From YouTube: Public Improvement Commission Hearings 9-26-19
Description
The Boston Public Improvement Commission (PIC) is the owner and regulator of the City's rights of way. The PIC plays an integral role in the City's development and permitting process. From the restaurant that wants to add a seasonal cafe on the public sidewalk, to the developer who wants to construct an underground parking garage for a new housing development, or the homeowner who wants to add an architectural feature to a house that juts into the public space, each must seek approval from the PIC to have its private venture occupy public space, either permanently or on a licensed basis.
A
A
A
A
A
You
good
morning
like
to
call
to
order
the
public,
Improvement
Commission
hearing
of
September
26
2019,
our
first
item
of
the
hearing
minutes
of
the
requests,
the
public
Improvement
Commission
staff,
the
acceptance,
the
minutes
of
the
pse
hearing
held
on
September
12
2019,
any
questions
or
comments
on
the
hearing,
aids
all
right,
I'll,
entertain.
A
motion
on
this
item.
A
A
Moved
moving
on
to
our
public
hearing
continued
section.
Our
first
item
is
on
a
petition
by
at
the
Stonybrook
LLC
for
the
making
of
specific
repairs
within
the
following
public
ways
in
West
Roxbury,
consisting
of
card
realignment,
sidewalk
and
pedestrian
rap
reconstruction,
as
well
as
new
and
relocated
specialty,
pavement,
Street
trees
and
driveway.
Curb
curb
cuts
locations
are
Washington
Street
on
the
north
westerly
side
that
addressed
a
number
31
93
northeast
of
Montebello
Road
in
Montebello
Road
as
North
East
Side
northwest
of
Washington
Street.
C
A
David
Wright
so
moved.
We've
got
to
our
next
item
on
a
petition
by
lob
associates
LLC,
doing
businesses,
five
horses,
taverns
South
End
for
the
granting
of
a
sidewalk
cafe
license
for
seasonal
outdoor
seating
within
Columbus
Avenue,
a
public
way
in
Boston
Proper,
located
on
Astor
Northwest
East
Side
at
address
numbers,
533
535
northeast
of
Claremont
park
in
consisting
of
seating
for
forty
four
persons
total
and
approximately
178
square
feet
within
the
public
way.
A
D
D
There
are
some
outstanding
concerns
that
I
think
that
we
need
more
time
to
work
on
I'd
asked
for
more
time
in
consideration
of
this
board,
to
allow
me
to
work
that
out
with
the
Neighborhood
Association
and
some
of
the
abutters
that
we
do
have
tremendous
support
and
in
a
lot
of
areas,
and
we've
done
seven
months
of
outreach
with
the
community,
but
I
think
at
this
point.
The
right
thing
to
do
is
take
some
more
time.
I
do
ask
that
you
know
it
was
very
helpful.
D
A
So
I
appreciate
that
week
the
city
can
be
helpful
in
sort
of
whether
it's
through
the
office
of
neighborhood
services
or
through
the
Public
Works
Department
and
facilitating
conversation.
If
that's
that's,
abuse
of
interest
all
parties,
but
it's
a
question
of
whether
is
your
interest
to
continue
or
interest
or
withdraw
at
this
point.
D
A
F
F
F
F
F
H
F
F
F
F
F
D
F
G
F
J
It
talks
about
an
impromptu
meeting
in
the
hallway
after
the
September
12th
meeting.
The
person
identified
in
that
meeting
is
incorrect.
I
was
the
person
in
that
meeting.
It's
identified
as
an
Hirsch
Fang
advisor
to
the
Claremont
Neighborhood
Association,
which
I
am
NOT.
Just
a
neighbor
I
just
wanted
that
correction,
so
it
didn't
live
forever.
I
would
also
like
to
say:
I
did
not
receive
what's
discussed
in
here
as
a
threat
petulance,
perhaps,
but
not
a
threat
and
I
just
wanted
to
put
that
down.
A
D
That
indicated
a
range
of
1.2
percent
of
our
sales
and
a
year
a
date
most
recently
0.9
percent
of
our
sales
coming
in
after
not
after
10
o'clock,
late-night
business,
so
just
to
kind
of
paint.
The
picture
that,
even
though
we're
called
a
tavern,
were
very
much
a
restaurant
and
we're
very
much
busy
from
6:00
to
8:00
and
after
that
it
tends
to
die
out.
So
I
just
wanted
to
go
on
record
to
say
that
I
appreciate.
A
As
well,
the
average
which
you
guys
have
done
the
analysis
you've
done
as
well
as
the
outreach
and
an
interest
of
the
clare,
my
neighborhood
association,
the
tenants
of
the
building
we
will
be
if
there's
interest
on
both
sides,
real
you're,
going
to
facilitate.
Let's
have
some
conversation
and
with
that
I'll
entertain
a
motion
to
what's
wrong
with
that.
But
yes
make.
