From YouTube: Development Review Committee June 23rd, 2023
Description
Development Review Committee June 23rd, 2023
B
B
If
not
the
June
9th
meeting
minutes
will
be
distributed
by
the
city
clerk.
We
do
have
the
May
26
DRC
meeting
minutes
in
the
packet
I'll
entertain
a
motion
to
approve
those
motion.
D
B
B
No
address
assignments
for
the
unit
numbers
needs
to
take
place
at
this
time.
That
will
be
done
by
zoning
in
the
fire
marshal
if
any
exterior
lighting
is
proposed.
A
photometric
plan,
along
with
specifications
and
product
images
for
all
fixtures
and
pulses
required.
B
The
12-foot
sidewalk
needs
to
connect
to
the
existing
sidewalk
on
the
Southeast
corner
of
the
property
set
back
from
the
sidewalk
easement
to
building
one
needs
to
be
called
out.
25
foot
maximum
per
PD
02-2021
Heights
must
be
called
out
from
base
flood
elevation
for
all
proposed
buildings.
Mechanical
equipment
needs
to
be
screened
from
view
from
any
Street
or
adjacent
property.
B
B
So,
as
you
come
in
the
buildings
to
the
left
or
to
the
West,
we
will
need
the
building.
Separation
has
to
be
half
the
building
height
or
10
feet.
Whichever
is
greater
and
without
the
building
height
we
could
not
determine
if
that
was
acceptable.
So
those
are
zoning
and
urban
designs
comments
and
we'll
go
through
the
board
building.
D
Yeah
I
just
got
one
little
issue
with
a
typo
on
some
paperwork.
It's
showing
a
a
e
elevation
and
it's
all
that
property
is
a
nine
AE
elevation.
Flood
elevation.
E
Public
Works
comments
were
entered
into
the
staff
report.
We
have
no
additional
comments
at
this
time.
F
Good
morning
for
the
record,
Todd
Rebel
with
Banks
Engineering,
happy
Friday
everybody.
So
our
only
we
did
receive
all
staff
comments
and
we
don't
have
any
major
concerns.
Point
of
clarification
on
the
one
about
the
lot
split
request,
so
the
Punta
Gorda
housing
department
Authority,
will
maintain
ownership
of
the
property.
There
will
be
a
land
lease
to
our
client,
so
there
isn't
going
to
be
a
proposed
lot
split.
It's
going
to
yeah.
F
In
there
so
yeah,
okay,
so
just
to
let
you
know,
and
then
the
only
other
comment
was
what
I
talked
to
with
Public
Works,
providing
regarding
the
slopes.
This
property
started,
the
initial
site,
planning
and
funding
requests
for
this
project
started
back
in
late
2018..
Since
then,
there's
been
several
zoning
code
chain,
our
billing
code
changes,
which
requires
one
foot
of
free
board,
plus
a
change
in
FEMA
Maps
as
you're
all
aware
of
so
literally
the
same
project,
but
just
as
you
know,
the
phase
three
of
the
Verandas
project.
F
These
buildings
will
be
three
feet
higher
than
the
adjacent
property,
so
part
of
the
problem
with
that
is
you
got
to
tie
back
down,
and
so
our
slopes
exceeded
the
four
to
one
which
is
per
code.
I
did
have
an
opportunity
to
talk
to
Brian,
Clemens
and
Ron
everetts
regarding
this,
and
so
we're
requesting
that,
under
their
provision
of
allowing
slopes
below
four
to
one,
but
no
less
than
three
to
one
to
be
allowed
as
part
of
a
community
goal
to
have
affordable
housing.
So
that's
that's
our
own
main
question
in.
E
B
B
B
B
Next
order
of
business
is
drc06
2023
200
a
Kia
sta.
So
this
is
a
project
for
18
units.
It's
his
own
Neighborhood
Center,
fair
share
impact
fees
are
calculated
at
time
a
building
permit
cities.
Fees
are
based
on
square
footage
under
air
for
each
dwelling
unit.
We
did
not
have
that
on
the
plan,
so
we
could
not
calculate
the
fair
share
impact
fees
for
the
city
of
Punta
Gorda,
there's
a
previous
single-family
structure
on
the
site.
B
So
if
you'll
contact
Charlotte
County
property
appraiser,
they
may
be
able
to
give
you
what
that
square
footage
is.
So
you
would
get
credit
for
that.
