►
Description
No description was provided for this meeting.
If this is YOUR meeting, an easy way to fix this is to add a description to your video, wherever mtngs.io found it (probably YouTube).
A
A
C
C
That's
right,
that's
correct!
This
is
really
a
recap
of
existing
conditions.
Just
so
we
can
press
upon.
D
It
houses
many
as
as
22
members,
and
it's
it's
not
code
compliant
the
bedrooms
are
substandard
and
a
new
group
is
the
alpha.
Lifetime
has
acquired
this
property
representing
the
alumni
of
Alpha
Phi
Alpha
fertility,
Incorporated,
the
first
black
fraternity,
John
Deere
Cornell,
and
this
is
going
to
be
our
new
home
I'm,
the
architect.
My
name
is
George
Claremont
with
aepmi,
and
we've
been
prior
to
transform
this.
This
property
we're
reducing
the
the
bed,
count
down
to
15.
D
or
15
individual
rooms
to
one
including
a
resident
advisor
down
below,
and
we
are
starting
with
the
front
door
initially.
When
we
started
this
process,
it
was
to
create
a
grand
entry
that
would
be
an
accessible
for
any
visitor,
specifically
some
of
our
aged
alumni
Brothers.
We
do
host
meetings
annually
and
quarterly,
and
this
is
the
place
that
we're
gonna,
be
we
holding
them,
including
housing,
undergraduate
students
co-ed
in
the
summer,
and
if
we
do
not
have
enough
membership,
it's
open
to
the
public.
D
So
we
had
to
bring
the
interior
up
to
standard
onto
code
standards,
but
make
this
accessible,
so
the
front
walk.
D
If
you
can
scroll
down
the
front
walk
and
we
can
go
one
more
down,
there's
a
there's,
a
an
eight
inch
Riser,
the
doors
are,
the
front
door
is
Set
too
far
back
to
be
compliant,
so
the
intent
is
to
regrade
the
front
drive
so
that
it
meets
the
height
of
the
front
step
and
allowing
folks
that
have
issues
ambulating
to
get
into
the
front
foyer
and
we'll
we'll
deal
with
any
kind
of
elevation
changes
within
the
structure
and
accommodate
a
handicap,
lift
just
scroll
down,
here's
the
front
door.
D
It
is
not
handicap
accessible,
I.
Think
we
we
discussed
on
a
prior
Zoom
call
that,
in
order
to
make
you
compliant,
we
would
have
to
detail
a
push
plate
on
the
front
allowing
for
a
door
operator
to
have
the
egress
store
swing
out,
allowing
someone
in
a
wheelchair
to
get
in
as
long
as
we
maintain
the
strike
side
clearance
on
the
inside
of
the
foyer,
and
by
doing
so
we
would
comply
with
accessibility.
We
can
understand
this
scroll
down
now.
D
What
we're
looking
at
here
is
the
rear
condition
we
believe
I,
don't
know
if
there's
any
real
documentation,
though
we
believe,
based
on
the
construction
that
it
was
done
in
the
70s,
and
it
was
a
crude
attempt
to
try
to
match
or
not
match
the
existing.
D
Our
client
wanted
a
more
expensive
experience
down
on
that
level.
This
is
where
we
plan
on
hosting
our
meetings
and
have
access
to
the
to
the
rear
yard.
So
the
thought
is
to
demolish
that
maintain
the
north
footprint
building
line,
but
expand
the
the
the
addition.
The
final
footprint
a
few
feet,
Westward
I,
think
the
the
net
floor
plate
would
be
the
neck
gain.
Is
you
know
about
200
square
feet?
D
D
Okay,
this
is
the
condition
of
the
the
access
to
the
patio
we
intend
to
bump
this
this
out,
but
completely
restore
the
the
exterior
we'd
like
to
bump
it
out
four
or
five
feet:
we're
going
to
go
through
the
plans,
but
we've
documented
that
we've
completely
documented
the
exterior
trim
and
where
it's
where
it
will
be,
instructing
our
bidding
contractors
and
our
Mill
workers
to
save.