K
A
The
public
hearing
portion-
our
first
item
is
on
a
petition
by
fenway
enterprises,
132
Brooklyn,
Avenue
LLC
for
the
discontinuance
of
any
and
all
rights
of
travel.
The
public
may
have
had
within
a
pedestrian
easement
adjacent
to
Kilmarnock
street,
a
public
way
and
Boston
proper
looking
at
us
northeastly
side
northwest
of
Van
Ness
Street.
This
was
new
business
on
September
12
2019,
and
this
is
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
discontinuance
plan,
132,
Brooklyn,
Avenue,
Rock,
Street,
Boston
Proper,
one
sheet
dated
April
5th
2019.
L
We
were
in
front
of
pic
previously
for
the
first
phase
of
the
project,
which
include
included
the
construction
apart
in
front
of
the
building
food.
All
the
reconstruction
of
Brookline
Avenue
was
something
to
pick
actions.
We're
now
proceeding
with
the
next
phase
of
the
project,
which
involves
demolition
of
the
non-historic
sort
of
building
on
the
corner.
That
really.
M
M
E
I
I
D
M
I
I
Key
components
this
product
is
the
widening
of
a
portion
of
the
chemistry
and
to
enable
that
winding,
which
is
again
to
create
the
space
for
additional
vehicular
traveling
within
kill
artery,
as
well
as
a
eastbound
bike
lane.
The
project
is
proposing
to
discontinuance
about
a
12
square.
Foot
area
is
currently
a
national
movement
within
right
away
in
Kumari.
That's
depicted
on
this
plant
here
again.
H
B
Make
a
motion
to
approve
on
a
petition
by
friendly
enterprises,
1:32
four-point
Avenue
LLC
for
the
discontinuance
of
Kilmarnock
Street,
as
shown
on
our
plan
entitled
city
of
Boston
Public
Works,
the
private
engineering
division,
discontinuance
plan
number
132,
Brooklyn,
Avenue,
Kilmarnock,
Street,
Boston
Proper
one.
She
dated
April
5th
2019.
A
A
We
got
to
our
next
date:
I
want
a
petition
by
fenway
enterprises,
132
Brooklyn,
Avenue
LLC
for
the
widening
relocation
of
the
existing
right-of-way
lines
of
Kilmarnock
Street,
a
public
way
and
Boston
Proper,
located
on
us
northeastly
side
between
Brooklyn
Avenue
and
Van
Ness
Street.
This
was
new
business
on
September
12
2019,
and
this
is
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering,
division,
winding
and
relocation
plan
number
132,
Brooklyn,
Avenue,
Kilmarnock,
Street,
Boston
Proper,
one
sheet.
I
I
To
the
the
widened,
c'mon
extry,
the
curve,
the
curve
booth
will
be
one
new
comedy.
The
creation
of
new
bike
lane
that
an
eastbound
as
well
as
vehicular
traveling
and,
in
addition,
the
product
and
s
currently
proposes
planning
to
construct
new
gas,
employs
concrete
sidewalks,
as
well
as
furnishing
sound
like
in
street
lights
and
street
trees.
That
she'll
hear
in
this
plane
with
that
I
can
open
up
again
for
a
question.
E
L
E
E
E
A
I
E
M
A
K
K
A
Moved
moving
on
to
our
next
item,
addressed
by
landmark
center
owner
limited
partnership
for
the
discontinuance
of
any
and
all
rights
to
travel,
the
public
may
have
had
within
the
pedestrian
easement
adjacent
of
Fulton
Street,
a
public
way
and
Boston
Proper
located
at
Southwest,
Lee's,
side,
Northwest
and
Brooklyn
Avenue.
This
was
new
business
on
September
12
2019,
and
this
is
shown
on
a
plan
entitled
city
of
Boston
Public
Works
bar
on
engineering,
division
of
discontinuance
plan
number
201,
Brooklyn,
Avenue
of
Fullerton
Street
Boston
proper
one
sheet
date,
April
5th
2019,.
I
The
breaker
turning
your
head
to
this
plan.
This
is
the
discontinuance
plan
for
an
existing
pedestrian
along
fortune
streets,
existing
curb
line
as
part
of
the
widening
or
the
proposed
widening
on
14th
Street.
The
project
is
currently
proposing
to
extinguish
an
existing
pedestrian
easement
that
is
currently
located
below
private
instruction.
E
M
I
So,
as
mentioned
previously,
the
existing
pedestrian
easement
would
be
extinguished,
and
the
plan
is
to
essentially
wine,
the
curb
to
curb
within
for
industry
and
for
your
request
for
the
pushes
request.
The
the
end
condition
widening
of
the
right
one
sultanate
and
integers,
rather
than
a
few
inches
off
of
an
integer,
for
example.
