►
From YouTube: CEB Construction Review.m4v
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Just
a
builder
of
20
years
experience
for
residential
and
light
light
commercial
construction.
Ok,
so
here
we've
got
the
infamous
wall
that
there's
a
lot
of
controversy
regarding
the
soundness
of
the
soul,
so
Floyd
we
have
to
address
here
the
structural
and
moisture
issues
so
what's
to
be
said
about
this
wall.
What
do
we
need
to
do
here?
Well,.
B
C
B
This
is
this
right
now
this
is
an
exterior
wall,
it's
because
the
rest
of
structure
isn't
built
on
it,
but
this
is
basically
just
an
interior
wall.
Now,
there's
no
waterproofing
here,
but
once
this
gets
dry
once
you
get
your
roof
on,
then
your
your
degradation
of
the
bottom
block
will
probably
almost
come
to
a
complete
stop
once
you
get
the
weatherization
away
from
it.
These
aren't
stabilized
box.
There
are
very
high
content
in
this
area
because
that's
all
you
have,
but
you
can
have
a
high
clay
content
very
high
and
they're
very
strong.
B
A
B
B
A
B
Recommend
a
frost
protected
footer,
so
it's
going
to
be
a
heated
structure,
so
your
frost,
protective
footer
will
work.
I've
done
dozens
of
them
in
lock
core
requirements
and
this,
but
you
got
to
get
your
you're
going
to
have
a
swell
position
around
it.
You
have
to
get
this
all
down
and
you
frost
protect
it
with
insulation
in
the
ground.
Now
a
wall
like
this,
no,
my
doesn't
matter.
B
C
B
With
this
structure
again,
this
is
a
this
is
an
interior
wall.
Just
at
this
phase
is
the
construction.
It's
it's
exposed
to
the
elements
yeah,
the
best
thing
I've
been
doing
is
go
ahead
and
get
the
column
foot
up
and
get
your
roof
structure
in
place
and
then
come
back
and
address
both
ends.
It's
going
to
be
exposed
to
the
outside
the
best
way
to
do
that
is
just
take,
maybe
a
foot
or
so
or
two
blocks
down
and
put
concrete
blocks
on
each
in
and
water
people.
Ok.
B
A
B
B
A
B
What's
wrong
with
that?
Yes,
those
ones
that
are
on
your
your
machines,
put
now
blocks
that
are
real
close
to
the
width
and
the
in
that
you
got
a
fixed
position
on
your
box
or
12
inches
by
five
or
something
whatever
you
said,
but
there
somebody
confused
the
other
dimension
that
varies
a
little
bit.
They
ended
up,
put
them
up
right.
So
that's
why
you
got
a
different
variants.
There
that's
easy!
If
you
want
to
straighten
all
that
out,
that'd
be
really
easy.
B
B
Usually
so
you
have
a
few
seems
to
find
out
up
over
two
courses-
someplace
here,
here's
one
that
there's
almost
lined
up,
but
if
you
notice
this
is
lined
up
three
courses,
that's
that's
the
only
one
I've
seen
if
you
just
got
two
courses
in
the
rest
of
our
staggered,
then
I
don't
see
a
problem
with
it,
particularly
in
this
case.
Here
it's
not
really.
It's
just
an
interior
wall,
uh-huh.
C
B
B
Here
you're
doing
two
things:
you're
you're
using
green
blocks.
You
know
everybody
advertise,
though
you
can
build
a
wall
right
out
of
the
block
machine.
That's
true!
If
you're,
in
a
drier
climate,
where
your
moisture
level
might
be
at
five
percent
max.
But
here
are
you
in
the
summertime,
you
will
never
get
a
moisture
level
at
five
percent.
B
Max
you're
gonna
have
to
bait
it
with
lime
or
Santa
more
than
or
something
is
such
a
high
clay
content
here
there
is
some
sand,
but
because
of
this
high
clay
content,
you're
going
to
get
you
put
these
Walt,
you
put
these
or
green
blocks
you
put
in
so
when
they
dry
it
a
little
bit
they're
going
to
shrink
back
uh-huh
they're,
going
to
shrink
back
from
the
edges.
