From YouTube: Public Improvement Commission Hearing 4/13/2023
Description
The Boston Public Improvement Commission (PIC) is the owner and regulator of the City's rights of way. The PIC plays an integral role in the City's development and permitting process. From the restaurant that wants to add a seasonal cafe on the public sidewalk, to the developer who wants to construct an underground parking garage for a new housing development, or the homeowner who wants to add an architectural feature to a house that juts into the public space, each must seek approval from the PIC to have its private venture occupy public space, either permanently or on a licensed basis.
A
E
F
F
F
G
G
A
F
All
right,
bye,
all
right
public.
F
And
sidewalk
reconstruction,
as
well
as
a
new
and
relocated
pedestrian
ranch,
street
lighting
infrastructure,
storm
grain
infrastructure,
speed,
humps
and
race,
crosswalks
Harrison
Ave
at
Harvard,
and
at
Bennett
Street
Harvard
Street
at
Harrison
Ave
Bennett
Street
at
Harrison,
Ave
Hudson,
Street
generally
at
address
55
to
57
between
Neyland
Street
and
Harvard
Street
new
business
320
2023,
as
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
specific
repair
plan,
neighborhood,
slow
streets
program,
Harrison,
Ave,
Bennett,
Street,
Harvard,
Street,
Chinatown,
five
sheets
dated
April
13
2023.,.
C
Good
morning
my
name
is
radhunan,
with
kettleson
Associates
here
in
support
of
Boston
Public
Works
and
Boston
transportation
department
present
the
or
we
present
the
proposed
improvements
when
changes
along
Harrison
Avenue
at
Bennett
Street.
At
this
intersection,
the
proposed
changes
include
realignment
of
the
existing
curved
by
the
sidewalks
install
a
race
crosswalk
on
the
north
side
of
Harrison
Avenue
North
of
Bennett
Street
includes
new
drainage
infrastructure,
the
re-location
of
a
12-inch
109,
a
lot
of
production
infrastructure,
installation
and
the
Reconstruction
of
pedestrian
Rams.
H
C
Go
ahead:
okay,
the
next
location
is
at
the
intersection
of
Harrison
Avenue
in
Harvard
Street
proposed
repairs.
Dislocation
include
realignment,
though
the
edge
line
north
of
Harvard
Street
along
Harrison
Avenue,
the
installation
of
a
race,
crosswalk,
reconfiguration
and
installation
of
new
drainage
infrastructure,
the
relocation
of
a
water
line
to
allow
for
that
pretty
into
construction
to
be
installed.
The
planting
of
June
new
trees
and
existing
tree
Wells
the
repairs
to
Street
lighting
conduits
and
reward
wiring
of
Street
Lighting
in
this
intersection
in
the
relocation
of
one
street
lights.
C
A
I'll,
take
this
opportunity
to
remind
the
public
if
you
wish
to
add
testimony
or
ask
questions.
Please
use
the
race
hand
function
at
the
bottom
of
your
screen.
Redu
you
and
I
talked
about
this
yesterday.
Just
want
to
confirm.
Previously
there
had
been
one
speed,
hump
that
was
being
moved
on,
Hudson
Street.
That's
no
longer
the
case.
We
can
remove
that
from
the
record.
Here.
That's
correct!
Yes,
okay,
great,
so
the
Hudson
Street
Improvement
will
be
restricted
from
the
record.
F
All
right
I
will
entertain
a
motion
on
public
hearing
nominative
number
one.
G
F
Okay,
all
in
favor
all
right
stand
or
opposed.
All
right
motion
passes
public
hearing
item
number
two
on.
C
Good
morning
again
for
record,
my
name
is
kettleson
Associates
in
support
of
all
the
Boston
Public
Works
and
Boston
transportation
department
presents
specific
repairs
within
this
area
of
Roxbury
the
the
speed
homes
Maps.
You
know
in
front
of
you
that
describes
the
installation
of
51
speed
homes
throughout
the
interior
neighborhood
streets
to
promote
a
slow
vehicle
speeds
related
to
new
posted
speed
limit
within
the
neighborhood
of
40
miles
an
hour.
C
The
first
intersection
where
we're
proposing
repairs
is
along
Mount,
Mount
Pleasant
Avenue
generally
at
Mount,
Pleasant
Terrace,
which
is
a
private
way
within
this
area.
Proposed
changes
include
realignment
of
the
edge
lines,
reconstruction
widening
of
the
sidewalks
reconstruction
of
pedestrian
Rams
and
the
installation
from
the
race
crosswalk
at
the
entrance
of
Mount
Pleasant
playground.
