
►
From YouTube: Groton Inland Wetlands Agency 6/22/22
Description
Groton, Connecticut municipal meeting: Inland Wetlands Agency June 22, 2022. Click on the link below to view the agenda.
https://www.agendasuite.org/iip/groton/meeting/details/1615
A
And
dave
is
obviously
not
here,
you
say,
I'm
upset
so
gary.
A
A
A
It
is
located
in
the
multi-family
zone
system,
apartment
complexes
around
the
development
site
and
then
the
senate's
agency
has
reviewed
this
location
with
applications.
A
A
A
A
A
A
I
had
asked
the
soil
scientists
if
she
was
taking
samples
up
any
further.
She
said
there
was
no
reason
to
because
of
where
she
had
taken
samples
from
that
farther.
You
know
she
said
once
you
get
beyond
80
to
100
feet,
there's
no
point
we're
not
just
going
down
any
distance
into
that
soil
more
than
4
inches,
so
she
had
made
the
determination
not
to
not
even
bother
testing
not
dumped
that
farm.
A
So
I'm
kind
of
far
it
could
be
closer
to
the
front
up
into
here
and
a
little
bit
closer
to
the
side.
A
A
So
it's
12
inch
footing
all
the
way
around
12
by
12.,
so
there's
no
cross
footing.
Basically
on
a
slab.
That's
cross
coating
is
just
12
inches,
so
we're
just
taking
out
the
12
inches
around
the
circumference
of
the
square
and
then
that
just
gets
spread
out
and
then
the
concrete
gets
poured
on
top
of
that
in
the
pad
and
then
just
gets
folded.
A
A
A
A
A
A
A
A
A
A
A
A
A
C
C
A
Garden
tools
like
that,
that's
for
their
use,
it's
a
good
spot
to
put
it
over.
There.
C
So
that
was
item
one.
The
other
item
was
I'm
asked
if
you
could
pull
this
back,
pull
the
outlet
back
up
here,
but
we
did.
It
doesn't
really
tell
a
whole
lot
on
here,
but
we
pulled
it
back
from
eight
to
about.
C
Units
here
decide
to
create
almost
cascading
effects,
so
it
follows
the
contour
and
then
manipulate
the
catch
basin
slightly
just
to
get
the
elevation
up
a
little
bit.
So
we
were
able
to
get
the
elevations
in
the
units
up.
Six
inches
allowed
us
to
raise
our
outlet
by
six
inches,
which
allowed
us
to
pull
it
back
about
five
feet.
So
we
did
we're
able
to
get
a
little
bit
more
distance
before
it
wasn't
10
or
20
feet
like,
but
anyway,
their
best
based
on
the
elevations.
We
have
and.
A
Did
have
staff
review
for
planning
as
well?
So
there
are
some
other
minor
changes
that
I'll
go
over
with
you
guys
that
didn't
discuss.
C
Some
electric
modifications
before
we
had
a
single
line
coming
up
to
the
sand,
hole
now
actually
outside
the
hundreds
over
the
area,
but
there's
going
to
be
some
new
electrical
work
coming
in
for
this
building.
Because
of
that,
we
have
a
new
electrical
line
coming
in
this
direction,
rather
than
from
the
street.
A
C
The
common
space
you
start
to
show
that
you
have
enough
marketing
for
it,
so
what
we
ended
up
doing
is
you
can
see
on
this
plan.
This
is
phase
one
lower
road
control
plan,
there's
already
the
gravel
parking
spots
that
are
here
we're
just
going
to
maintain
the
gravel
parking
spots,
we'll
eliminate
the
pavement,
get
some
grass
area
between
our
parking
lot
and
our
roadway
we'll
maintain
the
gravel
parking
spaces.
Here
that
way,
we
show
that
we
have
fifty
percent
of
their
fire
parking
space.
We're
gonna,
add
straight
parking.
C
C
Convert
this
to
the
residential,
please
keep
this
roll
parking,
this
gravel
parking
area
here
this
pavement
area
eliminate
this
pavement
here,
so
the
access
will
stay
the
same
through
all
the
way
out.
This
is
phase
one
once
that
is
complete.
Here's
phase
two,
so
this
pavement
goes
here,
has
been
removed.
C
Parking
spaces
remain
from
what's
here,
we'll
extend
the
new
driveway
up
to
the
back
units,
so
we'll
have
this
new
drive
up
to
these
back
town
homes,
there's
10
town
homes
back
here
we'll
have
the
utilities
that
have
to
go
up
back
to
these
these
units
here
phase
three,
once
you
know,
you've
maintained
the
curb
cut
parking
spaces
for
these
two
developments.
These
three
and
we've
got
to
construct
the
front
parking
area
for
that
building
area.
That's
when
we'll
install
the
new
access
drive
location,
we'll
eliminate
this
one-way
exit
here,
we'll
construct.
A
A
C
Yeah,
so
I
think
so,
if
we
split
the
difference,
we
have
76
proposed.
C
So
actually
originally
it
was,
I
think
we
were
at
76..
I
don't
know.
Actually
I
think
you
know
what
happened.
We
added
two
parking
spaces
here.
We
eliminated
this
and
I
think
at
some
point
we
were
able
to
get
two
more
actually,
we
said
when
we
extended
this
and
eliminated
made
some.
A
A
A
A
A
A
A
A
A
A
A
D
A
A
A
B
C
B
A
A
A
A
A
A
B
A
A
It's
just
so
yeah.
B
A
A
A
A
B
A
B
B
B
A
So
that's
some
of
those
downspouts.
You
can
put
some
rain
gardens
in.