How
strong
earth.
B
B
C
C
B
C
B
Only
issue
I
could
see
what
anything
might
be
is
where
the
blocks
meet
the
footer
and
there
there
wasn't
any
fire
a
waterproofing
put
in.
If
this
was
an
exterior
wall,
I'd
say
you're
going
to
have
to
tear
it
down,
but
this
is
an
interior
wall.
This
is
going
to
be.
This
is
going
to
be
dry.
It's
not
really
it's
not
going
to
see
any
moisture
as
soon
as
you
get
this
the
columns
and
rook
long
within
a
week.
This
will
not
see
any
more
sheer,
except
on
the
outside
uh-huh.
B
Then
the
first
thing
you
do
is
get
the
columns
up
get
the
swell
back,
so
the
water
can
drain
away.
It
will
never
have
a
tendency
to
come
in
through
the
underneath
the
floor
and
get
this
damn.
Ok
and
it
will
start
a
drying
process
as
soon
as
you
get
this
roof
on,
it
will
start
a
drying
process
and
you
know
what
a
year
you
know
the
question
is:
no
one
I,
don't
think
they'll
be
enough
moisture.
Once
you
get
the
roof
on
that
will
cause
you
any
deterioration
on
these
places
here.
B
B
B
Press
rohrbach,
take
those
bad
ones
out,
tix
those
and
then
put
these
few
places
where
you
got
two
layers
of
two
seams
on
top
of
each
other
they're
very
few
and
far
between
structurally
that's,
not
gonna,
hate
them,
because
you're
sitting
on
a
footer
to
begin
with,
remember
load
goes
out
on
a
45
degree
angle.
So
that's
fun!
B
Now,
if
you
had
four
or
five
layers
of
it
in
the
crack
was
all
the
same,
then
you
got
a
problem,
because
if
you
got
this,
but
you
only
got
two
layers
in
at
reality,
you
only
got
one
block
difference
that
they're
on
top
each
other.
So
you
can't
in
the
rest
of
our
tidying
up
here
and
it's
tight
end
mobotix,
so
you're
not
going
to
get
okay.
B
Know
anything
about
that
on
your
what
I
see
that
you're,
making
there
they're
just
a
clay,
brick
run
I,
don't
know,
I,
don't
know
what
you
know:
I,
don't
wanna
get
into
that.
I,
don't
know
about
what
we
meet
my
trash
tricks,
these
ones
here
they
seem
pretty
good.
My
machine
is
made
by
somebody
else
and
if
I,
when
I
use
this,
if
you
look
at
my
blocks,
they
do
the
same
thing
now.
B
B
Now,
if
you
haven't
covered
up
so
they
can
dry
out
slowly
over
period
a
couple
months,
you
won't
get
any
cracks.
Does
the
whole
block
releases
the
moisture
from
the
inside
and
it
shrinks
uniformly,
but
we
have
here,
the
outside
the
block
shrink
grow
rapidly
because
the
moisture
in
the
wind
and
the
Sun
sucked
it
all
out-
and
it's
Frank
so
rapidly
in
subsurface,
underneath
there
wasn't
quite
as
wet
dry,
so
I.
It
started
shrinking
back
at
you
for
cracks.
Excellent.
A
B
This
is
my
project:
I
would
address
both
hands.
I
tear
their
blocks
back
a
couple,
foot
use
a
little
bit
of
waterproofing
from
the
answer
is
you
will
all
constantly
get
moisture
from
the
ends
and
then
waterproof
and
then
bring
blocks
of
concrete
in
a
little
ways
and
then
and
then
and
then
waterproof
to
concrete
separate,
keep
the
concrete
separate
from
the
earth
with
a
vapor
barrier,
whether
it's
mastic,
where
they're
probably
amassing
and
then
then
go
ahead
bill
you
all
back
up
against
the
concrete
box.