C
C
Would
you
like
for
me
to
go
through
all
of
them
and
ask
questions
at
the
end
or
yep
okay?
This
is
everything
sure,
so
the
next
location
or
repairs
are
being
proposed
or
is
it
the
intersection
of
Moreland
Street
and
Maryland
Street
in
Monroe
Street,
the
specific
repairs
include
relocation
of
the
edge
lines,
reconstruction
widening
of
the
sidewalks
reconstruction
of
pedestrian
Rams
and
the
raising
of
the
center
of
this
intersection
promotes.
C
Safer
Crossings
of
this
location
to
support
the
installation
of
the
race
crosswalk.
That
repairs
also
include
installation
of
new
drainage
structures,
relocation
of
street
lights,
insulation,
new
streetlight,
conduits
and
I.
Believe
that's
what
we're
proposing
in
this
location?
No
changes
are,
are
displayed
on
this
plan
from
what
was
presented
during
a
new
business
meeting.
C
The
next
intersection
is
adjacent
along
one
rose
or
Moreland
Street
at
Copeland
Street.
This
is
also
a
proposed
raised
intersection.
The
specific
repairs
include
realignment
of
engine
lines,
widening
sidewalks
repairs
to
sidewalks
reconstruction
of
pedestrian
Rams,
we're
allocation
of
a
street
light,
new
streetlight,
conduit
and
new
drainage
structures
to
allow
for
continuous
well-drainage
of
this
area.
C
Following
location
is
along
Copeland
Street
at
Langford
Park
specific
repairs
here
include
just
repairs
to
the
sidewalk
of
reconstructed,
pedestrian
Rams,
then
the
installation
of
a
race
crosswalk
across
Copeland
Street,
just
Southwest
of
Langford
Park,
to
promote
or
benefit
the
installation
of
their
race
crosswalk.
The
specific
repairs
include
new
drainage
structures
and
some
realignment
of
streetlight
conduit.
There's
no
changes
on
the
plan
from
the
presentation
made
during
the
new
business
meeting.
C
The
location
on
screen
right
now
is
that
Mount
Pleasant
Avenue,
the
intersection
of
Mount
Pleasant
Avenue
in
Forestry,
this
location
is
specific.
Repairs
include
realignment
of
edge
lines,
reconstruction,
widening
of
sidewalks
reconstruction
of
pedestrian
ramps,
repairs
and
reconstruction
of
street-like
conduits
and
reconfiguration
or
installation
of
new
drainage
structure.
C
At
the
intersection
note,
changes
were
made
to
the
plans
from
the
presentation
provided
during
a
new
business
meeting.
C
The
location
on
screen
right
now
is
along
Pleasant
Street
between
the
intersection
of
Mount
Pleasant
Avenue,
Dudley
Street
in
Bloomington
Ave
and
Mount
Pleasant
Avenue
and
Fourth
Street.
The
specific
repairs
between
these
two
intersections
Along
on
plasma
Avenue
include
relocation
of
edge
lines,
widening
up
sidewalks
and
reconstruction
of
sidewalks
and
construction
of
pedestrian
Rams
installation
of
new
Street
lighting,
including
conduits
and
relocation
of
Street
lighting,
also
proposing
and
installing
a
new
drainage
feature
and
on
plans.
C
We
have
outlined
the
area
of
the
widen
sidewalk
on
the
north
side
of
Mount
Pleasant
Avenue
that
will
likely
support
installation
of
a
blue
bike
station.
That
is
one
of
the
reasons
for
the
widening
of
the
sidewalk
along
Mount
Pleasant
Avenue,
between
Forest
Street
and
Dudley
Street.
That
is
one
change
to
the
plans
illustrator
on
one
of
these
plans,
based
on
comments
we
received
during
the
new
business
meeting.
C
And
finally,
the
last
location
were
proposing:
repairs
is
along
Thunder,
Street
generally
between
16th
and
18th,
then,
and
with
streets.
The
specific
repairs
here
include
reconstruction
of
sidewalks
and
inflation
of
a
race
crossbar
we'll
have
a
landing
areas.
No
changes
to
this
brand
were
made
since
the
presentation
provided
during
a
new
business
meeting.
A
F
All
right
stand
or
opposed
all
right.
Public
hearing
item
number
three.
H
E
From
Boston
survey
you
can
see
the
plan
I
have
displayed
here,
where
a
line
realigning
the
curb
to
move
it
out
into
the
street.
