It
is
the
board's
intention
to
promote,
protect
and
improve
the
health,
safety
and
welfare
of
the
citizens
of
clearwater.
By
providing
this
equitable,
effective
and
inexpensive
method
of
enforcing
certain
codes
within
the
city.
The
board
considers
new
business
items
in
two
parts:
first,
the
violation
and
then
affirmative
relief,
formal
rules
of
evidence
do
not
apply.
Each
side
is
limited
to
15
minutes.
The
board
may
grant
additional
time
all
proceedings
will
be
conducted
in
a
calm
civil
manner.
Individuals
who
conduct
themselves
otherwise
will
be
asked
to
leave
if
necessary,
they
will
be
escorted
from
the
chambers.
A
D
D
The
reason
we're
here
is
over
new
year's
weekend,
the
neighbors
directly
behind
us,
with
our
backyards,
touching
at
30,
51
diamond
head
we're
putting
up
an
an
antenna,
so
we
were
in
the
patio
and
we
started
talking
with
them.
We've
got
antennas,
we've
cut
the
cable,
we've
got
the
antennas
in
the
window
for
our
tvs
and
I
said
to
them.
I've
never
met
the
people
and
I
said
what
is
that,
and
she
said:
oh,
it's,
a
ham,
radio
antenna
and
I
said
well,
what's
that
I
wasn't
really
familiar
so
she
explained.
D
If
all
everything
was
shut
down,
they
could
communicate
and
I
said
oh,
I
thought
it
was
a
tv
antenna,
but
it
ended
as
by
the
end
of
the
day
it
was
probably
45
feet
high
so
that
I
called
and
I've
been
going
around
and
I'm
that's
why
we're
here,
because
I
have
been
emailing
melissa
from
the
planning
demo
department.
I
believe
referred
us
to
dana
and
dana
listened
and
he
sent
out
an
inspector,
and
I
believe
his
name
was
sam.
D
So
then
I
was
referred
to
kevin
in
that
department
and
my
question
was:
did
they
get
a
permit?
Is
it
legal
and
can
you
put
something
up
that
high,
so
this
has
been
going
over
the
last
several
weeks?
In
the
meantime,
we
looked
at
our
hoa
restrictions
and
our
hoa
has
fallen
apart
over
coped.
It's
all
volunteers
and
it
does
say
that
there's
no
structure
can
be
installed
in
the
property
over
25
feet,
and
this
is
obviously
it's.
D
45
feet
and
our
concern
is
because
we're
the
lightning
capital
we
get
all
these
storms
and
it
is
secured
with
some
wire
to
some
like
four
by
four
posts
that
are
higher
than
our
pvc
fence.
So
they're,
maybe
six
and
a
half
feet
up,
and
so
it
is
secured,
but
our
bed
is
probably
well
it's
like
20
feet
from
this
thing.
Well,
what's.
D
A
It
sounds
like
you're
in
the
early
stages
of
this
case
that
that
inspector
has
already
been
assigned,
okay
and
and
is
working
to
figure
out
whether
or
not
this
requires
a
permit
and
or
is
in
violation
of
that.
D
Well,
he
did
get
an
email,
but
he
it
isn't
a
violation
of
that
and
they
were
going
to
contact
them.
I
mean
I
would
really
like
to
know
what's
happening
in
the
meantime,
and
a
lot
of
the
neighbors
are
upset
by
this
big
structure.
There.
A
D
G
D
H
H
This
up,
the
appropriate
people
will
hear
or
are
in
the
room
that
you've
that
you've
mentioned
and
they'll
be
able
to
follow
up
with
you,
but
unfortunately,
this
board
and
this
today's
meeting
wouldn't
be
able
to
address
your
issues.
Okay,
we're
good.
D
I
B
I
B
D
I
E
J
J
Right
and
I
believe
we
told
you
that
there
was
no
limit
on
the
height.
A
K
L
M
L
I
could
pay
what
it
would
cost
for
a
permit
and
I
was
hoping
they
would.
You
would
just
allow
the
carports
to
to
stay
they've
been
there
a
long
time
and
they're
used
for
protection.
I
have
a
couple
of
elderly
gentlemen
that
live
at
the
house
and
it's
good
when
they
come
out
to
have
the
like
an
awning
they're.
Basically
just
a
couple
of
awnings.
L
A
K
K
K
And
mark
did
apply
for
a
permit
and
they
needed
some
revisions.
They
had
some
issues
that
the
corner
of
one
of
the
carports
was
in
the
right-of-way
and
that
would
have
to
be
addressed
as
well
as
he
would
need
engineering
submitted
for
those
carports.
