From YouTube: San Bruno City Council Meeting August 27, 2013 10e. College Water Pump Station Project
Description
San Bruno City Council Meeting August 27, 2013
10e. College Water Pump Station Project
A
B
Honorable
mayor
councilmembers,
the
sea
provides
drinking
water
to
city
residents
through
120
miles
of
water
pipes
and
also
through
eight
pump
stations
and
eight
water
tanks
to
ensure
long-term
sustainability
of
our
aging
system.
Our
water
system,
a
master
plan,
developed
strategic
priorities
for
the
replacement
of
a
critical
component
of
the
overall
system.
The
pump
stations
are
critical
component
of
the
system
reason.
Why
was
identified
in
our
master
plan
the
priority
to
replace
to
pump
stations
the
pump
stations,
the
maple
pump
station
and
college
pump
station
maple
pump
station
was
replaced
in
2009
college
pump.
B
You
can
see
how
the
existing
pump
station
looks
like
at
the
intersection
of
skyline,
Boulevard
and
college
drive
in
addition
to
the
need
of
replacement
of
the
pump
station
based
on
the
standard
changed
since
the
fifties
and
sixties.
The
capacity
of
the
pump
station
needs
to
be
increased
also
to
be
able
to
provide
within
a
flow,
including
including
fire
flow
to
that
neighborhood.
B
Careful
consideration
to
the
design
also
was
given
the
neighboring,
the
neighboring
environment,
including
in
the
design
or
heat
or
heat
actual
enhancement.
How
you
can
see
also
proper
lighting
voting
securities
sidewalk
landscape
around
including
sidewalk.
Alongside
the
new
facility,
the
design
was
previewed
also
to
make
sure
that
no
big
surprises
will.
B
Come
up
during
the
construction
of
this
project
and
the
department
went
out
for
bead.
In
june
of
this
year,
sex
beads
were
received,
the
lowest
bid
was
gmb
construction.
The
same
contractor
is
building
the
pastry
utility
for
the
grassman
neighborhood.
Also
they
are
the
subcontractor
for
the
great
separation
project
for
utilities
and
also
the
same
contractor
build
rollingwood
phase
3
for
before
in
the
city.
They
meet
the
qualification
needed
to
build
the
project,
and
the
city
was
pleased
with
their
prior
performance.
B
The
bead
is
2.4
million
for
the
project
slightly
lower
than
the
engineering
estimate
is
important
for
during
the
construction,
the
designer
who
was
brown
and
caldwell
to
provide
construction
support.
What
the
construction
support
really
adhere
to.
They
need
to
need
to
approve
the
submitters,
the
shop
Driving's
for
certain
mechanical
components,
electrical
components
of
the
project,
also
any
possible
change
which
will
come
up
during
the
construction.
B
They
need
to
coordinate
with
us
for
the
solution
for
those
changes
and
at
the
end
of
the
project
they
have
to
provide
the
city
with
as
hbu
Driving's,
based
on
all
of
the
details
included
in
the
project
during
construction.
This
project
is
very
technical
from
a
technical
point
of
view
is
very
complex
reason.
Why
is
important
to
have
a
specialized
the
inspection
available
for
the
construction
of
this
project
to
protect
the
investment
for
the
long
term
for
the
city
west
Yost
was
selected
was
the
best
film
to
provide
that
inspection
support
during
the
construction.
B
They
were
shortlisted
among
12
other
consultant
firm,
who
made
proposal
to
provide
construction
inspection
for
the
city,
but
Westeros
was
deemed
the
most
qualified
and
having
the
best
understanding
and
knowledge
of
our
overall
water
system.
The
cost
of
that
construction
inspection
during
the
construction
of
the
project
is
169
thousand-dollar.
B
With
this
contract,
the
total
construction
cost
will
be
three
point:
192
thousand-dollar
our
available
budget
in
our
CIP
budget.
At
this
present
time
is
two
million
nine
hundred.
Ninety
thousand,
you
say
201,000
funding
gap,
which
is
our
recommendation
to
be
closed
from
the
word
enterprise
fund.
If
you
will
support
the
recommendation
of
staff
to
tonight,
then
the
construction
will
start
in
a
few
weeks
and
based
on
our
expectations,
because
the
project
will
be
closed
out
by
the
end
of
next
year.
