►
From YouTube: Infrastructure Update, August 2023
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Good
morning,
hello,
I'm,
Walter
Road,
the
infrastructure
program
manager
for
the
city
of
Biloxi
today
is
Thursday
July,
27th
2023
I'm.
Here.
To
give
you
an
update
on
the
FEMA
funded
infrastructure
repair
program
in
the
city
of
Biloxi.
The
infrastructure
program
is
comprised
of
the
repair
of
over
426
000
linear
feet
of
sewer,
Mains
485
000
liter,
feet
of
water,
main
320,
000,
linear,
feet
of
storm
drainage,
the
removal
of
30
sewer,
lift
stations,
three
pair
of
43
additional
lift
stations,
a
replacement
of
over
100
miles
of
Street
Paving.
A
As
of
today,
the
city
has
completed
more
than
280.5
million
of
this
more
than
355
million
dollar
infrastructure
program,
and
currently
the
city
has
41.3
million
in
add
to
construction,
of
which
19.3
million
is
under
construction
in
St
Michael's
project
area.
An
additional
22
million
dollars
is
constructed
in
the
Beaufort
project
area,
which
is
adjacent
to
Highway
90
between
the
bees,
Road
and
veterans.
A
The
Saint
Michael's
project
is
under
general
contractor
knee
case
Brothers
Construction
company
and
is
now
complete
with
a
deep
30
inch
sewer
main
on
Howard
Avenue
from
Oak
Street
to
Holly,
with
Holly
Street,
representing
the
furthest.
Most
West
limits
of
the
St
Michael's
project
DK's
construction
is
now
focused
on
completing
the
installation
of
the
water
and
sanitary
sewer
on
Rosetti
Street,
which
will
be
followed
by
the
installation
of
drainage
on
Rosetti
street,
from
Bonner
to
Howard
Avenue.
A
Additionally,
the
contractors
installing
drainage
on
Mayo
Street,
which
is
behind
the
oral
Keith
Museum,
and
installing
the
drainage
structures
on
Howard
Avenue
between
dory's
and
Claiborne,
and
also
on
Holly
Street
between
Highway
90
and
Howard
Avenue.
This
1082-day
project
is
located
south
of
the
CSX
road
tracks
between
Holly
Street
and
point
today.
Currently,
the
contractor
has
completed
more
than
24.6
million
of
this
43.9
million
dollar
project,
with
work
expected
to
be
complete
in
August
2024.
A
Moreover,
another
crew
installed
the
24
inch
to
remain
between
Ocean
Club
Drive
and
Treasure
Bay
Casino
three
separate
Jack
and
bore
operations
to
install
new
sewer
Mains
near
trigger
Bay
Casino
are
now
complete
and
the
contractor
is
preparing
to
install
500
linear
feet
of
16-inch
diameter
water
main
by
means
of
horizontal
directional
drill.
Additionally,
new
case
construction
continues
to
install
a
new
sewer
main
on
the
service
road
south
of
U.S
Highway
90
near
Treasure,
Bay
Casino.
A
Likewise,
subcontractor
Miller
company
continue
to
install
water
sewage
range
on
brain
drive,
with
the
underground
infrastructure
on
Brady
Drive
expected
to
be
complete
in
September
of
this
year.
This
1095
Day
project
is
located
south
of
the
CSX
railroad
tracks
between
the
bees
and
Veterans
avenue.
Currently,
the
contractors
completed
11.1
million
with
this
33.1
million
dollar
project,
with
work
scheduled
to
be
complete
in
July
of
2025..
A
Drivers
should
expect
the
westbound
right
lane
of
Highway
90
to
be
closed
between
veterans
and
Edgewater
Drive
at
multiple
work
zones
through
August
of
2023
land
closures
near
the
work
zones
require
drivers
to
merge
to
the
inside
Lane
of
Highway.
90.
remember
to
be
mindful,
while
traveling
near
these
work
zones,
reduce
your
speed
and
watch
out
for
construction
trucks
entering
and
leaving
the
work
zones
and
be
alert
to
changes
and
locations
of
lane
closures
along
Highway
90,
as
this
work
proceeds
to
find
out
which
lanes
and
roads
are
closed.
A
Please
visit
the
traffic
page
located
at
the
blue
Banner
at
the
top
of
the
city's
homepage
at
www.bluxy.ms.us
or
for
detailed
maps
of
the
infrastructure
progress
and
to
see
the
previous
updates
of
this
355
million
dollar
infrastructure
restore
program.
Please
visit
the
restore
page
located
at
the
bottom
of
the
resources
column
on
the
right
side
of
the
city's
homepage.
Thank
you.