From YouTube: Wausau Board of Public Works 12/8/2020 Part 1
A
A
A
second
all,
those
in
favor
aye
aye
item
two
is
the
drinking
water
treatment
facility.
Myron
construction
pay
estimate
number
four
again
moving
through
construction.
This
is
pay
estimate.
Number
four
I'd
make
a
motion
to
approve.
D
That's
correct,
yes,
pay
application
number
three,
which
I
believe
will
be
paid
this
wednesday
will
be
the
payment
coming
in
december,
and
this
will
be
for
the
january.
D
C
A
E
Yeah,
I
definitely
can
thanks
eric.
Essentially
when
we
completed
the
design
of
the
riverwalk
project.
We
did
work
with
engineering
and
geotech
to
do
some
preliminary
investigation.
E
We
did
have
borings
done
behind
that
wall
on
the
landward
side,
to
try
and
figure
out
if
we'd
be
hitting
any
obstructions
when
the
sheet
piling
did
go
in
and
those
locations
were
about
seven
feet
behind
that
wall,
and
they
indicated
you
know
tougher
drilling,
but
the
the
auger
did
go
through
and
it
looked
like.
We
were
going
to
clear
the
any
obstructions
down
there
when
it
came
to
construction.
E
They
did
it
refusable
with
the
sheet
piling
that
it
was
not
advancing
through
that
area,
and
it
appeared
that
it
was
the
footing
of
the
existing
stone
wall
that
it
kind
of
bellowed
out
at
the
bottom,
for
a
footing
for
that
existing
wall
that
the
auger
was
getting
through.
But
the
sheet
padding
was
not
so.
What
we
ended
up
doing
during
construction
then
was
redesigning
that
trail
alignment,
which
was
really
tight
because
we
were
shoehorning
it
in
behind
those
houses.
E
So
we
did
have
to
realign
that
trail
alignment
further
landward
between
three
to
six
feet
that
varied
to
avoid
those
obstructions.
And
then
then
they
continued
with
construction.
With
that
new
path,
alignment
and
then
the
only
other
thing
was
related
to
the
connection
for
the
existing
curb
wrap
that
was
constructed
with
the
thomas
street
project
that
was
constructed
at
a
different
location
than
the
original
plan,
construction
that
we
were
working
with
for
that
connection,
so
that
had
to
be
updated
at
the
end
as
well.
A
C
A
A
This.
This
has
been
an
ongoing
project
for
a
couple
years.
Actually,
so
the
south
primary
digester
cover
was
put
into
service
this
past
spring.
A
C
B
This
is
for
all
work
completed.
This
would
be
the
final
pay
estimate
less
the
retainage.
We
are
recommending
10
retainage
due
to
the
ride
quality
issues
that
are
ongoing.
There's
a
breakout
in
the
packet
of
what
that
10
would
go
towards.
A
F
C
F
C
A
Okay:
item
nine
20
20
riverwalk
project,
yankee,
general
contractors,
pay
estimate
seven
make
a
motion
to
approve.
C
C
A
I'm
with
you
maryam
everything,
that's
been
done
and
even
their
neighbors
what
they
did
and
that's
what
they
chose.
It's
just
crazy,
yeah.