals
along
with
your
cads
up
to
the
third
floor
city
hall,
annex
urban
design.
At
that
point,
then,
we
will
be
able
to
approve
your
drc
at
that
time.
Okay,.
C
A
second
second,
okay,
we
have
motion
a
second
all,
those
in
favor
say
aye
aye
any
opposed.
I
just
have
it
all
right.
Next,
one
on
the
list
is
item
b
lashley
park
playground,
interactive,
fountain,
100
plans.
This
is
an
informational
drc
for
the
committee,
so
julie.
B
Julie,
ryan,
urban
design.
For
the
record,
this
is
the
100
plans
for
the
lashley
park.
Splash
pad.
This
is
re
configuring,
the
existing
interactive,
fountain
and
playground
area
to
include
two
different
splash
areas:
the
todd
area
and
the
5
to
12
area
as
well
as
we
will
be
installing
a
sedum
wall
that
you
see
outlined
we're
also
replacing
all
of
the
jets
and
fountain
in
the
original,
as
well
as
enclosing
the
tank.
B
That's
currently
out
there,
along
with
the
pump
infiltration
system,
I
do
have
a
detailed
of
what
the
new
equipment
will
look
like
in
there.
So
we
are
just
looking
for
a
technical
review
and
sign
off.
This
will
come
through
the
regular
building
permit
channels,
but
we're
looking
for
all
departments
to
sign
off.
So
we
can
finalize
all
of
the
comments
that
I
have
to
get
to
the
engineer
so
that
we
can
get
100
plans.
I
think
I've
heard
from
almost
everybody,
except
I
did
not
get
anything
from
utilities.
C
Okay,
thank
you.
All
right
next
is
unfinished
business.
There
isn't
any
any
staff
comments
or
committee
board
comments.
Do.
C
A
One
thing
I
would
like
to
comment
on
is
once
those
revisions
are
done,
of
course,
as
usual,
a
copy
of
the
plans.
Thank
you.
D
For
the
record
kathy
getz
district,
one
julie-
I
just
wanted
to
ask:
what
year
do
you
have
for
completion
2022.?
Sorry,.
B
D
B
To
get
the
plants
and
get
it
out
to
permitting
contracting
all
of
that
type
of
stuff
that
we
have
a
contractor
in
place
somewhere
around
the
november
december
and
then
we're
looking,
probably
four
to
six
months
for
construction.
Thank
you.
C
All
right,
if
there's
nothing
else,
that
we're
returning.