►
From YouTube: IPFS- go-ipfs Roadmap Aug 1 2016
Description
A
Hello,
everyone
welcome.
This
is
go
I
PFS!
You
were
here
for
the
last
one
awesome.
Basically
what
we're
doing
today,
instead
of
having
the
normal
hangouts
or
generally
don't
know
what
he's
doing
or
David
or
whatever
we're
going
to
be
going
through
specific
roadmaps
we
developed
over
the
past
week
or
so
at
the
workshop
and
elsewhere.
This
will
not
be
seen
on
get
up
on
the
PM
Rafael
in
the
fs
organization.
A
If
you
look
at
the
sprint
issue,
/
today,
issue
number
130
you'll
see
a
link
to
it
as
well
as
link
to
computer
pad
and
basically,
what
we're
going
to
be
doing
is
going
through
this
roadmap.
We
have
the
next
couple
months
or
so,
and
look
at
like
whether
or
not
it
matches
up
with
our
design
for
the
future
and
what
we
want
to
do
about
it.
So
I'm
gonna,
let
Emily,
and
why
are
you
sleeping
for
most
of
this?
A
If
you
have
any
question,
feel
free
to
throw
them
on
IRC
and
I
will
look
at
them
Henderson
and
otherwise.
Thank
you
very
much
for
watching
and
Emily
I
think
you
want
to
take
away
how
it's
going
to
go
well.
B
C
Cool,
so
on
the
issue
we
have
same
for
end
of
July
pre
q3.
We
wanted
to
ship
both
the
fso
43
wanted
to
have
sharding
for
sure,
and
then
there's
some
other
things
on
there,
which
I
don't
know
why
they're
put
on
pre,
q3
I.
Think
that
was
a
mistake.
I,
don't
think
that
was
written
up,
but
as
far
as
shipping
0
for
3,
we
have
some
UX
issues
that
we
are
waiting
on.
We
got
the
release
candidate
out,
which
is
good,
and
we've
identified
and
fixed
a
few
bugs
all
ready
for
that.
C
The
second
release
candidate
should
be
out
probably
an
ad
in
the
day
or
two
down
to
chardon.
We
well
I've
got
some
good
working
on
that.
A
It
is,
there
were
some
scrabble
arabs
and
taking
it
down
from
the
wall,
issues
that
we
had
and
onto
this
thing
so.
A
A
C
Do
that
give
me
one
second,
okay,
so
one
of
those
checkboxes
does
not
get
the
public
key
from
sekai.
Oh
and
the
second
is
web
sockets,
not
getting
the
public
keep
in
sec.
I,
oh
I
think
is
not
something
that
we're
going
to
worry
about,
because
we
want
yeah
kuba,
that's
so
we
want
to
be
able
to
implement
Sakai.
Oh
Friedel
was
working
on
that.
So
we
don't
have
to
worry
about
that,
because
we
don't
have
any
interoperability
between
the
two
without
sec,
I
Oh
in
the
first
place.
C
So
it's
kind
of
no
point
there.
The
second
bit
is
web.
Sockets
and
I.
Have
this
working
just
need
to
get
it
merged
and
tested?
As
with
everything
past
that
multiple
protocol
version
handling
one
to
bead
and
I
made
some
good
progress
on
how
exactly
we're
going
to
do
this
the
other
night?
And
so
we
have
that
figured
out.
C
It
should
be
pretty
easy
to
implement
and
I
think
we'll
probably
be
able
to
make
at
least
that
part
second
week
of
August,
and
then
we
have
a
data
store
too
many
file,
descriptor
fixes
which
actually
get
done
so
I'm
going
to
check
those
boxes
right
now
week
3,
we
want
to
have
multi
codecs
implemented.
This
is.
D
A
C
Cool
thanks
all
right,
so
yeah
multi
codecs
implemented.
This
is
going
to
change
to
to
be
not
just
multi
codecs
implemented,
but
we
also
need
to
implement
well
first,
we
need
to
decide
on
our
content,
ids
spec.
As
far
as
the
changes
for
IPL
deep,
adding
that
we
discussed-
and
I
think
one
just
posted
an
issue
to
discuss
this-
see
if
I
can
find
that
real,
quick
and
post
that
here,
because
it's
relevant.
C
C
C
C
E
C
A
A
E
C
E
E
C
A
A
C
Let's
leave
it
there
for
now.
We
can
always
move
it
back
later
when
he
gets
back
Nicole,
better
metrics.
We
should
one
of
the
to
do.
Some
here
is.
C
B
B
We're
all
out
of
the
gate
pad
at
the
top.