What's
there
and
clearly
we're
not
bringing
back
that
that
storm
door
right
we're
not
bringing
back
anything,
that's
that's
in
bad
shape.
D
All
that
exterior
surface
mounted
wiring
will
be
buried
on
the
interior
facing
the
exterior
wall.
So
it
wouldn't
you
know
it
just
wouldn't
direct
that
facade.
D
The
new
edition
would
be
set
21
inches
lower
at
the
slab
level,
allowing
us
to
really
waterproof
that
the
new
Surface,
which
will
be
pencil
pavers
on
top
of
a
membrane
system.
We
plan
on
having
it
occupied
it's
occupied
now,
but
nothing's
compliant
about
it,
you're
actually
walking
on
an
asphalt
roof.
It's
it's
just
the
crew
of
construction.
D
That
one
now
Brian
we
said
we
sent
these
in
prior
to
our
meeting
with
the
site
plan
for
us,
so
the
site
plan
has
changed
a
little
bit.
Okay
and
I
do
have
that
package
in
case
you
want
to
see
the
development
website
do.
E
You
want
to
so
the
commission
received
the
application
application
materials
you
submitted
previously.
Do
you
want
to
walk
through
the
changes
that
you
made
to
that
proposal
now,
so
the
commission
understands
what
the
project
is
today.
Yes,
thank
you,
foreign.
D
If
you
go
up
one
on
the
on
the
directory,
okay
I
know
just
out
of
this
folder.
A
D
Here's
the
existing
condition
got
an
asphalt
Drive.
We
do
have
a
non-compliant
Northeast
parking
lot
and
if
we,
if
it
becomes
cost
prohibitive,
we
may
not
replace
it,
but
the
plan
as
it
stands
is
to
replace
that
with
the
compliance
double
loaded
parking
aisle,
we
plan
on
replacing
the
asphalt
as
we
integrate
and
create
sort
of
like
a
what
you
call
in
several
language
and
apron
so
that
someone
can
get
picked
up
and
dropped
off
at
the
front
meeting
the
front.
The
front
elevation
of
that
that
brick
step
four
point
down.
F
D
D
Machine
that
that
is
a
zoning
issue.
What
you
see
here
is
it's
not
what
we're
presenting
to
the
to
the
to
the
SBR
we,
we
did
achieve
a
handicap
spot
directly
across
the
front
door.
However,
it
is
too
dangerous,
it
doesn't
work,
so
we
went
back
to
the
nose
in
parking
which
is
perpendicular
to
the
to
the
front
yard.
D
Spot
for
the
most
part,
everything
else
has
stayed
the
same,
that
that
graded
sort
of
a
more
thick
organic
shape.
If
you
scroll
down,
that's
going
to
be
pervious
pavers,
a
grassy
type
area.
So
when
we
have
outdoor
Events
and
Tents
set
up.
D
D
Okay,
that's
the
full-on
landscape
plan.
So
if
you
can
imagine
the
nose
in
parking
where
it's
perpendicular
to
the
front
yard
setback,
that's
the
major
difference.
C
D
You
notice
the
UPS,
the
the
the
Northwest.
The
Northeast
lot
is
now
fully
double
loaded
and
we
do
want
to
have
accessible
access
to
the
lower
level
from
the
parking
lot
in
case.
We
do
have
events
down
there.
D
So
that's
another
reason
why
we
we're
going
to
propose
re-milling
and
and
reconstituting
this
lot.
Our
elevations
don't
really
work
as
currently
configured
and
if
we
left
it
the
way
it
was,
we
there'd
be
no
way
we
can
get
a
ramp.
That's
at
the
right
grade
to
the
front
door.
We
need
like
a
40
foot
ramp.
C
D
We've
documented
all
those
windows,
we
have
put
the
window
package
out
to
bid.
We've
got
a
couple
of
restoration
contractors,
I'm
from
a
list
that
that
Brian
provided
us
and
we're
waiting
for
the
quotes.
We
haven't
put
the
setup
documents
completely
to
to
bid.