One
one
unit,
basically
Charlotte
County
Fair
Share
impact
fees
are
calculated
again
at
building
some
metal.
The
approximate
calculations
are
22.49
per
dwelling
unit
times
18
units,
forty
thousand
four
hundred
eighty
two
dollars
that
does
not
include
the
credit
for
a
previous
structure.
B
Again
addressing
of
the
units
will
take
place
with
fire
and
Zoning.
Don't
please
don't
assign
any
addresses
to
your
units,
so
Urban
Design
additional
comments.
A
survey
less
than
one
year
old
must
be
provided.
The
northern
building
has
a
proposed
Street
setback
of
9.5
feet.
Minimum
Street
yard
setback
is
10
feet.
Setback
between
buildings
must
be
half
the
building,
height,
provide
material,
finish
specifications
for
the
proposed
bicycle
racks,
provide
dumpster
enclosure
and
gate
specification
and
product
images,
provide
width
of
the
proposed
driveway
at
the
property
line.
B
Call
out
the
distance
of
the
proposed
driveway
from
intersecting
right-of-way
lines
at
the
corner
of
a
Kia
style
and
Ames
Street
call
out
mechanical
equipment,
locations
and
method
of
screening
from
view
from
any
Street
or
adjacent
property.
Sidewalks
are
required
along
baynard
photometric
plan
must
be
provided
at
a
legible
scale
and
provide
foot
candle
measurements
at
the
property
lines.
1.5
foot
candles
maximum
for
full
cutoff
fixtures.
Fixture
specifications
do
not
appear
to
be
full
cut
off
proposed.
B
Buildings
are
not
compliant
with
the
applicable
provisions
of
article
7,
including
the
following
section:
7.2
architectural
style,
section,
7.4,
parent,
a
parent,
3
and
parent
four
section,
7.4
parent,
B
parent,
one
parent,
two
and
parent
eight,
and
the
landscape
plan
has
been
approved
as
submitted
the
school
concurrency
application.
While
it
was
submitted,
you
have
to
pay
the
fee
to
the
school
board,
provide
us
with
a
receipt
for
that,
and
then
we
can
submit
that
to
the
school
board.
So
those
are
all
of
Urban
Design
comments,
we'll
start
with
building.
E
Public
Works
comments
have
all
been
entered
into
the
staff
report
and
we
have
no
additional
comments.
Okay,.
C
B
G
We
did
receive
the
staff
comments
we
received
Steve
Steve's
comments,
we're
working
on
those
and
we
will
be
submitting
there
shortly
for
your
review.
The
only
there's
a
couple
comments,
I
or
a
questions
I
had
regarding
Urban,
Development
and
I
think
they
all
they
mainly
have
to
do
with
what
we're
considering
the
frontage
of
the
building,
we're
considering
the
frontage
of
the
building
facing
the
parking
lot
that
you
can
see
mostly
from
Akia,
stop.
Okay,.
B
G
B
G
G
G
B
Do
yes,
it
is
okay,
absolutely
we
have
an
application
form.
It
runs
through
the
public
works
department.
They'll
tell
you
what
that
fee
is
for
the
for
those
particular
that
area
for
the
sidewalks
and
it'll
be
up
to
the
developer.
If
that's
how
he
wants
to
to
do
it,
but
we
know
others
that
have
done
it
in
the
same
fashion.
Okay,.
G
G
A
similar
situation,
the
last
project,
where
we're
having
a
hard
time
making
these
slopes
work
and
fitting
a
bike
rack,
a
full
bike,
rack
for
all
18
units,
is
proving
to
be
challenging.
You.
B
B
E
G
G
That
I
think
that
was
I
think
those
were
my
main
questions.
I
think
everything
else
were
we're
going.
B
Okay,
so
again
we
send
the
silent.
You
have
three
months
from
today's
date
to
get
all
the
signatures
resubmit
to
all
the
Departments
individually
and
get
their
signatures
once
you
get
all
the
signatures,
you
bring
this
with
CAD
deliverable
with
all
the
new
plans.
All
the
revised
plans
to
our
office
you'll
get
your
approval
letter.
Then
you
can
submit
for
building
construction
plans
for
your
building,
permit
no
site
work,
no
clearing
filling
or
anything
until
you
get
an
actual
building
permit
in
hand
understood.
Okay,
thank
you.
Seth!
Well,.