So
that's
kind
of
where
he's
stuck
at
with
that
permit.
That
was
applied
for
and
that's
the
posting
for
today's
hearing,
and
then
this
was
yesterday
actually
day
before,
just
showing
that
they
are
still
there.
K
C
Good
good,
you
said
that
the
carport
infringes
on
the
right-of-way.
K
That's
what
the
notes
that
one
of
the
plans,
the
one
of
the
planners
put
in
yes,
do
we
know
how
much
or
how
many
I
don't
know,
there's
a
20-foot
site
triangle
so
and
it's
a
corner
property,
so
it
can't
infringe
on
that
20-foot
truck
right.
C
K
For
compliance
to
be
met
for
the
stock
work
order
apply
for
obtain
and
complete
the
required
permit,
and
then
we
are
requesting
compliance
on
or
before
february,
26
2022,
for
a
fine
of
150
dollars
per
day
that
the
violation
continues
to
exist
and
any
reasonable
cost
applied
as
liens
against
the
property.
After
three
months
from
the
recreation
data
such
lien,
if
the
fines
fees
remain
unpaid,
the
city
attorney's
office
is
authorized
to
foreclose,
collect
or
settle
such
lien
using
any
legal
or
equitable
remedies
available
under
the
law.
M
Do
you
think
that's
enough
time
to
get
engineered
drawings
for
that?
Permit,
yes,
but.
A
Is
that
what
the
is
that?
What
the
engineering
department
came
back
with,
that
it
needed
engineers,
drawings
or
was.
K
They
said
they
needed,
it
didn't
come
from
the
engineering
department,
it
was
one
of
the
planners,
but
yes,
they
needed
that.
K
Or
something
from
the
manufacturer,
if
it
was,
if
it
was
pre-manufactured,
it
would
already
have
engineered
drawings
that
they
can
submit.
A
Okay,
I'd
like
to
talk
to
mr
couture
know:
if
there's
no
other
questions.
A
A
If
they
granted
the
permit,
then
they
would
have
to
be
rebuilt.
But
are
you
prepared
to
get
those
drawings
to
the
city.
L
Financially,
no
I've
tried
and
a
lot
of
the
engineers
they
want,
something
that
meets
the
code
and
unfortunately,
these
carports
would
just
put
up
just
four
by
fours.
You
know
with
the
canopy
on
top
in
concrete,
so
they're
safe
and
everything,
but
they
they
won't.
They
won't
go
through
all
that
process.
They
won't
make
it
through
all
that
process
of
of
engineering,
drawings
and
and
and
needing
the
code
they
weren't
pre-manufactured,
were
they
no?
No,
no,
no,
they
would
just
put
up.
L
L
But
he
didn't
want
to
come
and
say
say
I
mean
it's
not
an
issue
of
whether
he
likes
it
or
not.
A
N
Yes,
how
long
do
you
think
it
would
take
you
to
be
able
to
get
with
engineering
to
afford
engineering
to
give
you
the
plans.
L
There
are,
there
are
ways
to
get
engineering
plans.
It
doesn't
have
to
always
be
by
an
engineer
right.
A
The
manufacturer
could
could
get
the
permit
for
you
if
you
had
them
installed
by
a
manufacturer
like
a
studio.
L
L
A
matter
of
money
really,
I
mean,
I
think
it's
worth
the
money
to
to
have
the
engineering
drawings.
If
that's
the
only
thing,
stopping
us.
L
So
you
could,
that
could
be
done
and-
and
this
is
a
matter
of
money
or
whatever
and
they
can
be
brought
up
even
jason.
I
talked
I
have
a
contractor
that
helped
me.
We
got
a
survey
first
and
went
through
everything
you
know,
and
it's
it's.
It
says
here
how
far
just
one
of
the
carports
is
encroaching
on
the
right
away
by.
L
I
think
it's
a
foot
and
a
half
too
long,
so
maybe
that
could
be
the
engineering
department
was
very
cooperative
before
they
allowed
the
concrete
that
the
posts
are
in
and
and
so
I
just
paid
a
like
a
permit
fee
and
they're
allowing
them.
So
maybe
maybe
they
they're
very
understanding.
L
I
think.
Wouldn't
it's
not
a
matter
of
it's
just
a
matter
of
talking
to
them.
I've
talked
to
mr
benwell
he's
the
head
of
it
and
then
mr
wagner,
who
set
up
the
the
requirement
to
get
the
permit
to
get
the
engineering
drawings.
He
moved
out
of
the
department
right
he's.
Not
there
anymore,
he's
the
last
contact
I've
had
with
the
engineering
department.