B
C
B
B
C
And
then
how
are
you
so
you
build
the
just
because
I'm
curious
you
build
the
pipes
to
the
old
pipes
and
then
stop
everything
and
reconnect
them,
and
so
you
built
you
build
a
new
pump
station.
You
build
the
new
pipes
under
the
street
to
the
old
pipes,
cut
off
the
old
pipes
and
reconnect
them
to
the
you.
B
Are
correct
again
yesterday
intend
to
build
a
new
station
and
then
to
basically
to
approve
the
connection
to
the
new
station
and
then
to
dig
a
decommissioned
existing
station.
Ok,
we'll
be
to
answer
your
specific
concern
will
be
no
disruption
to
the
neighborhood
all
as
part
of
the
construction
of
this
pump
station
right.
So.
D
Else
again,
I
really
like
the
idea
of
moving
it.
I
grew
up
in
that
area
and
I
think
it's
funny
not
funny,
but
it's
interesting
how
we
talk
about
earthquake
faults
and
everything,
and
here
this
little
wood
structure
has
withstood
everything
and
it's
been
there
for
in
excess
of
almost
60
years.
I
like
it
there
can
you
elaborate
as
to
where
in
vicinity
of
the
curb
it
is
I
mean
I,
know,
there's
a
lot
of
space.
D
E
The
site
where
we
are
positioning
the
new
station
is
within
city
right
away
and
its
proximity
to
the
existing
curb.
You
know
you
have
about
a
4-foot
sidewalk.
Then
we
have
about
a
two
foot
setback
to
the
face
of
the
building,
but
we
are
constrained
in
the
rear
of
the
building
because
of
Caltrans
right
away,
so
the
dimensions
that
I
guess
the
back
side
of
the
building
is
right
up
against
Caltrans
right
away,
so
we
squeezed
it
in
there
as
best
we
could
so.
F
Marty
Medina
garden
at
Garden,
Avenue
and
I'm,
just
I
used
to
be
the
inspector
in
December
and
I
work
with
will
at
the
last
pump
station
and
was
in
a
little
a
little
bit
of
math
on
the
inspection
services
and
I.
Understand
that
in
the
report
that
current
inspectors
don't
have
the
full
range
of
technical
skills
to
perform.
The
inspection
I
got
that
the
compaction
tests,
the
rebar
inspection,
the
concrete
tests,
those
are
all
specialized
inspection.
F
I
was
tasked
to
buying
some
subcontractors
inspectors
to
do
the
compaction
to
the
rebar
inspection
to
do
the
concrete
inspection
and
the
cost
I
got
of
three
firms
was
around
ninety
seven
dollars
an
hour,
so
the
gap
kind
of
want
to
know
why
it's
so
high.
We
have
a
very,
very
small
footprint,
so
is
it
considering
30
weeks
of
inspection
at
40,
op
40
hours
a
week?
That's
pretty
much!
What
the
budget
is-
and
it's
like
the
way
we
did
it
in
Fremont-
was
you
bring
out
your
inspector
when
you
need
them?
F
B
A
B
E
D
Do
the
chair,
okay,
is
he
council,
member
and
mr.
Medina
was
asking.
B
B
D
If
I
made
I
mean
my
experiences
I've
seen
and
I've
seen
some
bits,
you
know
actually
you've
included
them,
and
you
know
in
past
projects
where
the
consultant
was,
the
contractor
provides
a
you
know,
a
list
of
duties
and
with
the
corresponding
hourly
rate,
and
it
may
even
be
detailed
to
actual
tasks.
You
know
you
know
like
three
hours
or
two
hours
of
something
at
a
certain
rate.
You
know
for
particular
types
of
duties
or
particular
types
of
consultants
and.
B
That's
how
you
seen
this
case
also
but
I,
just
not
having
the
rates
in
front
of
me.
I
am
reluctant
to
give
you
wrong
information
typically
based
on
what
I
saw,
is
that
hourly
rate
is
varied,
but
they
are
very
consistent
among
the
finance
consultant.
I
can
provide
you
with
specific
with
those
specific
rates.
I
can
forward
that
information
to
you
tomorrow
and
if
you
feel
okay-
and
I
have
the
rate
here-
I
have-
the
rates
is
between
118
dollar
and
170
dollars,
depending
on
the
type
depending
on
the
type
of
inspection
provided.