►
From YouTube: Development Review Committee 6-25-2021
Description
Development Review Committee 6-25-2021
A
B
B
No
next
I'll
entertain
a
motion
for
approval
of
the
minutes
from
the
june
11th
meeting
motion
to
approve
the
minutes.
Second,
have
a
motion
and
second
any
discussion.
If
not
all
those
in
favor
opposed
motion
carries
first
order
of
business
is
drc
03-2021
parkside
puna,
gorda
llc?
B
B
697
city
of
pentagorda
for
the
clubhouse
is
1883
dollars.
20
cents,
charlotte
county
based
on
297
dwelling
units
at
12,
43
per
unit
369
171.00
and
the
clubhouse
is
based
on
4
280
square
feet
under
air.
Is
nine
thousand
sixty
five
dollars
four
cents
again.
The
address
is
two
six
one:
two
zero
airport
road.
Please
do
not
assign
any
unit
numbers
without
direction
of
fire
and
zoning.
We
will
assign
those
unit
numbers
at
time
of
construction,
so
the
pd
site
plan,
which
was
approved
had
a
driveway
connection
to
the
vacant
property
to
the
east.
B
This
driveway
connection,
which
was
a
sign
possibly
gated,
is
mark
future.
The
driveway
connection
was
a
requirement
for
the
approved
plan,
development
development
proposal
and
the
connection
should
be
installed
with
the
temporary
removable,
bollards
and
or
gate
to
restrict
access
to
the
currently
vacant
lot.
The
bollards
will
need
to
be
decorative
and
be
removed
with
any
gate
becoming
operative
at
such
time
that
the
now
vacant
lands
to
the
east
are
developed.
B
All
exterior
bollards
do
require
decorative
sleeves.
The
optional
six
foot
fence
shown
on
the
plans
not
are
not
part
of
this
review.
However,
fences
along
front
and
side
yards
can
be
a
maximum
of
four
feet.
In
height
fences
along
rear,
rear
property
can
be
six
feet
in
height.
The
fence
must
be
decorative
in
nature
chain
link
fence
material
is
not
permitted,
no
dimensions
are
given
for
building
separation.
B
Please
provide
the
material
and
specifications
for
the
trash
compactor
gates.
What
is
the
finish
of
the
metal
handrails
and
the
guardrails?
Are
there
any
exterior
lights
proposed
if
yes
provide
a
photometric
plan
along
with
images?
Specifications
of
the
proposed
lighting
fixtures,
including
wall
mounted
fixtures
proposed
above
ground?
Propane
tank
will
be
required
to
be
screened
from
view
with
landscaping,
fencing
or
combination
of
both
provide
dimensions
of
each
building.
B
There
are
currently
sidewalks
which
service
the
north
side
of
jones
loop.
Road
staff
is
requiring
accessible
pedestrian
connections
from
the
proposed
development
to
the
existing
sidewalks
street
trees
along
jones.
Loop
road
are
required
unless
a
letter
is
submitted
from
charlotte
county
right-of-way
division,
which
would
not
permit
street
trees
in
this
location.
B
B
We
find
the
total
property
is
missing:
28,
trees
and
1126
shrubs
for
parking
perimeter
and
street
trees.
There
must
be
one
tree
for
every
100,
linear
feet
and
shrubs
are
required.
35
shrubs
for
every
100
linear
feet,
the
school
concurrency
application
has
been
sent
and
the
concurrency
letter
was
received
and
forwarded
to
jerry
waxler.
A
Claire
evil,
thanks
engineering
hi
good
morning,
you've
had
conversations
with
brian.
C
A
Okay,
so
basically
you,
as
you
know,
there
are
several
comments
and
you've
had
conversations
with
them
directly.
So
beyond
today's
meeting
I'd
request,
I
I
believe
per
the
last
email
that
you
were
going
to
have
revised
plan
sent
in.
We
have
not
seen
them,
so
I'm
going
to
request
that
you
follow
back
up
with
him.
Please.
D
C
Yes,
I
just
had
a
couple
quick
questions
linda
on
the
dumpster,
we're
proposing
to
do
a
compactor.
D
A
Well,
that's
part
of
sanitation
and
hope
pet
kiss
isn't
present.
I
don't
believe
I'm
not
certain
what
their
requirements
are
for
a
compactor
lisa.
I
saw
you
shake
your
head.
B
In
the
past,
compactors
are
not
serviced
by
the
city
of
punta
gorda.
We
just
do
rear
low
dumpster
trucks.
You
would
have
to
have
an
outside
company,
but
again,
like
linda,
said,
verify
with
hope.
She
is
our
sanitation
supervisor.
C
C
Linda
on
the
the
connection
of
the
sidewalk
to
jones
loop,
we
had
proposed
a
connection.
I
don't
know
if
you
saw
it
on
there
or
not,
but
it
runs
through
and
around
the
amenities
center.
Would
that
be
sufficient
or
were
you
looking
for
something
different.
C
C
Yeah
we
have
it
out
to
we
have
it
out
to
jones
loop
road
and
it
runs
through
and
around
the
amenity
center,
all
the
way
into
the
site.
So
the
whole
site
has
access.
C
We
have
approval
on
the
turn
lane
and
the
right
of
way
and
we've
also
followed
up
and
submitted
stormwater
application
with
the
county.
So
that's
on
a
review
now.
B
B
B
A
And
lisa
one
question:
when
he
does
the
revised
plans
relating
to
addressing
all
the
comments,
does
it
go
through?
Does
it
go
through
the
same
process
through
drc
and
then
gets
kicked
out
to
everybody?
No,
no.
B
He
works
individually
with
each
department
to
give
them
what
their
deficiencies
are.
He
will
sit.
He
will
give
you
what
you
need
for
your
revised
plans.
He'll
give
us
what
we
need
for
our
revised
plans,
the
same
with
utilities
or
building
or
fire
or
anything
it's
each
individual.
We
don't,
we
don't
get
it
and
then
distribute
it
again.
That's
why
we
don't
do
a
continuance.
A
Okay,
so
as
of
today,
we
haven't
received
the
revised
plans
and
as
long
as
when
you
go
to
building
that
everything
is
submitted
accordingly,
correct
randy.
I'm
sorry.