So,
in
the
end
condition,
the
proposed
curve
line
is
going
to
be
pulled
toward
the
same
inward
for
the
Landmark
Center
site
and
a
new
destination
will
be
established
in
part
of
this
piece.
A
K
A
motion
to
approve
a
petition
by
landmark
center
corner
limited
partnership,
but
the
discontinuance
of
any
and
all
rights
to
travel.
The
public
way
may
have
had
within
a
pedestrian
Eastman
adjacent
to
Fullerton
Street
Boston
Proper,
located
on
its
south
westerly
side,
northwest
of
Brookline
Avenue,
as
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
discontinuous
plan,
2:01,
Brookline,
Avenue
bulletin
Street,
Boston
Proper.
Once
she
dated
April
5th
2019.
A
We
got
our
next
time:
I'm
gonna
fishing,
my
landmarks
on
our
own
or
limited
partnership
for
the
widening
and
relocation
of
the
existing
right-of-way
lines
of
Fullerton
Street,
a
public
way
in
Boston
Proper,
located
on
in
southwesterly
side
northwest
of
Brooklyn
Avenue.
This
was
new
business
of
September,
12
2019,
and
this
says
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Roman
engineering
division,
widening
of
relocation
plan
number
201,
Brookline
Avenue
for
to
the
street
Boston
Proper.
Once
she
did
April
5th
2019.
I
Since
the
owner
of
this
parcel
of
land
look
at
here
at
two
one,
four
point
after
this
action
includes
the
reform
of
widening
of
Florida
Street.
The
existing
right-of-way
is
the
front
some
40
feet
in
width.
That's
currently
proposed.
The
final
bill
condition
would
modify
that
with
20
additional
feet
suited
16
additional
needs
of
56
feet
of
total.
I
E
I
A
few
things,
and
just
taking
a
step
back
over
the
past
few
months,
we've
worked
closely
with
the
city
to
define
the
appropriate
with
the
forum
history
and
what
this
accommodates
is
an
additional
additional
space
within
the
vehicular
zone
to
create
a
westbound
bike
lane,
as
well
as
additional
capacity
within
the
street.
The
curb
to
curb
area
for
truck
maneuvers,
for
example,
fire
truck
access
to
in
frontal
industry.
I
H
H
A
K
A
motion
to
approve
a
petition
by
landmark
center
owner
limited
partnership
with
a
widening
and
relocation
of
the
existing
right-of-way
lines
of
Fullerton
Street
Boston
Proper,
located
on
south
westerly
side,
northwest
of
Brookline
Avenue,
as
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department
engineering,
division,
widening
and
relocation
plan.
2:01,
Brookline,
Avenue
bulletin
street
Boston
Proper.
When
she
dated
April
5th
2019.
A
Moving
on
to
our
next
item
on
a
petition
by
landmark
center
limited
partnership
for
the
acceptance
of
pedestrian
easement
at
Jason,
a
Fulton
Street
in
the
public
way
and
Boston
Proper
located
on
the
southwest
side
northwest
of
Brooklyn
Avenue.
This
was
new
business
on
September
12
2019.
This
is
shown
on
a
plan
entitled
city
of
Boston
Public
Works
from
engineering
division,
pedestrian
easement
plan
number
201,
Brookline,
Avenue
and
Fullerton
Street
Boston
Proper.
Once
she
dated
April
5th
2019.
I
I'm
also
accompanied
by
my
clients
and
with
associates.
They
are
the
owner
of
this
parcel
here
at
Landmark,
Center
to
a-1
Kirkland
Avenue,
in
addition
to
widening
14th
Street
as
part
of
this
proposal
and
also
extinguishing
in
existing
pedestrian
easement,
the
project
is
proposing
to
establish
a
new
pedestrian
easement
along
the
new
concrete
sidewalks.
This
would
be
located
along
the
back
of
sidewalk
and
also
sandwiched
between
the
furnishing
zone
and
the
building.
I
Tear
of
the
person
previous
wiping
so
currently
the
design
includes
balconies
that
are
extending
or
encroaching
upon
the
airspace
over
this
pedestrian
easement.
However,
those
balconies
have
been
studied
fairly
closely
and
the
elevation
from
the
ground
surface
to
the
underside
of
the
lowest
balconies
approximately
at
169
feet.
So
in
discussion
with
ISD
we've
been
clear
to
essentially
establish
that
the
best
amusement
and
no
further
improvements
within
that
airspace.
So.
M
It
depends
men,
it's
a
surface
easement,
so
it
doesn't
matter
what's
underneath
it,
because,
if
we're
never
putting
anything
in
there,
we're
just
giving
the
surface
rights
of
pens
to
travel
and
the
reason
that
this
wasn't
part
of
the
widening
is
to
do
our
building
encroachment
over
this
section.
So.
E
H
A
A
I
Hb
I'm
here
with
associates
the
owner
of
both
201
work,
one
and
132
per
client
Avenue,
in
addition
to
widening
Fulton
Street,
widening
a
portion
of
Kim
marnik
Street.