We
parcel
things
out
simply
because
we
have,
we
don't
have
a
full
permit
set
and
a
permit
to
put
the
entire
package
to
be.
But
you
know
the
windows
are
important.
D
It's
completely
documented
and
the
intent
is
to
restore
them.
The
the
major
difference.
Is
that
not
going
to
be
any
spawn
windows
on
the
outside
we're
going
to
pull
them
on
the
inside?
To
let
the
facade
the
existing
Tower
is
just
going
to
be
completely
restored
any
any
shingles
or
siding
that
are
Beyond
repair
will
be
placed
in
kind.
The
gutter
profiles
the
downspouts
they
will
all
be
replaced
and
kind
with
the
with
the
appropriate
shape.
So
no
new,
fangled
Home
Depot
shapes
for
those.
D
D
That's
the
lower
level.
It
already
had
a
commercial
kitchen,
we're
going
to
take
it
offline
and
make
it
much
smaller
and
have
a
the
lowered
floor.
Slab
actually
gives
us
a
grander
space,
a
better
experience
for
for
those
involved,
the
lower
portion
of
that
plan.
You
can
see
that
there's
an
ADA
lift
and
if
you
go
to
the
first
floor.
D
Right,
so
that's
your
front
entrance
is
is
now
you
know
just
imagine
that
we've
already
achieved
the
rating
slide
into
the
front
door
and
then
we've
got
the
lift
that
could
either
take
you
up.
One
level
to
the
main
floor,
not
one
level
but
21,
inches,
I,
think
and
then
nine
feet
to
get
downstairs
so
that
that
was
the
intent.
And
if
you
look
at
the
North
part
of
that
that
meeting
room
We've
expanded
that.
So
that's
what
you've
seen
in
the
elevations.
D
We
do
have
to
provide
a
second
means
of
egress,
which
is
why
we
have
a
stair
on
the
northeast
corner
of
that
new
edition,
and
that
gives
you
access
to
the
lower
level
patio
and
also
the
the
parking
lots.
D
That's
just
to
further
understand:
what's
going
on
so
we
have
now
we
have.
We
have
sleeping
units
that
are
more
standard
and
less
Grant
and
let's
go
to
the
upper
level.
We
did
have
a
comment.
The
last
time
we
had
the
early
guidance
leading
to
try
to
reduce
the
size
of
these
Dormers,
and
we
didn't
do
that.
We
reduced
these
room
by
you,
know
18
inches
or
so
to
make
the
courses
work.
We
had
to
do
some
some
squeezing
and
reconfiguring,
but
I
think
we
got
it.
D
D
They
have
completely
wood
windows,
you'll,
see
later
that
the
rendering
shows
up
as
black
windows
but
I'm,
not
sure,
if
that's
possible,
with
you
know,
with
their
color
palette,
but
the
the
intent
is
to
use
wood
windows
and
wood
doors
with
the
with
the
with
the
mountain
on
the
exterior,
as
opposed
to
the
you
know,
typical
historic
Light
Window
that
has
the
mountain
bury
within
two
panes
of
black,
so
we're
trying
to
we're
working
with
them
and
they'll
be
energy
efficient
to
keep
the
same
flavor
The
Divided
light
motif
with
the
notes
on
the
front
elevation.
D
It's
just
clean
and
restore
or
remove
replace,
replacing
time
to
to
be
of
note,
all
the
new
roofs
are
going
to
be
slate
to
match
existing
and
again
we're
working
with
a
couple
of
slate
roof,
guys
roof
contractors
and
again
everything
is
a
competitive
bit
we're
having
a
hard
time
you
know
having
to
commit
to
providing
us
real
samples.
The
actual
sample
is
once
they
get
the
job,
they'll
get
the
samples
to
us,
but
we're
working
with
them,
and
they
know
the
scope
of
work.
D
G
D
These
will
be
on
a
traditional
steel
vent.