We're
taking.
There
were
two
spots
where
cars
were
parking.
One
was
in
front
of
a
curb
cut
and
one
was
in
front
of
a
fire
hydrant
and
both
were
not
parking
spaces.
E
F
Brakes
questions
or
comments
from
commission
members.
A
G
B
J
F
Great
thanks,
George.
F
A
petition
by
m
cook
Inc
doing
business
as
the
Boston
sale
law
for
the
granting
of
a
projection
license
for
the
installation
of
a
retractable
awning
over
a
portion
of
the
sidewalk
within
Atlantic
Avenue
public
Way
Boston
Proper,
located
at
address
number
80
generally
north
of
commercial
Wharf.
New
business
330
2023
is
shown
on
a
planet
titled
city
of
Boston,
Public,
Works,
Department
engineering
division,
awning,
license
plan,
80,
Atlantic,
Avenue
Boston,
one
Chief
dated
February
23
2023.
B
Good
morning,
members
of
the
commission,
my
name
is
Lisa
Chao
with
VHB.
We
are
also
joined
by
Jamie
tipping
the
restaurant
owner
of
the
Boston
sale
off
as
well
as
Tom
Miller
from
McDermott
cruelty
and
Miller
can
I
just
wanted
to
confirm
everyone
can
see
my
screen
yep.
Okay,
great!
Thank
you
on
behalf
of
the
applicant.
We
are
here
to
request
the
approval
of
an
awning
license
on
Atlantic
after
the
Boston
sale
off
restaurant.
B
At
the
new
business
hearing
two
weeks
ago,
there
were
a
couple
questions
and
comments
regarding
the
proposed
awning.
So
before
you
is
an
updated
plan,
the
changes
made
to
this
plan
since
new
business
hearing
includes
additional
Dimensions.
B
The
other
comment
that
came
up
is
to
provide
some
contextual
background,
so
the
awning
is
proposed
in
conjunction
with
proposed
outdoor
seating.
Outdoor
Cafe
on
the
screen
is
a
rendering
that
shows
what
is
currently
being
proposed.
There's
outdoor
seating
and
the
proposed
awning,
which
is
retractable,
is
intended
to
provide
Shea
coverage
over
the
outdoor
dining.
B
B
The
other
question
that
came
up
during
new
business
was
regarding
the
drainage
and
shooting
of
rainwater
off
of
the
awning.
So,
as
I
mentioned
earlier,
the
awning
is
proposed
as
shade
coverage.
There
are
no
thigh
flaps
to
protect
patrons
from
the
rain.
So
just
after
discussing
with
the
restaurant
owner
and
based
on
their
experience
there
during
inclement
weather
such
as
rain,
the
awning
won't
be
deployed
because
no
one
will
be
wanting
to
sit
outside
during
the
rain,
so
it
will
be
retracted
under
inclement
weather.
F
A
I
I
just
want
to
add
the
comment
just
confirm
that
actually
the
contract
that
I
had
with
Don
Chester
running
they
explicitly
state
that
the
awning
stays
open
and
inclement
weather,
including
high
winds,
rain
or
inclement
weather.
It
will
not
be
covered
under
the
warranty.
So
that's
under
the
contract
of
the
Dorchester
audit
as
well.
It
is
typically
for.
G
F
All
right
standard
post,
great
public
hearing
item
number
five
on
a
petition
of
Cambridge
Network
Solutions
for
a
granted
location
with
lead
company
status,
no
participants
to
it.
Thank.
F
For
the
grand
location
with
lead
company
status,
no
participants
to
install
new
telecommunication
conduit
within
with
City
Shadow
within
Charter
Street
public
Way,
Boston
Proper,
located
generally
from
Jackson
Ave
at
the
rear
of
Juan
Michelangelo
Street
to
Commercial
Drive
new
business
330
2023
is
shown
on
a
planet
titled
city
of
Boston
Public,
Works,
Department
engineering
division,
Granite
location
plan,
one
Michelangelo,
Street,
Charter,
Street
Boston.
Once
she
dated
February
2023.
K
Good
morning,
members
of
the
pic,
my
name
is
Erica
Hudson
I'm
from
Sienna
Engineering
Group,
representing
Cambridge
Network
Solutions
with
me.
Also
is
my
colleague,
Tom
aggressive,
as
discussed
during
the
new
business
meeting
hearing
two
weeks
ago,
Cambridge
Network
Solutions
is
seeking
grants
a
vocation
on
Michelangelo
Street
to
place
telecommunications
conduit,
starting
at
Charter
and
Commercial
Street.