The
project
is
proposing
a
handful
of
streetscape
improvements
which
discuss
courtesy
but
include
essentially
new
castaways,
concrete
sidewalks
along
14th
Street
and,
unfortunately,
the
commonness
treatment,
as
well
as
ancillary
improvements
at
the
intersection
of
performing
tomorrow
country,
including
pedestrian
ramp
upgrades,
as
well
as
signal
improvement,
upgrades
one
item
to
note,
which
has
been
coronated
closer.
I
We
think
this
bullet
Commission
is
the
replacement
of
the
trading
of
existing
pedestrian
ramps.
At
this
intersection,
for
example,
the
existing
ramps
are
the
apex
style
ramps
in
working
with
Sarah
Leon
from
the
disability
Commission
at
Patricia
Bennie's.
We
opted
to
redefine
this
intersection
a
bit
and
replace
those
existing
non-compliant
graphs
with
compliant
accessible
pedestrian
in.
I
I
I
The
curb
cut
area
for
both
loading
and
garage
access
to
the
building,
one
of
the
thing
that
we
coordinate
closely
with
the
Transportation
Department,
was
the
curb
realignment
along
Brooklyn
Avenue.
It's
our
understanding
that
the
student
has
plans
for
our
future
bus,
only
slash
bike
lane
within
the
limits
of
Brookline
acting
so
as
part
of
this
proposal,
the
project
is
proposing
to
such
a
shift.
The
easterly
curb
line
along
Brookline
torn
the
Builder
along
replied
to
accommodate
the
future
bus
and
bike
lanes
within
that
space,
with.
A
I
H
I
The
street,
under
the
existing
conditions,
extremely
difficult
for
a
fire
truck
to
come
down
for
history,
Toronto,
Brooklyn
and
alternately
turn
onto
Florida
Street
from
and
with
the
both
of
the
building
being
pulled
back
toward
the
site
and
the
curve
also
being
shifted
toward
Landmark
Center
site.
We
thought
that
you
know,
as
currently
included
that
design
that
it
made
sense
also
modify
that
Corinne
is
know.
It's
important
to
note
that,
as
part
of
our
tappa
agreement,
that's
been
negotiated
with
btv
mr.
Brady
assisted
feet
in
death.
We.
G
A
G
H
I
It's
a
good
question
because
we're
widening
forces
of
concern
and
forestry.
The
signal
equipment
which
includes
two
masked
arms,
are
going
to
pack
it
so
as
part
of
the
current
design,
which
has
been
coordinated
with
the
design
folks
at
the
civil
department
at
btv,
the
we're
basically
proposing
new
masters
at
the
intersection.
What
a
position
of
the
corner
point
super
to
a
one
additional
in.
E
H
H
P
A
K
Pavement
bike
racks
feet,
light
speed,
trees,
irrigation
infrastructure,
storm
drain
of
the
structure,
traffic
signal
destruction,
driveway
cutouts,
as
described
in
red
in
the
record
by
the
chair,
as
shown
on
a
set
of
plans
entitled
City
Boston
Public
Works,
Department
engineering
division,
specific
repair
plan
to
a
one-book
light.
Now
bulletins
feet
were
playing
out
in
Kilmarnock
Street
Washington
proper
she'd
stayed
at
April
5th,
2018.
A
In
addition,
by
105
West,
first
Street
owner
LLC
for
the
granting
of
an
earth
retention
license
for
the
installation
of
a
temporary
core
support
system
within
West,
second
Street,
a
public
way
in
South
Boston,
located
on
its
northeast
east
side
of
the
rear
of
105
West,
first
Street
generally
north
west
of
the
South
Boston
all
Road.
This
was
new
business
on
September
12
29.
A
Q
Morning,
my
name
is
Steve
Morris
I'm,
a
representative
Tishman
Speyer,
who
are
presenting
her
the
owner,
105
West,
first
Street
and
presenting
the
earth
retention
license
along
West
second
Street,
which
is
being
requested
in
order
to
construct
our
below
grade
foundational
wall
along
that
front.
Thank.
R
You,
my
name,
is
Debra
danik
I
work
at
niche
engineering
representing
the
105
West
first
Street
owner
also
with
us.
We
have
Lee
vans,
lair
of
Haley
&
Aldrich
she's,
the
geotechnical
engineer
on
the
project
and
prepared
the
earth
support
plan
we're
here,
requesting
a
temporary
earth
support
license
for
West
second
Street.
Previously
this
project
was
reviewed
and
approved
in
2017.
At
that
point,
we
requested
earth
support
on
West
first
Street,
which
is
the
other
side
of
the
building.
R
Since
then,
the
building
design
has
advanced
and
changed
such
that
the
building
basement
foundation
has
moved
closer
to
West,
second
Street.