D
The
materiality
of
the
the
addition
you're
going
to
try
to
do
our
best
to
match
the
the
stucco
below
the
foundation
below
is
different
than
the
sort
of
treated
scallop,
scuffle
scallop
stucco
on
the
upper
levels,
it's
more
of
a
stucco
on
a
concrete
foundation
and
the
old
Edition
tried
to
match,
but
didn't
do
a
good
job
and
we'll
try
to
do
the
same
thing.
D
And
that's
the
building
section
currently,
where
we're
just
working
with
our
Structural
Engineers
and
and
our
civil
engineers
too,
to
make
all
of
the
Interior
work
real.
We
can
see
that
we
lowered
the
slab.
It's
a
it's
just
a
better
feel
for
the
elevation
of
the
kitchen
and
then
there's
started
me.
The
description
of
of
our
pedestal,
paver
system.
G
D
That's
it
and
we
also
have
there's
a
there's:
a
file
called
rear.
Render
the
question
was:
what
does
it
really
look
like,
so
we
thought
we
just
juxtaposed
them
before
in
the
after,
and
you.
D
To
be
some
re-grading,
the
rendering
was
done
before
our
site
plan,
so
the
rendering
has
a
square
patio.
We
have
a
more
a
gentle
one
and
the
gratings
are
a
little
bit
different,
but
the
intent
is
to
wind
up
something
like
that.
D
I
again,
I,
don't
know
if
we
can
achieve
with
the
new
wood
windows.
That
exact
finish,
but
the
manufacturer
knows
what
an
incentives.
F
Let's
see
I
I
was
concerned
about
the
shed
Dormers
in
the
back
just
proportions
and
what
roof
slopes
and
stuff
they
would
have
so
that
the
building
section
that
you
provided
today,
it's
much
better
description
of
that
how
far
I
set
that
from
the
wall
below
and
a
far
down
set
from
the
ridge.
So
that's
been
massaged
a
little
bit.
F
It
looks
like
the
slope
of
the
Dormer
looks
like
it
might
match
the
slope
of
the
bump
out
Bay
coming
out
of
the
gallery
room.
Yes,
that's
good
we're
trying
to
get
close
to
it,
because
I
do
have
questions
those
those
root.
Pitches
are
a
little
probably
too
low
for
slate.
Aren't
they
right
when
you
said
all
the
news
would
be
sleeping.
Yes,.
F
Yeah,
so
the
intention
is
for
that
bump
out
bay
and
for
the
Dormers
development
I
have
slave
roofs,
correct.
F
It's
one
I
just
knows
one
difference
between
the
last
iteration
and
this
one,
and
that
is
the
the
strip
of
tile
windows
on
the
coming
on
basement
multi-purpose
room.
Previously
you
had
transom
windows,
and
now
it
was
like
they're
one
piece:
full
height.
D
They
will
they're
detailed
that
way,
but
I
think
we
have
multiple
units
in
there.
So
there's
still
the
intent
of
having
that
that
upper
transom
read
across
the
map.
F
F
Oh
yeah,
there's
somebody
carved
below
the
windows
that
are
going
to
be
removed
and
put
back
on
five
feet
out.
There's
some
sort
of
Swiss
Alpine,
looking
oh
yeah,
that's
railing
to
stuff
are
these?
Are
those
going
to
be
they're
going
to.
D
F
But
the
you
know
the
shed
dormer's
got
each
one
lasts
like
six
inches
or
something
it
was
enough.
It
was
no
I
think
it
was
11
4
now
they're,
10,
10
or.
F
That
or
each
bedroom
or
something
so
it
you
know,
I
know
that
some
usable
space
inside
your
bedrooms,
also
the
closet
detail,
has
been
changed
a
little
bit
too.
So
the
area
between
the
Norms
goes
back
in
further,
so
I
think
you
know
it's
been
responded
to
like
inserted
them
responded
to
it.
Okay
I've
got
to
turn
that
on.
E
There
were
no
written
comments,
let's
see
for
this
project
this
evening,
and
it
doesn't
look
like
I
mean
unless
either
of
the
two
attendees
would
like
to
speak,
not
shaking.