We
will
be
breaking
out
of
electrical
manhole
number
1319
and
placed
in
conduit
along
Charter
Street
to
the
proposed
Cambridge
Network
solution
shared
handful
number
one.
K
The
next
section
of
conduit
will
leave
the
proposed
Cambridge
Network
Solutions
hand,
hole
number
one
and
continued
Southeast
on
Charter
Street
to
the
proposed
Cambridge
Network
Solutions
shared
handheld
number
two.
This
will
consist
of
four
or
one
inch
conduit,
two
of
which
are
City
shadow.
The
conduit
will
conclude
at
one
Michelangelo
Street,
which
will
consist
of
one
four
inch
schedule:
40
PVC
communication
conduit.
H
F
All
in
favor
all
right
all
right,
public
hearing
item
number,
six
on
a
petition
by
Cambridge
Network
Solutions
for
a
branded
location
with
lead
company
status
and
no
participants
to
install
new
telecommunication
conduit
with
City
Shadow
within
the
following
public
ways
in
Roxbury
Tara
Street
between
forestry
and
Tremont
Street
Gurney,
Street,
Tremont
Street
at
Tara,
Street,
slash,
Curtis,
Street,
new
business,
330
2023,
as
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
great
application
plan
proposed
lateral,
conduit
placement,
Terrace
Street
city
of
Boston
Three
Sheets
dated
January
27
2023.
K
The
morning
members
of
the
pic,
my
name
is
Erica
Hudson
I'm
from
Siena
Engineering
Group,
representing
Cambridge
Network
Solutions
with
me.
Also
is
my
colleague,
Tom
aggresso.
As
mentioned
the
Cambridge
Network
Solutions
is
seeking
grants
a
location
on
Sarah
Street
to
place
telecommunications
conduit,
starting
at
Summit,
Street
and
Tremont
Street.
We
will
be
breaking
out
of
eversource
manhole
number
4881
and
then
placing
conduit
across
Tremont
Street
to
the
proposed
panhole
in
the
Furnishing
Zone
in
front
of
700
Parker
Street.
K
K
This
section
will
also
consist
of
one
for
in
schedule:
40
PVC,
conduit
and
one
class
desk,
Baby
Shadow.
The
contrast
to
perform
in
this
work
is
aware
that
all
services
will
need
to
be
restored
to
Prior
condition
or
better
also
at
the
new
business.
Two
weeks
ago
the
question
was
raised
that
Tremont
Street
might
be
a
guaranteed
Street.
However,
we
checked
Kovacs
and
no
conflicts
or
found.
If
anyone
has
any
questions,
I
would
be
happy
to
answer
them
at
this
time.
F
L
L
This
application
speaks
permission
to
install
a
four
inch:
vibrant
conduit
along
Washington
Street,
roughly
between
ranfield
Avenue
and
Lawndale
Road.
The
approximate
length
is
1835
linear
feet,
there's
a
short
spur
right
at
Whipple
Road
of
the
addicts,
a
straight
line
for
the
1800
plus
speed.
L
D
Just
a
quick
question:
I
don't
think
it
was.
This
is
a
very
large
project
in
segments
starting
at
Metropolitan,
Avenue
and
I've
been
in
touch
with
Mr
Pinot
Mr
Brynn
separately.
The
question
I
have
is
the
MBTA
and
the
city
have
bus
lanes
here?
Who
is
responsible
for
filling
in
and
remarking
the
MBTA
bus
lane?
Is
that
done
by
extinet
as
part
of
the
project
or
at
the
reverted
back
to
the
city
of
the
MBTA.
M
Hello
hi
folks,
it's
Arthur,
Dennis
that'll
have
to
be
done
by
accident,
we'll
go
coordinate
with
the
MBTA,
certainly
if,
if
the
bus
has
to
be
temporarily,
the
bus
stop
has
to
be
temporarily
relocated
during
construction,
we'll
work
with
them
and
then
all
the
remarking
for
that
path,
be
it
the
MBTA,
crosswalks
or
whatever
that
may
be
done
by
accident,
we'll
take
them.
D
All
right,
wonderful,
thank
you
and
I'll
be
in
touch
separately
for
the
construction
schedule,
so
we
can
give
the
business
Community
a
heads
up.
Thank
you.
Yes,.
A
G
F
All
right,
it's
the
end
of
the
public
hearings
of
new
business,
Cummins,
Highway,
Harbor,
Tree.