So
that's
why
we're
requesting
an
earth
support
license?
This
is
the
plan,
so
a
couple
quick
follow-ups
from
our
hearing.
One
of
them
was
that
you
can
see
that
we're
right
next
to
the
South,
Boston
bypass
road
and
then
the
bridge
that
goes
over,
that
on
West.
Second
Street.
R
H
R
E
S
S
S
R
R
T
So,
just
to
reiterate
what
with
them
and
Steve
have
spoken
about,
and
also
what
we
had
discussed
during
the
new
business
hearing
a
couple
weeks
ago,
the
below-grade
excavation
for
105
West,
first
Street,
will
extend
up
to
the
property
line
which
will
require
in
order
to
enable
the
below
grade
excavation
a
supportive
excavation
system
which
extends
out
within
the
sidewalk
and
into
the
public
space.
The
supportive
excavation
system
is
intended
to
consist
of
soldier
piles
in
timber
lagging
and
due
to
the
depth
of
excavation
will
require
internal
bracing.
T
In
order
to
support
that
portion
of
the
site.
The
internal
bracing
is
intended
to
consist
of
steel
breakers,
which
will
extend
from
a
whaler
installed
along
the
supportive
excavation
system
on
West
second
Street
into
the
site.
All
elements
of
the
internal
bracing
will
be
removed
and
we
request
to
cut
the
supportive
excavation
system
to
no
less
than
six
feet
below
site
grades.
At
the
completion
of
construction,
the
blow
guard
space
will
extend
down
through
fill
play
soils
and
into
the
natural
glacial
soils.
E
E
A
A
A
K
I
make
the
motion
to
approve
a
petition
by
105
West,
first
feed
own
LLC,
for
the
granting
of
an
oath
retention
license
for
the
installation
of
a
temporary
earth
support
system
within
West.
Second
Street
South
Bronx
been
located
and
that's
what
we
still
inside
at
the
rear
of
105
was
the
first
Street
generally
north
west
of
the
South
wasp
and
haul
road,
as
shown
on
a
plan
entitled
city
of
Washington,
Public,
Works,
Department
engineering
division
licenses
for
temporary
earth
retention
plan,
West.
Second
Street
105
West,
first
Street
Boston,
when
she
dated
July
2018.
A
Our
next
item
is
on
a
petition
by
one
Newcomb
street
LLC
for
the
durham
vertical
discontinuance
of
a
portion
of
Nukem
3d
public
way
at
Boston,
Proper,
Loki
and
us
northeast
resided
address
number
one
generally
south
east
of
Washington
Street
vertically
above
the
grade
of
the
sidewalk.
This
was
new
business
on
September
12
2019.
This
has
shown
on
a
plan
entitled
city
of
Boston,
Public,
Works,
Department,.
H
U
All
my
name
is
Matt
I
am
an
attorney
Gerald
Stano,
the
business
address
of
15
Broad
Street
here
in
Boston,
with
mayonnaise
dojo
to
Gangi
on
behalf
of
one
Newcomb
Street,
as
mentioned
we're
seeking
a
vertical
discontinuance
at
one
Newcomb
Street,
and
just
a
quick
reminder
from
our
new
business
hearing.
By
way
of
brief
background,
this
request
is
being
made
in
conjunction
with
the
residential
development
at
one
Newcomb
Street.
The
project
contains
23
residential
units
in
a
six
story.
U
U
B
A
Next,
I
don't
want
up
dition
by
charter
development
for
the
making
of
specific
repairs
within
maverick
Street,
a
public
way
in
East
Boston
located
in
southwest
Eastside
at
address
numbers
195
205
generally
across
be
frank
with
street
and
consisting
of
curb
sidewalk
and
pedestrian
ramp
reconstruction,
as
well
as
new
and
relocated
street
trees
and
driveway.
Curb
cuts
was
new
business
on
September,
12
2019
and
says
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering
division,
specific
repair
plan,
195,
205,
maverick
Street,
East
Boston.
She
said
June
13th
2019
morning.
O
Frankie,
learn
from
each
to
be
more
associate
civil
engineers.
Maybe
today
is
the
engine
from
he's
a
project
architect
from
BH,
plus
a
just
to
summarize
the
project
as
an
existing
one-story
commercial
building
on
the
property.
Today
that
is
proposed
to
be
demolished
and
replaced
with
a
new
five-story
mixed-use
building
comprised
of
ground-floor
retail
and
residential
house
have
been
closed.
Two
through
five.
We
also
was
in
34
on-site
parking
stalls.
A
E
O
M
H
B
I
have
a
comment.
I
know:
I
received
an
email
with
some
updated
plans
that
are
different
from
the
set.
We
just
included
on
our
comment
that
we
wanted
a
Guttermouth
on
the
existing
catch
basin.
Yes,
so
I
just
want
to
verify
that
that
will
be
done
as
part
of
this
project.