No,
then
there
were
no
Regis,
no
one
registered
to
speak
for
this
project.
H
I
had
I
just
wanted
to
talk
about
the
entryway
I
mean
I
I
want
to
compliment.
You
I
think
this
proposal
has
has
really
evolved
in
a
wonderful
way,
and
so
I
think
this
was
an
exciting
new
new
era
for
the
facility
and
for
your
organization.
So
I
think
that
that's
wonderful,
I
I
was
wondering
if
you
could
just
walk
me
through
a
little
bit
related
to
the
entryway
in
terms
of.
H
Are
you
or
is
it
the
re-rading
simply
going
to
be
basically
the
driveways
regraded
up
to
the
level
of
the
current
the
current
grade
to
enter
the
building?
Is
that
how
that
is
essentially
the
is
it?
Is
that
what's
going
to
happen,
or
is
it
effectively
an
apron?
That's
going
to
be
created
around.
D
A
D
Right
and
and
the
the
pavers
that
are
below
that
brick
step
we're
going
to
try
to
you,
know
I,
don't
think
we're
going
to
keep
those
right,
but
I
felt
that
it
was
important
that
we
kept
that
that
that
brace
step
within
the
new
construction.
So
when
we
have
whether
it's
stamped
concrete
or
new
paper
new
papers,
we
can
do
some
waterproofing
details
so
that
that
won't
degrade
and
the
intent
obviously
is
to
get
someone
from
that
that
to
that
parking
stall
back
I
mean
directly
into
the
into
the
40.
H
G
D
H
Okay,
that's
great!
Those
are
my
questions
on
the
the
actually
the
project
proposal
than
when
it's
time,
I
just
wanted
to
walk
through
the
conditions
that
you
drafted
in
the
resolution.
So
I
could
understand.
So
we
can
understand
the
process
moving
forward.
E
They
haven't
so
the
conditions
that
are
at
the
end
of
the
the
draft
conditions.
Again,
this
is
a
pick,
your
own
menu
kind
of
thing.
E
They
were
based
on
things
that
I
observed
in
the
application
and
in
areas
where
I
thought,
maybe
additional
detail
might
be
needed
things
like
material
samples
which
we
talked
tonight
a
little
bit
about
presenting
those
with
information
at
a
later
date,
or
you
know,
specifications
for
the
window
restoration.
You
know
when
the
restoration
means
different
things
to
different
people.
E
So,
knowing
specifically,
what's
going
to
happen
to
the
windows,
some
of
them
I
suggested
that
there
would
be
my
staff.
Others
I
suggest
that
they
come
back
to
the
commission
for
review
and
I'm
happy
to
walk
through
the
conditions
with
you
all.
If
you
are
interested
in
that
or
after
we
read
the
resolution,
we
can
get
to
them,
read
them
one
by
one,
and
you
could
say
here.
B
F
G
F
Construction,
two
shed
Dormers
along
the
north
root
slope,
in-kind
replacement,
wood,
shingle,
siding
localized,
in-cut
replacement,
deteriorated
wood
trim,
painting
of
the
exterior
stucco
demolition
of
the
non-historic
one-story
North
addition
and
the
construction
of
an
enlarged,
approximately
150
square
feet.
One
story
addition
in
the
same
location,
expansion
of
the
first
floor,
Gallery
by
48,
inches
to
the
north,
and
maybe
more
than
that.
The
reinstallation
of
existing
trim
in-kind
replacement
of
the
slate
roof
replacement,
building
signage
installation
of
Monument
sign,
and
where
is
the
issuance
of
a
certificate
of
protein?
F
Where
is
the
applicant
has
provided
sufficient
documentation
and
information
to
validate
impacts
to
proposal
on
the
subject,
property
and
surrounding
properties,
and
whereas
a
public
hearing
with
the
purpose
of
considering
approval
of
the
application
for
a
certificate
of
the
Brokenness
was
conducted
at
a
regulated,
they
regularly
scheduled
iopc
meeting
on
November
15
2022.