B
The
part
that's
on
both
ends
is
going
to
be
exposed
to
the
elements,
and
then
this
here
I
would
take
and
clean
it
off
fix
your
your
water
damage
here
from
the
storms
press,
the
new
box
put
in
there
and
I
would
just
put
on
a
thin
slurry
of
earth
and
plaster
a
little
bit
of
lime
and
clay
and
sand
and
swear
this
in
back
level
and
then,
when
you're,
laying
the
box
next
time.
I
would
be
real,
careful
and
make
sure
that
you're
using
the
two
sides
that
the
dimensions
are
always
the
same.
B
B
B
C
B
That's
the
side,
you
put
side
by
side.
So
that's
why
it
does
it.
You
know,
but
the
heights
will
always
see.
Be
perfectly
the
same.
So
this
is
because
somebody
got
confused
and
maybe
your
block
machine
if
those
dimensions
were
spread
out
a
little
bit
farther,
then
it
wouldn't
be
it
would
then
it
wouldn't
be.
You
couldn't
get
unconfused
they'd
have
to
lay
down
uh-huh.
A
B
B
And
you
we're
talking
about
we're
only
talking
about
about
16
inches,
really
only
talking
about
about
16
inches.
It's
going
to
be.
You
know,
man,
maybe
to
see
ya
about
16
inches
of
a
backfill
against
this
wall,
but
the
backfield
will
never
touch
the
wall.
You're
going
to
use
six
mil
plastic,
okay
and
then
you're
gonna
come
back
with
us.
B
A
thin
layer
of
foam
and
the
foam
is
all
that's
for
is
to
protect
the
plastic,
so
these
rocks
won't
push
up
against
the
plastic,
put
holes
in
it,
and
that's
only
for
the
interim
once
this
is
completely
dried
in
it
doesn't
matter
they
talk
them
being
moisture
anyway.
We're
just
doing
this
as
a
protective
item
actually
I'd
recommend
wrapping
this
whole
wall
followed
the
top
uh-huh.
C
B
C
B
Would
be
a
problem
because
the
water
would
come
down
here
and
they
try
to
soak
in
uh-huh,
but
this
is
an
interior
wall.
It's
just
right
now,
it's
on
the
exterior,
but
it's
just
built
because
of
the
structure
hasn't
been
built
over
it
yet
so
this
won't
be
a
problem
because
it's
an
interior
wall,
but
if
this
was
an
out,
Sherri
wall
even
have
to
tear
this
off
and
I
would
never
I
build
another
curb
up
higher
if
this
was
an
exterior
wall.
But
it's
not
it's.
A
A
B
Remember
I
said:
all
load
goes
out
at
45-degree
angle,
the
gravel,
a
gravel,
footer
or
gravel
underneath
a
concrete
thing
here.
That's
called
red
footer
a
spread
footer,
that's
because
it
spreads
the
load
out
at
45
degree
angles
before
it
compresses
on
to
the
soil.
That's
underneath
it.
It's
called
a
spread
footer.
So
in
reality,
even
though
this
wall
over
here,
your
order
is
lined
up
my
time
it
puts
pressure
on
to
the
soil
four
to
six
inches
down.
It
comes
out
of
45.
B
A
B
C
B
Is
that
absorbs
some
movement
to
which
is
good?
This
is
how
I
built
in
when
I
build
a
wooden
foundations.
This
is
the
same
way.
I
built
I've,
built
foam
block
houses
on
build
concrete
block
houses
with
the
sheer
wall
on
both
sides.
I've
built
stick
I've
built
to
the
six
I've
tried
all
the
methods,
and
we
just
can't
keep
doing
what
we're
doing,
and
this
is
by
far
the
biggest
enemy
with
this
in
this
area.
The
country
is
water
so,
like
they
do
in
straw,
bale
construction,
where
they
do
they
build
the
structure.
B
If
it's
this
time
of
year,
they
build
the
structure,
put
the
roof
on
it,
then
he
in
feel
the
bales.
Then
that's
the
same
way
you're
going
to
be
doing
here,
but
but
officially
these
these
walls
will
be
part
of
the
structural
process
too,
but
at
first
they're
going
to
walk
kind
of
like
its
structural
process
and
well
your
your.