J
N
Let
Steven
do
some
himself
shortly
before
kicking
it
off
to
him,
like
I,
wanted
to
provide
a
little
bit
a
little
background
information
on
this
major
project
that
would
not
only
Revitalize
coming
the
common
sideway
quarter,
but
it
both
all
improve
safety
for
all
models
of
Transportation
Cummins
Highway
was
identified
as
a
high
crash
quarter,
based
on
the
volume
of
injury
causing
crashes
that
occurred
between
2015
2017..
N
It
is
among
the
most
crash
prone
quarters
Citywide
and
when
this
reconstruction
project
was
initiated
back
in
October
2018.,
our
main
focus
was
to
address
like
speeding.
I
mean
the
safety
concerns
Alliance
quarter,
in
addition
to
the
traffic
safety
issues
on
the
roadway
and
sidewalks
from
poor
conditioning,
the
existing
lighting
did
not
provide
enough
visibility
at
night
and
the
curb
ramps
were
not
accessible.
N
N
Another
thing
that
I
want
to
point
out
is
that
this
is
this
is
a
significant
investment
in
the
underserved
neighborhood
of
Mattapan
and
from
what
we've
heard
and
gathered
from
the
residents
during
our
engagement
Outreach
process
is
that
this
project
would
be
would
be
a
major
step
in
repairing
the
trust
between
the
city
and
this
Boston
Neighborhood,
especially
if
we
hope
to
implement
more
of
these
transformative
and
quality
quantities.
Life
Improvement
projects
like
this
one.
N
Lastly,
I
would
be
remiss
if
I
didn't
mention
that
huge
credit
needs
to
go
out
to
the
transportation
department
and
the
actual
Transportation
team.
They
were
vital
in
developing
the
design
as
most
and
most
importantly,
developing
the
engagement
process
and
staff
and
strategy
for
the
community
with
that
I'll.
Kick
it
off
to
Steve
and
let
him
introduce
himself
in
the
project.
O
O
This
is
one
of
the
pic
plans
that
we
submitted,
there's
about
eight
or
nine
sheets
to
incorporate
this
whole
4
500
foot
corridor.
Cummins
Highway
was
last
redesigned
in
the
1950s
to
remove
trolley
tracks
and
incorporate
four
travel
Lanes
to
facilitate
faster
vehicle
trips
from
the
suburbs
south
of
Boston
into
the
city.
Recently,
as
Jeff
mentioned,
Cummins
highways
developed
into
the
one
of
those
crashed
phone
corridors
in
the
city,
with
vehicles
being
significantly
higher
than
the
25
mile
an
hour.
O
The
project
goals
would
reduce
these
vehicle
speeds,
improve
safety
and
accessibility
from
all
modes
of
travel
and
create
a
Greener,
more
sustainable
comets.
Highway
input
and
feedback
from
the
community
was
vital
to
developing
the
project
design
and
the
project
team.
As
Jeff
mentioned
with
the
leader
from
BTD,
the
public
works,
we
performed
extensive
public
Outreach
over
two.
O
The
results
of
the
demonstration
clearly
indicated
that
the
reduction
in
the
travel
Lanes
would
not
significantly
or
at
all
increase
the
delay
in
constructing
congestion
along
the
boil.
The
work
involved,
which
is
shown
here
on
these
drawings-
and
this
is
I'll
zoom
in
the
specific
location
of
Cummins
at
Greenfield
and
waipasa,
where
we
have
proposed
to
install
a
roundabout.
This
is
an
unsignalized
intersection
today
very
wide,
open
and
very
very
dangerous.
So
this
will
definitely
slow
Vehicles
down
here.
O
The
working
clothes
includes
full
depth,
roadway
and
construction
of
the
entire
Corridor
removal
of
the
center
median
Island,
and
the
street
lights
will
be
relocated
from
the
center
median
to
the
sidewalks
on
either
side,
Improvement,
improved
drainage
structures,
replacement
of
street
lights,
as
I
mentioned,
replacement
of
three
traffic
signal
signalized
in
sections,
the
installation
of
12
fire
retention
plants
for
storm
water
management
over
80
Street
trees
will
be
installed
along
the
corner.
O
F
Pic
staff
Republic
an
great
Bible
entertain.
Oh
no!
This
is
our
new
business,
so
you
guys
will
be
ready
in
two
weeks.
Well,
four
years
and
two
weeks
from
now
on
on
April
27th.