Now,
though,
therefore
be
resolved
that
the
iopc
has
made
the
following
finest
effect
concerning
the
property
and
the
proposal
it's
identified
in
the
city
of
indica's,
Coronel,
Heights,
historic
district,
summary
statement.
F
As
indicated
in
the
New
York
State
Building
structure
inventory
Forum,
the
two-door
Revival
style
fraternity
house
at
105,
Westbourne
Lane
was
constructed
for
the
Scorpion
chapter
of
the
tower
cap.
Epsilon
returning
between
1927
and
1929.,
instructed
within
the
period
of
significance
of
the
Cornell
Heights
historic
district
and
possessing
a
high
level
of
Integrity
of
the
property,
is
a
contributing
element
of
the
coronal
Heights
historic
district.
F
A
F
Improvements
with
the
District
of
the
neighboring
proven
such
District,
considering
the
architectural
and
cultural
value
of
the
commission
so
consider
whether
the
proposed
change
is
consistent
with
the
historic
value
of
the
spirit
of
the
architectural
style
of
the
landmark
or
District.
In
accordance
with
section
22806
of
the
municipal
code
and
making
this
determination,
the
commission
is
Guided
by
the
principles
set
forth
in
section
two
to
eight
near
Six,
B
of
the
municipal
code.
F
Beaches
are
properly
located
within
and
contribute
to
the
significance
of,
and
start
districts
should
be
altered
as
little
as
possible
and
any
alterations
made
each
other
compatible
with
what
the
historic
character
of
the
individual
property
and
the
character
of
The
District
as
a
whole
principle.
Number
three
new
construction
located
within
the
historic
district
shelving
compatible
with
historic
character
of
The
District
within
which
is
located
standard
number.
Two,
the
historic
character
of
the
property
will
be
retained
and
preserved.
Removal
of
distinctive
materials
or
alteration
of
features
and
spaces
that
characterize
a
property
will
be
avoided.
F
Standard
number,
nine
new
additions,
exterior
alterations
for
related
new
construction
shall
not
destroy
historic
materials
and
characterize
the
property.
The
new
work
shall
be
differentiated
from
the
old
MCB
should
be
compatible
with
the
massing
size,
scale
and
Architectural
features
to
protect
the
historic
Integrity
of
the
property
and
its
environment.
F
Standard
number
10,
new
additions
and
adjacent
or
related
new
construction
shall
be
undertaken
in
such
a
manner
that,
if
removed
in
the
future,
the
essential
form
and
integrity
of
the
historic
property
engine
environment
will
be
unpaired
with
a
bit
to
principle.
Number
two
standard
number
two
and
standard
number:
nine,
the
exterior
Rehabilitation
Rehabilitation
additions
and
slight
improvements.
F
Will
not
remove
distinctive
materials
and
will
not
alter
features
and
spaces
that
characterize
the
product.
I
really
agree
with
that.
Also
respect
to
principle
number
two
principle:
number
three
and
standard
number:
nine
proposed
exterior
Rehabilitation
additions
and
site
improvements
are
compatible
with
a
massing
size,
scale
and
Architectural
features
of
the
properties
environment,
respect
to
standard
number
10.
The
proposed
editions
and
site
improvements
can
be
removed
in
the
future,
without
impairment
of
the
essential
form
and
integrity
of
the
historic
property
for
its
environment.
F
Resolve
the
based
on
designing
set
forth
above
the
proposal
will
not
have
a
substantial
adverse
effect
on
the
aesthetic,
historical
or
architectural
significance
and
the
Cornell
Heights
historic
district.
The
set
portion
section
228
data
6
will
be
further
resolved
that
the
Israel
landmarks
preservation
commission
determines.
The
proposed
needs
criteria
for
approval
under
Section
2
trade-6
of
the
municipal
court
and
be
a
further
resolved
that
the
iot
approves
the
application
for
appropriateness
for
the
following
conditions.
E
All
right,
I
will
walk
through
the
conditions.
