From YouTube: 12/14/21 Little Bay waterline meeting
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
Okay,
thank
you.
Let
me
minimize.
A
A
Design
engineer,
project
manager,
construction
guru,
so
they'll
both
be
here
to
give
you
an.
A
Overview
of
the
project
virtually
making
sure
technically
we're
coming
through.
A
A
Like
to
have
questions
first
from
those
fishery
people
with
those
questions,
be
their
regulators
or.
A
A
Down
into
durham
crosses
at
emory
farm
and
then
under
route
4
into
the
durham's
wagon
hill
farm.
A
A
A
A
Of
finalizing
what
we
hope
will
be
a
permit
for
us
to
be
able
to
go
to
bed
next
summer
and.
A
This
time
next
year,
constructing
so
with
that,
I'm
going
to
turn
it
over
to
darren
and
britt
and.
A
And
zach,
just
let
me
know
for
coming
through
good
he's
listening
to
us
out
there
and
we'll.
A
Try
to
speak
into
our
microphones
and
again,
please
hold
your
questions
till
after
the
presentation.
A
Which
will
probably
only
take
about
10
minutes
and
then
we'll
we'll
take
take
questions
after
that.
B
Well,
thank
you
brian.
This
is
darren
at
wright,
pierce.
C
All
right,
thank
you.
If
I'm
not
speaking
out
enough.
C
So
this
map
here
shows
the
general
project
area,
as
brian
mentioned,
in
between.
C
Durham,
land
and
fox
point
and.
C
Proposed
pipeline
area
in
the
black
line
and
then
the
blue.
A
A
Will
look
at
chat,
it
would
be
a
good
place
for
people
to
start
putting
questions
in
the.
A
C
C
In
the
pipe
and
it's
estimated
that
sexual
loss
might
be
as
much
as
50
percent.
C
And
then
also,
as
as
brian
mentioned,
the
valves
on
either
side
of
the
pipeline
on
the
shore.
C
Are
inoperable
so
if,
if
there
was
a
any
kind
of
emergency,
it
does
make
it
difficult.
C
To
separate
isolate
one
of
those
lines
so
for
that
reason.
C
We're
showing
a
new
24-inch
pipeline
that's
been
installed
in
between
two
existing
pipelines.
C
That
would
happen
outside
of
the
water.
The
area
that
you
see
on
here
from.
C
Blue
is
the
area
where
we're
proposing
to
bury
the
new
pipeline
and
then
in
between.
C
Our
contract
documents
for
the
project
are
going
to
cover
include
a
number
of
requirements
that.
C
C
Results
contractors
approach
to
completing
the
work,
but
the
current
anticipated
schedule.
C
Is
to
finalize
the
design
permitting
this
winter
bidding
in
june
of
2022.
D
Okay
and
fred,
I'm
sorry,
I
could
not
hear
some
of
the
words
in
your
sentences.
D
And
you
had
stated
that
you
would
be
floating
or
something
would
be
floating
out
into
the.
D
Waterway,
I
think
you
had
a
picture
of
a
berm,
but
I
I
need
you
to
fill
in
what
the
rest
of
that.
D
Sentence
was,
thank
you
sure,
and
I
apologize.
I
hope
you
can
hear
me
now
marcia.
I
think
that
when.
C
I
mentioned
floating
something
out
that
was
in
relation
to
a
slide.
We
had
up
there
with
an
actual.
C
Be
pulled
out
into
the
bay
moved
into
position,
and
then
it's
it's
actually
filled
with
water
and.
C
Is
a
relatively
quick
process
in
relation
to
the
rest
of
the
project?
The
intent
is
not.
B
Sorry
this
is
this
is
darren
it
right
here
in
general,
when,
when
we
do
this
many
times
the.
B
B
And
we'll
probably
install
three
1
000
foot
pieces
with
and
then
quickly
during
one
or
two
days.
E
Hi
brian
mark
kelvo
here,
yes,
I
was
wondering
if,
if
someone
could
go
over
the
schedule
again,.
E
I
that
the
slide
that
showed
the
schedule
came
down
before
I
was
able
to
get
it
all.
E
And
related
to
that,
will
we
be
able
to
get
a
pdf
of
the
slides.
A
And
permitting
it
is
still
yet
to
come,
will
be,
I
believe,
a
final
it'll
have
to
be
a
public.
A
Meeting,
which
will
be
a
second
zoom,
more
official,
I
guess,
including
the
regulators.
A
B
A
A
A
B
E
What
is
the
time
period
within
which
you
would
need
access
to
my
client's
property.
B
B
D
Are
the
two
issues
continuing
speech
noise
and
how
long
it
takes
to
install
that
cofferdam.
B
So
my
this
is
darren
again
right,
pierce.
My
conversations
with
fleming
is
one.
B
Of
the
installers
that
builds
this
type
of
system,
first
of
all,
as
far
as
noise,
the.
B
Doesn't
have
quite
the
impact
of
the
noise
that
the
old
pounding
pile
drivers
had
so.
B
B
The
cofferdam
installation
to
take
four
or
five
weeks
with
the
trestle
and
proper
dam.
B
D
If
I
can
have
a
follow-up
on
the
cofferdam,
what
months,
then,
are
we
looking
at
for
that.
A
Okay,
see
if
we
anybody
else
immune,
if
you
have
any
other
questions
out
there
yeah.
This
is
brian.
F
F
How
those
are
contained,
that
is,
an
area
that
you
get
a
pretty
good
swirl
on
an
incoming.
F
F
My
farm,
so
I
guess
the
question
is,
how
am
I
going
to
know
if
there
is
a
water
quality.
C
C
Apologies,
so
we
are
going
to
be
requiring
the
contractor
to
do
daily,
turbidity
monitoring
so.
C
To
to
minimize
that
that
change
in
turbidity
and
then
in
terms
of
actual
water
quality,.
C
C
And
then
you
know
during
construction,
two
or
if
we
were
to
have
some
kind
of
a
water
quality.
G
G
A
Okay,
all
right!
Well,
I
do
have
we
have
everyone's
contact
information.
A
A
All
right
everyone
thank
you
much
for
attending
and
have
a
good,
safe
holiday
and
we'll
perhaps.