I
did
submit
and
drawings
that
weren't
engineering
drawings,
but
to
see
if
they
were
satisfied,
but
I
didn't
get
any
response
so.
A
L
They
just
have
to
be
an
engineering
drawing
what
my
contractor
john
sulfur's
like
I
was
saying.
He
knows
what
they
would
need
as
far
as
contractual
code
to
bring
them
up.
They
need
some
straps
and
this
and
that-
and
I
think
there
is
something
about
each
post
has
to
be
in
the
foot
of
concrete,
but
I've
seen
places
where
they
had
that.
But
I
didn't
want
to
put
that
because
I
pull
in
to
park.
A
L
That,
okay-
and
I
don't
know
if
that's
going
to
be
possible
because
I
have
been
working
it's
almost
two
years
now,
since
I've
tried
to
to
get
the
carports
permitted.
L
L
L
Okay,
can
you
get
other?
Does
it
have
to
be
an
engineer
to
get
an
engineering
drawing
or
because
I've
googled
it
and
I
see
they're,
very
complex
engines
matter
of
fact
I
don't
know
if
my
the
carports
would
pass
an
engineering
drawing
see.
That's
the
thing
I
had
tried
to
get
people
out
to
the
property
to
see
them,
and
I
don't
know
if.
K
So
he
could
have
an
architect
or
an
engineer
come
up
with
those
drawings
and
they
would
come
up
with
a
drawing
based
on
how
it's
built
and
then
also
to
have
it
in
the
right
position
in
regard
to
the
right-of-way
and
then
then
he
could
get
the
permit
and
then
those
changes
could
be
made.
Okay,
fantastic.
F
K
K
A
O
A
P
You
doing
jerry
robinson,
my
address
is
2323
mary
6th
street
largo.
P
Yes,
there
is
violation.
I
agree.
A
Q
Okay
good
afternoon,
would
you
like
to
hear
the
full
case
he
was
he
just
kind
of
found
out
about
the
violation,
so
maybe
print
to
go
through
it
quickly?
Okay,
thank.
I
M
Q
Q
This
is
the
photo
of
the
property
that
we're
discussing
on
9
16.
When
I
drove
by
noticed
that
there
was
debris
on
the
roof,
a
closer
look,
there
is
damage
to
the
roof
as
well
took
a
close-up
there.
There's
an
old
tarp
as
well
as
some
plywood,
covering
up
a
hole
in
the
porch
roof
tried
to
make
contact.
Q
Q
Q
Recommendation
is
for
the
roof,
maintenance
and
clean
roof
requesting
compliance
within
30
days
of
today's
hearing
or
a
fine
of
150
per
day.
For
each
day,
the
violation
continues
to
exist
after
three
months
from
the
recordation
date
of
such
lien.
If
the
fines
and
fees
remain
unpaid,
the
city's
attorney's
office
is
authorized
to
foreclose,
collect
or
settle
such
liens,
using
any
legal
or
equitable
remedies
available
under
the
law.
P
So
the
property
is
in
my
mother's
estate,
she's
no
longer
with
us,
my
brother's,
an
overseer.
He
lives
in
quebec.
P
There's
five
of
us
and
my
younger
brother
was
living
in
the
property
and
we
assumed
you
know
he
was
going
to
do
what
it
took
to
maintain
the
property
but
come
to
find
out.
He
didn't
do
that.
P
He
left
his
significant
other
was
aware
of
it,
and
then
it
was
just
brought
to
my
attention
this
year
when
it
was
posted
on
the
on
the
door.
My
other
brother
went
by
the
house
and
that's
when
we
were
made
aware
of
the
violation
and
that
you
know
it
was
a
a
cold
thing
with
the
city
I
contacted
lorenzo
and
that's
my
brother
that
lives
in
canada.
P
A
Okay,
well,
since
it
is
already
before
us,
a
lot
of
time
has
already
passed
and
I
think
the
recommendation
was
30
days.
Is
that
what
it
was?
Yes
do
you
think
30
days
is
going
to
be
enough
time
for
you
to
get
that
roof
repaired.
A
A
M
All
right,
so
I
moved
to
enter
an
order
requiring
the
respondent
to
correct
the
violations
on
or
before
february
26
2022.
The
respondent
does
not
comply
by
that
date.
The
board
may
or
may
150
per
day
per
violation
for
each
day.
Each
violation
continues
to
exist
if
the
fines
and
fees
remain
unpaid.
Three
months
after
such
lien
is
filed,
the
city
is
authorized
to
foreclose,
collect
or
settle
such
lean.