The
first
one
when
visiting
the
property
I
noticed
that
it's
unpainted
stucco
currently
and
our
design
standards
state
that
previously
unpainted
based
on
your
materials
should
not
be
painted.
So
there
was
a
condition
that
the
stock
was
cleaned
only
and
not
painted.
E
They
would
they
would
there
are
wine
washes
that
they
could
use,
because
it's
not
it's
a
breathable,
opaque
material
that
is
compatible
with
historic
stuff,
though,
if,
if
you
want
to
consider,
it
sounds
like
if
you
want
to
cross
it'll,
consider
like
a
lime
wash
okay,
instead
of
a
paint
with
commission
members,
we
accept
that.
D
Okay,
that's
that's
right!
So
we're
talking
about
the.
D
G
D
Is
the
international
symbol
for
skeleton
right,
but
if
you
notice
the
the
shingle
gets
painted
and
the
trim
on
the
existing
stucco
gets
painted
and
and
the
rest
is
power
washed,
okay,.
E
I
may
have
read
a
note
on
one
of
the
drawings
that
said
it
would
be
painted.
So,
okay,
if
the
intent
is
to
leave
it
unpainted,
then
we
can
leave
the
condition
and
okay.
You
know
if
it's
a
moot
point.
H
My
my
only
my
as
someone
who
has
a
stucco
house,
my
I
had
a
Greek
Revival
that
they
stuck
out
over
100
years
ago
now
and
I
would
start
with
a
very
gentle
power
wash
because.
A
H
H
Just
a
note,
I'm
sure
you're
well
worth
it
yeah.
If
we
can
leave
that
I
think
that's
I
think
it
makes
sense.
So
we've
just
honestly
for
the
for
the
record.
If
nothing
else.
E
So
the
second
condition
is
about
the
Slate
rule,
so
the
proposal
and
again
this
may
have
been
a
note
on
one
of
the
drawings,
but
it
seemed
that
the
whole
roof
slate
roof
would
be
replaced.
But
from
your
presentation
this
evening
it
seems
like
it's
only
a
new
slate
roof
on
the
Dormers
and
the
rest
of
the
slave
roof
will
be
repaired.
Yes,
so
if
that's
the
intent
I'm,
we
can
remove
this.
E
The
reason
why
I
added
it
is
in
the
past,
when
we've
got
a
slate
roof,
that
someone
has
wanted
to
wholesale
replace.
We
require
documentation
of
the
condition
and
there
wasn't
that
documentation
here
to
replace
the
whole
roof.
So
if
you,
if
the
intent
is
not
to
replace
the
whole
roof,
then
we
can
remove
that
position.
D
E
It's
the
the
next
suggested
condition
the
restoration
of
the
primary
engine
store.
So
you
said,
you're
restoring
the
door,
but
again
restoration
sometimes
means
different
things
to
different
people.
So
you
know
refinishing
the
door.
Are
you
keeping
the
existing
Hardware,
which
is
a
historic
part
of
that
entry
door?
Or
you
do
you
have
to
replace
the
hardware
as
part
of
the
Ada
upgrade
no.
D
E
So
we
talked
about
the
the
patio
and
it
was
Illustrated
in
the
rendering
and
the
site
plan.
But
there
weren't
details
on
the
materials
kind
of
looked
like
there
was
a
lower
tanning
wall
that
was
associated
with
that
patio.
So
my
recommendation
for
conditioning
was
just
including
a
return
visit
to
the
iltc,
with
information
on
those
paving
materials
and
retaining
wall
materials.
That's.
D
D
We
are
getting
to
that
to
that
level
in
anticipation
of
our
our
spr
meeting,
which
is
on
the
agenda.
E
E
Then
similar,
you
proposed
the
monument
sign,
but
there
weren't
material
details
for.
G
E
So
it's
just
the
same
thing
and
then
this
is
a
standard
one
that
we
use
for
new
windows
and
doors,
just
cut
sheets
that
are
reviewed
by
staff.