Yes,.
O
H
H
K
W
A
Our
next
item
is
on
a
petition
by
the
city
of
Boston
transportation.
Tomorrow
we're
making
a
specific
repairs
within
the
following
intersections
in
Boston
proper,
consisting
of
curb
realignment,
sidewalk
reconstruction
as
well
as
new
and
relocated
pedestrian
ramps,
traffic
signal
under
structure
locations,
our
Beacon
Street
at
Berkeley
Street
at
all
four
corners,
the
intersection
and
Dartmouth
Street
at
Marlborough
Street
at
all
four
corners,
the
intersection.
A
This
was
new
business
on
September
12th
2019
has
shown
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Foreman
engineering
division,
specific
repair
plan,
beacon
streets,
left,
Berkeley,
Street,
Marlborough,
Street,
that's
Dartmouth,
Street,
Back
Bay.
She
said
September,
10th,
2019,
more
closures.
My.
X
The
chief
said
we
were
here
last
session
to
present
some
signalized
intersection
improvements
in
trying
to
implement
both
pedestrian
and
cyclist
improvements
through
the
intersections
we
located
in
a
number
of
underground
issues
that
we
needed
to
rectify
in
the
process.
We
are
improving
the
accessibility
of
the
pedestrian
crossings
at
all
four
corners
for
both
of
the
intersections
and
then
I'll
allow
our
consultant
to
walk
you
through
each
corner.
Y
Y
L
Y
H
Y
We
are
looking
to
replace
current
non-compliance
and
APEC
south-western
wraps
with
four
directional
crosswalks,
with
maybe
a
compliant
curb
ramps
at
this
location.
Comments
that
were
made
at
the
last
meeting
included.
The
handle
locations
which
have
in
this
at
this
location
has
been
shifted
towards
the
back
of
sidewalk
in
consideration
of
existing
utilities.
M
Y
E
E
O
A
X
X
B
So
we
did
have
some
concern
about
the
new
catch
basin.
You
were
proposing
on
Berkeley
Street
on
the
north
side,
and
then
you
were
also
on
Beacon
Street
on
the
east
side,
the
northeast
side.
Rather,
we
just
had
some
concerns
away.
You
had
moved
that
catch
basin,
so
I
was,
you
know,
to
keep
the
catch
base
and
you
could
kind
of
relocate
it
and
then
put
a
drop
Inlet
in
there.
If
you
could
work
with
Dave
Jenny
he's
the
one
that
had
briefed
you
of
this
project.
B
If
you
can
work
with
him
on
those
issues
and
the
other
issue
that
that
the
office
had
was
on
the
note
that
you
provided
about
the
gut
amounts,
we
weren't
clear
on
what
the
intention
was
so
our
intention.
What
we
want
you
to
do
is
actually
the
existing
and
proposed
catch
basins.
All
of
them
need
new,
got
them
out
to
whether
they
are
broken
or
not,
and
then
we
just
want
to
make
sure
that
that's
that's
clear.
Yes,.
Y
X
B
B
E
B
E
B
E
A
K
Make
a
motion
to
approve
a
petition
by
City
Boston
Transportation
Department
for
the
making
one
specific
repairs
within
the
following
intersections
of
Boston
Proper,
consisting
of
curb
realignment,
sidewalk
reconstruction
as
well
as
new
and
relocated
pedestrian
ramps
and
traffic
signal
of
the
structure.
As
the
specific
location
is
read
on
the
record
by
the
chair
and
as
for
the
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public
Works,
Department
engineering
division,
specific
repair
plan,
Beacon
Street,
Berkeley,
Street,
Marlborough,
Street,
Dartmouth,
Street,
Back,
Bay,
two
sheets
dated
September
10th
2018,.
Z
You
commissioners,
for
allowing
this
this
opportunity
to
come
before
you.
As
you
know,
and
on
behalf
of
the
secretary
and
myself,
we
really
appreciate
the
consideration
that
you
have
shown
us
in
making
critical
improvements
to
East
Boston
in
time
for
us
to
receive
federal
funding,
to
put
those
improvements
into
construction
as
it's
a
form
of
public
hearing.
Z
I'll
briefly
provide
a
recap,
as
many
of
you
on
the
Commission
are
aware
of
Chelsea
Street
Bridge
was
redesigned
in
Oakland
in
2012
to
address
the
public
safety
issues
of
the
waterway
users
and
and
since
then,
fortunately,
with
the
redesign,
there
have
been
no
more
incidents
on
the
creek.
The
unfortunate
consequence,
of
course,
was
that
it's
longer,
and
it's
higher
in
that,
has
at
an
adverse
impact
on
roadway
users
and
the
improvements
that
we're
going
to
be
presenting
to
you
today
in
detail
we'll
be
discussing.
Z
G
G
E
E
G
E
You
can
actually,
god
I'm,
actually
get
to
eat
steak.
