Description
3.8.2023 Islington St. Project Phase 2A Public Pre-Construction Meeting
A
Street
project
for
the
city
of
portsmouth,
all
the
team
members,
except
for
the.
A
Project
representative,
that's
from
underwood,
is
here
he's
e6
he's
at
home,
he'll
be
able
to.
A
A
In
the
other
white
shirt
over
here
is
eric.
Eby
is
the
city's
traffic
engineer
for
those.
A
The
project
manager
for
the
engineer
that
we
hired,
which
is
underwood
engineering
to
his
right.
A
A
A
A
So
he's
the
very
most
important
guy
I
know
he'll
be
the
guy
on
on
scene.
Doing
all
the
all.
A
The
work
so,
as
you
know,
we've
been
working
on
these
retreat
project
now,
for
probably
four
or.
A
A
A
On
the
other
side
of
bypass,
and
then
we
started
the
from
the
bypass
and
we
did
the
first
year.
A
A
Completely
replaced
as
part
of
this
they'll
be
there'll,
be
a
mass
star,
so
they
actually
go.
A
In
your
face
in
the
afternoon
on
those
fall
days,
you'll
be
able
to
see
the
traffic
signals.
A
Were
nice
enough
to
give
us
an
easement,
so
we
could
create
a
new
foundation.
So
all
the
traffic.
A
Contract
for
cleveland
park,
so
this
project
also
includes
a
facelift
to
the
entrance
to.
A
Goodwin
park
and
the
reason
why
we
did
that
is
we're
changing
goodwin
park.
Subtly
there's.
A
A
A
In
the
grass
right
now,
that'll
be
completely
encompassed
in
a
brick
walkway
that
goes
right
up.
A
To
the
main
monument
in
the
middle
and
then
we're
putting
in
some
baller
lights,
so
we're.
A
Increasing
some
of
the
lighting
in
the
park
too,
to
make
it
a
little
safer
in
the
park
at
night.
A
So
that
being
said,
that's
kind
of
a
scope
of
the
project
you
I've
introduced,
the
team
matt.
A
Is
going
to
go
through
the
powerpoint
presentation
that
should
basically
give
you
most
of
the
data.
A
A
We'll
go
through
the
question
and
answer
portion
after
matt
gives
us
presentation.
Thank
you.
B
Project
team,
if
we
did
the
limits
of
work,
where
we're
going,
what
we're
doing.
B
Be
starting
how
long
we're
going
to
be
going
for
with
the
traffic
patterns.
B
For
underwood
it'll
be
myself
as
project
manager,
katie
canela,
she's,
watching
from
home
right.
B
B
And
then
dan
rochette
will
be
the
technical
support
back
at
the
office
for
us.
B
B
B
B
So
this
year,
oh
this
goes
over
phase
two
in
its
entirety,
so
that
is
from
dover
to
cornwall.
B
B
We'll
be
getting
into
sewer
installation
that'll
be
done.
First,
that's
going
to
start.
B
Stable
base
and
then
a
new,
paving
roadway
and
then
as
well
as
goodwin
park
sometime
this
summer,.
B
B
B
B
B
So
this
is
what
you
can
expect
to
see
if
you're
out
there
walking
around
picture
on
the
left
is
the
sewer
main
being
installed.
B
This
is
what
you
can
expect
to
see,
depending
on
how
far
we
go
up.
B
Graphic
patterns,
this
will
be
one
lane
alternating.
There
won't
be
a
detour
in
place.
B
Two-Way
traffic
will
be
restored
to
night
time.
There
will
be
flaggers
out
there
to
help.
B
Distribution
of
public
information,
door-to-door,
brad
and
roger
will
be
out
there
every
day.
B
Social
media
page
for
the
city
of
portsmouth,
their
twitter,
their
project
webpage
and
an
email.
C
D
Cool
yeah
and
I
think
that
yeah
this
is,
you
can
follow
that
link.
If
you,
you
know,
go.
B
A
Okay,
so
I
just
want
to
go
over
sequence
and
why
things
are
done
the
way
they
are.
A
So
when
the
city's
rebuilding
a
road
like
this,
we
obviously
it's
not
obvious.
A
They
went
down
the
hill
from
you,
know,
blackberry
blocks
and
all
that
stuff.
That.
A
Temporary,
by
avoid
pipes
on
display,
you
know
laying
on
the
sidewalk,
so
severino
will
start.
A
A
So
that's
the
reason
why
we're
doing
that
when
you're
replacing
utilities
on
the
ground,
it's
kind.
A
A
A
A
A
A
A
A
Side
and
then
just
for
the
layperson
boxing,
the
road
means
that
basically
we're
going
to
take
the.
A
A
A
A
A
A
A
F
A
A
A
A
A
G
G
G
G
G
G
Street
side:
yeah
yeah,
okay,
yeah;
yes,
when
the
drainage
system
sister
and
gets
to
you.
A
A
Soil
and
hits
the
soil
is
underneath
that
water
can't
be
over.
Can
we
pump
it.
G
A
H
H
H
A
F
Yes,
sir,
I
john
dirk
and
I
own
a
property
at
392
and
394
as
it
did
reached
on
the.
A
Addressed
in
the
construction
process,
or
is
that
something
I
need
to
contract
someone
else.
A
A
H
A
K
A
Good
question:
we
didn't
bring
that
up.
We
are
planting
several
trees
in
the
workshop.
K
L
L
Looks
great
so
far
so
good.
The
only
thing
that
I
noticed
last
time
when
islington
street
went.
L
To
one
lane
is
that
state
street
became
an
interesting
driving
experience,
so
I
was
hoping.
A
J
It's
relatively
new,
oh
across
from
no
across
from
building,
no
just
just
the
brick
strip.
C
Yeah
the
goldman's
did
you
have
another
question.
F
No,
we
just
forgot
to
take
our
hand
down
sorry,
okay,
that
was
me
too
true.
Okay,
so.
I
I
mean
our
building
needs
a
lot
of
work
just
in
general.
I
didn't
know
that
that
sidewalk
section.
I
Is
going
to
be
bumped
out
further
right
or
inside
gonna
stay
the
way
it
is
getting.
E
To
scott
oh
yeah,
scott
yeah,
and
so
some
of
the
brick
to
the
granite
curve
stays
above.
J
The
same
location
goes
up
and
down
a
couple:
inches
five
foot,
sidewalk
and
then
kind.
I
A
Swollen
house,
not
that
not
the
houses
that
are
right
hand
is
all
their
water
goes
on
the
back.
A
A
A
A
A
E
E
E
You
guys
to
try
to
accommodate
that.
You
know
rogers,
like
I
said,
roger's
obviously
out
there.
E
Every
day,
brad
from
our
offices
out
there
today
and
if
there's
any
questions,
concerns
whatever.
E
E
Or
so,
depending
on
where
it
is
so,
don't
don't
hesitate
to
reach
out
to
the
people
on
site
and.
A
A
couple
of
majority
of
the
ones
in
the
first
page,
some
sometimes.
A
A
And
yeah,
if
you
have
a
gallon,
I
explained
you
should
replace
it
and
the
only
reason
the.
A
Will
grow
rust
so
if
you
have
a
rusty
pipe
coming
through
your
wall,
now
is
the
time.
A
To
replace
that
and
get
rid
of
that
because
when
when
it
does
blow
it's
pretty
usually
it's.
A
A
A
This
first
phase
or
phase
2a
or
2b,
which
hasn't
been
awarded
yet
just
make
sure
you
get
over.