Your
columns
are
going
to
be
supporting
most
your
weight,
so.
A
B
I
would
do
any
of
your
structures.
I
would
do
that
first
unless
it's
in
the
middle
of
summer
and
it's
super
dry
well.
What
I
would
do
is
I'd
use,
just
like
the
pole,
barn
builders
doing
just
like
I've
done
in
the
past
when
I
build.
My
house
is
all
this
stuff
I.
Do
it
because
I
have
a
small
crew
and
I
in
this
part
of
the
country.
B
Even
in
summer
time
you
don't
know
you
could
come
up
a
rainstorm,
it
can
be
raining
for
a
week
and
a
half
depends
if
there's
a
hurricane
in
the
south
and
you
pumps
up
all
this
moisture
for
you
get
wet
for
two
weeks,
I
like
doing
the
structure
and
have
a
roof
over
it.
Then
it's
easy
for
me
to
bring
the
blocks
in
and
just
leave
them
in
there,
and
then
you
can
build
it
as
you
go
so.
B
Yeah,
I
would
use
pressure-treated
post
laminate
laminate
a
pressure
pressure
treated
post
up
for
right
now
and
embrace
them
get
your
roof
panels
on
get
it
all
dried
in.
Then
you
could
come
back
and
start
building
your
columns
around
them
and
then
sniffing
everything
up
and
build
the
rest.
Your
walls,
mmhmm.
C
B
A
C
B
Then
there
will
never
be
any
more
moisture
on
this
wall
and
in
the
same
time,
you
get
that
dried
in
some
baby
have
a
bobcat
and
make
this
whale
all
the
way
around
it
and
put
your
plastic
on
the
outside
and
that
any
water
to
get
there
will
drain
away
from
the
footer.
It
doesn't
matter,
it
would
drain
it
away,
and
this
is
start
a
drying
process.
So.
C
B
B
B
C
B
New
slurry
mix
on
the
whole
top
this
wall
and
make
sure
your
workers
understand
that
you're,
fixed
dimensions
on
your
blocks
make
sure
the
fix
dimensions
down
so
that
wall
be
perfectly
flat
and
it's
real
obvious
that
they
didn't
they
goofed
up.
That's
why
it's
wavy,
because
whoever
whoever
was
in
charge
wasn't
watching
when
they
was
doing
this
and-
and
they
didn't
didn't,
make
sure
they
put
them
all
mm-hmm.
C
B
B
B
C
A
B
We'll
see,
okay,
Bri
I,
don't
care
where
I
myself
and
everybody
else
go.
Look
at
all
the
hundreds
of
homes.
That's
been
built
out
there
when
you're,
putting
the
ball
to
get
a
lot
of
times.
The
ends
are
missing
and
everything
it
doesn't
matter
because
you're
going
to
use
a
plaster
or
something
you
know
you're
going
to
smooth
it
up
so
you're
going
to
dip
it
in
the
cracks
but
stuff.
But
this
wall
will
shrink
back
as
ice
blocks
dry,
but
it
doesn't
matter
they
freed
from
the
edge
the
load-bearing
is
in.
B
The
middle
is
still
there's
still
so
much
vertical
load.
In
this
thing
you
can
put
on
it.
It's
ridiculous
compared
to
a
stick
bill,
so
yeah
this
key
as
the
moisture.
So
this
is
going
inside
here,
real
quick,
so
that
problem
see
that
that
problems
done
you're
going
to
tear
these
output
in
new
blocks
net
problems
fixed,
but
from
now
on,
you're
going
to
have
to
have
waterproofing
and
you're
going
to
have
to
have
a
curb,
so
the
water
can
drain
away
on
the
rest
of
these
walls.
Once
you
put
them
in
you.
B
C
B
You
just
know
what
your
limitations,
your
limitations,
there's
just
water,
pretty
much
high
compressive
strength,
no
tensile
strength,
just
like
a
concrete
block.
High
density,
high,
tensile
strength,
compressive
strength,
tensile
strength,
except
the
concrete
block-
won't
deteriorate
when
it
wet,
but
it
will
just
solve
it
right
through
so
yep.