Okay,
so
that,
may
you
be
able
to
give
some
consideration
because
they
are,
you
can
actually
make
a
choice
and
get
to
the
McCarty
before
the
mikado
goes
up.
This
location,
I
might
tiny
tiny,
tiny
opinion
these
that
you're
sort
of
trapped
that
you
may
not
be
able
to
do
much
so
gives
up.
I
mean
you
folks
need
to
give
that
consideration.
That's
not
for
us
to
locating
the
sign
needs
to
be
in
a
location
where
you
decide
to
be
of
use
other
than
this.
G
Larger
overhead
variable
message
signs
in
addition
to
the
real-time
information
about
the
rich
lives,
had
also
display
an
advanced
warning
when
the
next
life
to
be
predicted
again
the
full
span,
structures
and
typically
use
in
our
material,
but
we've
been
discussed
with
the
various
stakeholders.
Folks
were
ok
with
that.
There
will
always
have
the
opportunity
moving
forward
in
construction.
The
scale
back
but
proposing
this
structure
allows
us
to
have
that
pie,
their
path
of
travel,
a
come-along
viewing
distance,
because
she's
approaching
the
bridge
sick
to
see
that
sign
information,
as
well
as
the
as.
Z
Well
as
her
emergency
evacuation
as
this
an
emergency
evacuation
corridor,
and
it's
important
to
note
that
we're
working
with
the
BPD
a
and
we're
actually
partnering
with
them
on
the
community
meetings
in
East
Boston,
so
we'll
be
going
out
together.
Talking
about
all
of
these
various
improvements
on
the
East
Boston
side,
starting
in
October,
8th
I,
believe.
E
Z
Yeah,
the
purpose
of
that
bridge
is
not
to
deer.
You
it's
to
tell
you
when
the
future
lips
are
happening.
It
has
time
for
when
the
future
lifts
are
happy,
it's
advanced
notification,
not
real-time
notification.
It
can
do
real-time.
The
event,
the
real-time,
the
countdowns
are
the
signs
that
we
talked
about
before.
But
this
is,
as
you
cross
the
bridge
and
you
know,
you're
gonna
have
three
more
lifts
in
the
next
six
hours.
You
will
know
that
when
you
cross
the
bridge-
and
you
can
make
plans
accordingly,.
A
P
Z
E
K
Malik
a
motion
to
approve
a
petition
by
the
Massachusetts
Department
of
Transportation
for
the
making
of
specific
repairs
within
Chelsea
Street
East
Boston,
located
at
address
numbers
481
in
611,
generally
south
of
the
Chelsea
Street
bridge
over
the
Chelsea
river
and
consisting
of
curb
and
sidewalk
reconstruction,
as
well
as
new
traffic
advisory.
Invariable
message
sign
if
the
structure,
as
shown
on
a
set
of
plans
entitled
city
of
Boston,
Public,
Works,
Department
engineering,
division,
specific
repairs,
plan,
East,
Boston,
Chelsea,
Street,
three
sheets
dated
September
2019,.
A
A
AA
Good
morning,
I
remember:
we've
convinced
my
leftist
James
Griffin
santech.
The
project
architect
to
his
left
is
a
Benson
from
Samuel
is
associate,
who
is
Samuels
associates
who
are
working
with
winter
gold,
the
owner
of
the
property
on
the
redevelopment
of
the
doclock
project,
we're
here
to
talk
about
only
two
of
the
four
buildings
that
are
part
of
this.
AA
As
you
may
recall,
at
the
last
meeting,
we
discussed
a
highway
easement
for
a
10-foot
swath
of
the
property
to
allow
for
a
future
widening
and
relocation
of
the
curb
line
of
Dorchester
Avenue
as
a
result
of
that
grant
of
highway
easement
from
the
proponent.
The
proponent
now
has
to
get
licenses
back
from
the
city
for
a
subterranean
footings,
cone,
footings
and
also
for
above-ground
light
fixtures,
awnings
and
the
like.
L
It
meant
insane
as
an
associates.
Just
brief
reminder.
This
is
the
dock
block
projects
on
480
units,
seven
multi
stocks
over
here.
This
is
Dorchester,
have
and
Cox
pretty
Pleasant
Street.
We
are
creating
a
new
connection,
that's
actually
on
private
land
through
the
projects
that
will
connect
to
the
surrounding
neighborhoods
tea
station
and
the
intersection
rebuilds
sidewalks
all
around
the
site.
P
L
L
AB
Thomas,
as
Rebecca
mentioned,
we
are
granting
to
the
the
highway
easement
along
Dorchester,
it's
about
ten
feet
wide
from
the
property
line
to
the
face
of
the
proposed
building.
So
the
two
petitions
before
you
today,
one
is
for
a
vertical
discontinuance
and
that
is
for
a
permanent
below
grade
footings,
continuous
footing
along
this
wall
and
then
column
footings
for
to
support
the
building.