Q
H
Q
Okay,
compliance
can
be
met
for
roof
maintenance
and
a
clean
roof
by
maintaining
the
roof
in
a
safe
and
watertight
condition,
keep
the
roof
clean,
mildew,
free
and
clear
of
trash
and
debris
or
any
other
element.
That
is
not
a
permanent
part
of
the
building
or
a
functional
element
of
its
mechanical
or
electrical
system,
and
a
permit
may
be
required.
Q
C
A
Okay
next
case
case,
0-1-22
finds
responded
to
eugene
and
nadia
sanguinetti
at
3460
countryside,
boulevard
number
65
in
violation
of
code
for
residential
residential
rental
business
tax
receipt.
Is
there
anyone.
G
Here
to
speak
on
this
case,
there
is
not
good
afternoon
board.
Julie,
phillips
just
wanted
to
let
you
know.
Yes,
this
was
for
business
tax
receipt.
They
are
currently
in
compliance,
so
I'll
be
requesting
a
declaration
of
violation.
M
I
moved
to
find
the
respondent
was
in
violation
of
the
code,
as
referred
to
in
the
epidural.
In
this
case
the
virus
was
corrected
prior
to
today's
hearing
and
to
enter
an
order
that
no
fine
be
imposed.
If
the
responder
repeats
the
violation,
the
board
might
order
a
fine
of
up
to
five
hundred
dollars
for
each
day.
The
violation
continues
to
exist.
A
R
There's
one
violation
here
for
unpaved
grant
area
parking
requesting
compliance
are
before
february
1st
of
2022
or
a
fine
of
150
per
day
per
violation.
For
each
day.
The
violations
continue
to
exist,
asking
the
board
to
authorize
the
following
after
three
months
from
the
recordation
date
of
such
lien.
R
Yeah
in
all,
honestly,
all
I
got
to
do
is
just
move
the
cars
onto
the
actual.
It's
a
garage
and
the
gentleman
who
owns
the
property
keeps
cars
in
the
garage,
but
for
some
vehicles
just
feels
like
parking
them
in
the
yard.
Instead,
are
they
allowed
to
have
the
one
car
along
the
side
and
it's
a
commercial
location?
So
it's
more
of
a
no
unpaid
parking
issue,
not
a
not
a
residential
area.
M
I
moved
to
enter
an
order
requiring
the
respondent
to
correct
the
violations
on
or
before
february
1st
2022.
If
the
respondent
does
not
comply
by
that
date,
the
board
may
order
a
fine
of
150
per
day
per
violation
for
each
day.
Each
violation
continues
to
exist
if
the
fines
and
fees
remain
unpaid.
After
three
months
such
lean
is
filed,
the
city
is
authorized
to
foreclose,
collect
or
settle
such
leave.
A
second.
A
R
F
Oh
okay,
okay,
I
moved
to
find
the
respondent
wasn't
violation
of
the
code
as
referred
to
in
the
affidavit.
In
this
case
the
violation
was
corrected
prior
to
today's
hearing
and
to
enter
an
order
that
no
fine
be
imposed.
If
the
respondent
repeats
the
violation,
the
board
may
order
a
fine
of
up
to
five
hundred
dollars.
For
each
day.
The
violation
continues
to
exist
at.
M
A
H
Right
so
the
first
meeting
of
the
year
is
when,
in
your
rules
where
you
nominate
a
chair
and
a
vice
chair,
so
if
you
would
like
to
provide
nominations
and
then
we'll
take
a
motion
for
the
chair
still
want
the
job
so
just
to-
and
I
I
know,
there's
a
new-
we
had
a
chair,
the
chair
had
to
resign
the
board.
Ms
bray
was
nominated
and
accepted
the
chair
halfway
through
this
year
and
just
by
four
rules.
You
do
this
once.
A
O
H
F
A
Yeah,
but
we
can't
vote
her
in
if
she's,
not
here,
oh
we
can.
She
can
that's
her
punishment.
I
think
that's
how
she
got
there.
The
first
time.
A
M
Order
finding
the
respondent,
in
violation
of
the
code
and
requiring
the
respondent
to
correct
the
violations
within
five
days
in
the
board's
written
order,
the
respondent
does
not
comply
within
the
time
specified.
The
city
may
take
all
reasonable
actions,
including
entry
onto
the
property
domain
to
abate
and
maintain
the
nuisance
in
charge
and
charge
the
respondent
with
the
reasonable
cost,
which
will
become
a
lien
on
the
property.
If
costs,
fines
and
fees
remain
unpaid.
Three
months
after
city
is
to
foreclose,
collect
or
settle
such
lane.