We
had
a
list
of
things
from
the
2006
cute
redock
that
we
reviewed
things
that
were
not
completed.
B
C
Yeah
so
I
mean
testing,
that's
so
the
third.
The
bug
fixes
are
all
complete
enough
to
be
no
longer
prioritized
all
right.
We
none
of
those
got
prioritized
during
the
meeting
I'm,
not
super
concerned
with
them
other
than
reduced
idle
bandwidth
usage,
which
we
was
brought
up
and
we
decided
that
I
pld
was
more
important
than
that.
C
B
Okay,
so
what
about
under
the
improvement
yeah.
C
D
F
C
We
came
up
with
something.
Basically,
there
are
some
bugs
in
bit,
swap
that
mean
fix
alongside
this
and
o
speakin
o
much
here's
one.
So
we
need
to
basically
have
a
request
ID
for
each
list,
entry
and
that
needs
to
be
sent
back
and
forth
and
then
use
when
we're
sending
lots
of
people
to
make
sure
that
we
keep
track
of
them
and
can
hash
things
properly.
So
thats
kind
of
alongside
the
bits,
false
paths
changes
because
we're
gonna
have
to
change
that
all.
C
A
C
C
C
C
So
storage
limits
shouldn't
take
too
long.
We
can
probably
throw
that
one
in
September
somewhere
memory
limits
is
really
hard.
Bandwidth
limits
have
hard
performance
issues
or
if
we
start
the
meeting,
then
Witten
we
have
to
worry
about
limiting
different
protocols
versus
other
protocols,
and
you
know
one
protocol
choking
the
others
out
blah
blah
blah
which
gets
difficult
to
do
so.
That's
those
that
review
thing
alright,.
C
Other
than
what
I
just
removed
of
the
interspace
sharding,
what
is
already
in
the
August
yeah
cool
now
so
I
pld
blocks
for
integration.
This
is
going
to
require
the
content,
ID
stuff
to
be
finalized
and
implanted
leave.
F
C
C
C
Let's
say
the
RC
there
and
then
because
basically
the
whole
reason
for
this
one
is
to
have
a
fifth
unix
of
s
charting.
That's
our
core.
Like
thing
we
want
in
that
release
and
it
shouldn't
be
a
huge
release.
We
shouldn't
have
too
much
stuff
in
it,
so
it
shouldn't
be
too
hard
to
get
through
and
I
think
that's
realistic,
honestly,
cool
now,
September
week.
Three
here
comes
the
fun
stuff.
We
want
to
buy
September
week,
3
be
done
with
our
code
coverage.
Push
this
means
across
all
of
our
goat
repos.
C
We
have
over
80%
code
coverage
on
all
packages.
I
have
in
my
goals
thing
that
I'm
formulating
and
going
to
post
as
a
Captain's
Log
update
a
very
large
list
of
every
single
package
that
that
implies
so
I'm
going
to
put
that
and
then
we're
going
to
go
through
and
it'd
be
nice.
If
we
could
figure
out
how
to
automate
this,
and
so
I
think
part
of
the
part
of
this
goal
is
figure
out
how
to
automate
code
coverage
across
all
of
our
repos
and
maybe
even
have
a
dashboard
forward
on
a
project.
C
C
What
this
means,
though,
is
that
we
want
it
done
on
September
week
3,
which
means
that
it
has
to
be
in
progress
through
the
last
six
weeks
before
their
that's
going
to
be
roughly
three
or
not.
It's
gonna
be
like
five
repos
completed
a
week
which
estimating
is
going
to
be
20
hours
worth
of
work
per
week,
which
is
a
lot,
it's
probably
probably
less
than
20,
but
that's
just
kind
of
a
little
closer.
C
C
We
need
to
find
so
we
can
either
take
this
over
more
ourselves,
which
is
going
to
be
a
fair
time
investment
or
we
need
to
source
the
community
to
find
somebody
who's
willing
to
take
a
more
ownership
on
this
either
way
we
want
to
have
this
complete
documented
nicely:
have
all
the
API
calls
implemented
and
actually
have
tests.
We
don't
want
that
for
this
right
now,.
C
C
E
E
C
So
that's
not
the
huge
bottleneck.
It
actually
gets
really
fast
when
you're
fully
connected
and
have
made
queries
previously.
So
I,
it's
not
priority
to
fix
this
all
time,
but
it
should
be
priority
to
improve
published
I'm.
So
look
into
that.
The
other
thing
I
want
to
start
doing
is
I
want
to
use
I
pns
for
one
of
our
websites.