So
this
describes
horizontally
and
vertically,
where
we
need
that
discontinuance,
the
footing
is
three
feet
below
grade,
and
then
it
ranges
from
two
to
five
feet:
six,
depending
on
the
final
design.
AB
For
the
architectural
design,
which
will
include
retail
signage,
signage
lighting,
a
metal
awning,
we
have
banner
signs
and
blade
science
show
horizontally
and
vertically
lighting
sconces.
And
then
you
also
have
architectural
facade
trim
on
the
edges
of
the
building
which
will
extend
into
that
highways.
P
E
E
AB
AB
E
E
M
E
AA
No
traffic
that
exits
the
the
site
to
Dorchester
Avenue,
there's
only
traffic
that
will
make
a
right
turn
into
the
project.
The
traffic
that
exits
out
of
the
project
will
exit
either
on
to
Hancock
Street
or
on
to
Pleasant
Street.
The
25%
design
comments
have
come
back
from
BTD
Howard
Stein
Hudson's
is
in
the
process
of
advancing
that
design
within
the
month.
They'll
have
75%
design
and
then,
at
that
point
in
in
the
coming
weeks,
we'll
be
back
to
the
pic4
approvals
that
related
to
the
intersections.
On
the
other
side
of
Pleasant
Street.
AA
T
AA
E
Could
it
be
what
time
I
forget?
Who
is
the
architect
order?
It
you,
sir,
if
you
can
do
the
service
cop
radiance,
in
such
a
way
where
people
are
discouraged
in
a
major
way
in
either
making
that
lifter
or
coming
out
on
time
the
sites
are
just
a
figment
of
my
imagination.
Has
two
people
trying
to
comply
with
it?
It
becomes
a
very
challenging
situation,
so
you
need
to
do
the
roadway
geometry
so
that
one
really
really
really
needs
to
put
in
an
effort
to
either
coming
to
your
property.
E
M
A
M
A
H
A
A
AB
W
E
AB
M
A
B
AC
I
have
with
me
Jesse
Siegel
from
Haley
&
Aldrich,
do
tech
engineer
in
the
she'll
from
Texas
Tech
Rizzo
civil
engineer.
We
were
actually
before
you
last
December
for
a
temporary
our
support
system
for
milk
and
Olive
Street
assisting
of
slaughter
Mills,
and
that
petition
was
granted
December
20th
of
2018
we've
found
the
we
found
some
severe
utility
conflicts
on
milk
Street.
AC
The
certainly
only
operation
went
fine
along
all
of
the
street,
but
I
do
diligence
on
no-treatment
covered
significant
telephone
stock
banks
and
vaults,
so
the
mid
layer
of
cells
would
not
work
so
our
engineers
investigated
what
are
our
options?
We
could
do
there,
so
they
recommended
some
mini
piles
to
support
the
common
tawa
in
a
temporary
electric
vault
that
we
have
to
build
up
that.
So
the
team
did
an
expensive
exploratory
investigation
of
the
street
with
vac
trucks
and
by
hand
digging.
We
expose
all
the
existing
utilities.
AC
AC
We
then
presented
that
plant
Tod
naming
and
we
also
presented
the
same
plan
to
bus,
Lauren,
Sula,
Boston,
Water
and
Sewer
was
very
pleased
that
the
micropiles
would
take
the
weight
of
the
common
table
platform
and
the
falls
off
the
sidewalk
in
the
street
and
any
utilities
thereof,
and
also
they
were
well
many
of
them,
their
sewers
and
water
lines
and
drain
lines.
So
that
work
was
extensive.
That
took
a
long
time
to
put
those
sleeves
in
place.
AC
So
that's
the
application
before
you.
We
also
sent
this
application
to
all
the
utility
companies
and
we
had
no
negative
comments
back
from
utility
companies
in
this
way.
All
the
records
within
our
current
construction
management
plan
that
was
approved
by
and
tested
last
year
and
our
engineers
and
similarly
I,
can
answer
any
of
your
questions.
E
A
P
AC
Leads
we
found
that
the
sleeves
are
really
the
best
way
to
go,
because
we
were
able
to
expose
all
the
existing
utilities
and
and
I
were
inches
between
some
of
these
utilities
on
milk
Street
to
put
those
sleeves,
and
so
once
them
micro
files
were
installed.
We
knew
exactly
where
they
were
going
to
go.
This.
Q
A
N
A
M
A
E
N
S
B
H
C
Design
consultants
here
in
behalf
of
331
93,
Washington
development.
This
is
just
an
easement
to
go
along
with
the
widening
of
the
sidewalk
and
the
bump-out.
We,
the
building
was
pulled
back
where,
as
the
designers
do
feedback
from
the
property
line,
so
he
widen
the
sidewalk
back
to
the
face
of
building
providing
the
5-foot
wide
yeah.