C
We
should
start
thinking
about
a
candidate,
for
this
should
be
a
website
that
is
used
with
some
frequency,
but
not
horribly
bad.
If
something
goes
wrong
for
a
few
minutes,
obviously
we
don't
want
anything
failed,
but
we're
testing
out
a
feature
that
we
haven't
put
a
lot
of
pressure,
and
you
know
time
on
so
maybe
with
Richard.
F
You
know
soju
doesn't
make
a
make
an
alias
to
dis
da
visit
I-
oh
that's
like
this
too,
or
something
and
then
use
that
for
builds
and
stuff
and
so
download
stuff
from
there.
Yes,
a
mirror
of
the
regular
dist,
but
it
uses
it
go
throughout
the
MS.
Well,
then,
you
can
see
whenever
it
fails,
which
is
the
NCI
yeah.
C
E
C
Cool
so
yeah.
Let's
that's
a
good
idea.
Let's
do
that.
We
also
want
to
have
integration
testing
which
putting
using
a
pianist
for
our
discs
page
for
her
see
I,
would
that's
a
level
of
integration,
testing,
I,
think
so
that
would
be.
You
know
two
birds
with
one
stone
their
reliability.
Let's
try
that
front
of
file
descriptors.
This
is
a
hard
problem,
because
there's
many
layers
with
Norma
to
file
file
descriptors
at
each
of
them
handles
the
issue
differently,
the
block
store
or
flat.
C
C
Leveldb
will
fail
to
put
which
kind
of
sucks,
because
it
does
throw
that
to
the
upper
layers
and
causes
whatever
operations
we
were
doing
there
to
fail.
We
might
want
to
try
handling
that
better
like
catch
that
an
error
from
of
the
be
in
try
or
something,
then
the
other
one
is
in
lib
p2p.
When
we're
dialing
out
that's
hard,
because
there's
two
different
ways
is:
it
can
fail
when
we're
dining
out
which
we
can
handle
just
by
trying
to
dial
again
handling
their
butt
on
the
listening
side.
C
If
somebody
tries
to
connect
to
us
and
ratified
the
scriptures,
then
that
just
sales-
and
we
don't
really
get
a
clear
idea
of
if
it
like
when
that
happens,
pretty
sure
that
listen
will
not
return
an
error.
If
somebody
tries
to
dial
us
and
we
can't
accept
due
to
file
descriptors
cool
IPL
d-block
store
integration.
This
was
somewhere
else
already
thought
yeah,
that's
in
September
week
one.
So
it
looks.
C
Well
right
sharding
data
sheets,
but
does.
C
The
September
week
for
shift
go
at
the
fso
44
yeah
that
sounds
right,
Wow
and
then
to
their
next
week.
We're
going
to
ship
the
50,
rc1
cool
I.
Don't
think
that's
super
realistic!
We
can
try.
It
really
depends
on
how
all
of
this
goes.
But
there's
no
there's
no
green
for
slack
here.
So.
B
C
It's
really
going
to
pend
how
all
of
the
rest
of
sep
tember
goes
and
if
we're
able
to
meet
the
IPL
d-block
store
changes
and
implement,
go
I
pld,
which
isn't
actually
on
this
list.
As
far
as
I
can
see,
and
it's
kind
of
a
hard
requirement
for
implementing
I,
pld
and
shipping,
the
RC
1.
So
we
need
to
have
like.
C
B
F
B
C
So!
Well,
you
guys
were
talking
about
that.
I
moved
I,
pld
blocks
or
integration
back
two
weeks
to
sep
tember
week.
Three
because
it
depends
on
go
I
pld
in
go.
I
pld
depends
on
having
the
multi
codex
Content
ID
stuff
finished,
so
I
move
those
to
give
us
a
week
of
time
for
each
which
is
generous
or
not
that's
kind
of
like
Titan,
but
we'll.
A
F
We're
hunting
one
thing
worth
mentioning
is
that
if
something
runs
late
to
building
some
buffering
into
the
schedule,
so
that,
if
something
goes
late
in
one
week,
it
can
be
picked
up
in
the
next
one
without
removing
anything
critical
for
that
week.
Otherwise,
the
whole
thing's
gonna
start
sliding,
and
that's
not
very
great.
B
B
E
A
A
A
E
A
C
C
A
For
us
all
right,
thank
you,
everyone,
sorry.
This
was
kind
of
a
technical
talk
about
schedule.
What
was
all
useful,
Emmaline
or
yeah
Emily?
Do
you
want
to
take
these
notes
and
put
them
on
the
issue
and
split
them
for
I
can
do
that
now
by
the
way
I
feel
D
you
got
it
want
me
to
do
if.