For
you
know
the
proposed
materials
and
let's
see
the
the
restoration
of
the
window,
as
we
talked
about
that,
what
a
condition
for
staff
to
review
that
scope
of
work
that
you
get
from
the
selector
contractor
to
make
sure
that
by
restoring
the
windows
they're,
not
removing
all
of
the
historic
fabric.
Equations.
E
F
F
H
D
Parking
and
it's
just
the
the
the
number
of
masks
that
we're
gonna,
you
know
expanding
of
the
Northwest,
the
Northeast
parking
lot,
the
existed
one
in
addition
to
the
nose
in
parking,
and
then
this
you
know,
although
we're
replacing
the
existing
asphalt,
we
are
the
existing
impervious
side.
Condition
is
not
conforming,
it
does
exceed
what
zoning
arrives.
Okay,
so
that's
part
of
the
that's
part
of
the
set.
C
E
One
other
condition
that
I
was
just
thinking
of,
as
you
were
talking
about,
the
parking
space
is
the
pervious
paving
yes,
and
in
our
pre-application
meeting
you
mentioned
benches
around
that
previous
area
and
those
are
amazingly
benches.
Correct.
G
E
A
H
H
It,
okay,
so
it
might
be
worth
I,
was
putting
I,
can
not
even
necessarily
condition
per
se,
but
something
in
our
resolution
about
that,
because
traditionally,
the
ilpc
has
been
pretty
opposed
to
front
parking
on
other
properties,
and
it
might
be
helpful
for
the
BCA
to
recognize
that
we're
okaying
this
because
of
the
nature
of
the
request,
as
well
as
the
screening
capacity
or
if
it's
reading
component
as
well.
F
G
A
G
B
D
Did
speak
to
Mike
at
the
building
department
and
if
we
describe
the
material
scope
of
demolition,
but
we
don't
expect
to
get
site
to
win
a
BCA
approval
to
this
as
we
realistic
end
of
January.
G
C
D
A
D
A
D
D
A
E
E
To
him
too,
okay,
thank
you
George,
so
so
it
is
just
Michael.
J
J
I
J
F
There's
about
a
about
a
20-second
delay,
looping
going
on
so
I
think
they're
trying
to
work
on
that.
Oh.
J
A
F
I
A
A
G
J
E
A
F
F
J
Okay,
so
just
go
ahead
and
present
yes,
okay,
I'll
try
to
be
brief,
so
this
is
711
East
Seneca
Street,
the
the
structures
on
the
corner
of
North
Quarry
in
East
Seneca
see
site
plan.
Here
were
basically
it's
an
existing.
You
know
three-story
building
over
a
basement,
so
it's
for
for
technical
stories,
but
you
sort
of
perceive
three
stories
from
the
street.
J
We
are
looking
at
expanding
the
habitable
space
into
the
existing
I'll.
Call
it
the
first
floor
unit
over
top
of
the
basement,
to
take
a
look
at
some
quick,
existing
photos.
J
This
image
is
from
the
corner
of
Corey
and
Seneca,
so
you
can
see
the
existing
building.
This
is
the
floor.
We're
looking
at
expanding
it's
this
beige,
clapboard
siding
if
yeah
the
the
side
of
the
building
on
Seneca
is
actually
screened
pretty
heavily
by
this
existing
Bush
line
and
existing
mature
trees
further
down
the
hill,
so
you
sort
of
have
to
creep
on
to
the
next
property
before
you
can
get
a
real
clear
view
of
the
porch
we're
looking
at
expanding
into.
J
So
this
image
shows
the
porch
it's
over
top
of
the
basement
floor
and
the
existing
Upper
Floor
roof
and
unit
kind
of
expand
out
over
the
porch
space.
Already.
J
Looking
at
a
quick
set
of
floor
plans,
I
believe
yeah.
These
are
the
existing
plans.
So
this
is
the
basement
unit
on
the
left,
so
we're
looking
at
the
primarily
the
the
first
floor
unit.
The
existing
porch
is
here:
there's
it's
an
existing
one
bedroom
unit
or
sorry
existing
two-bedroom
unit
with
a
large
living
space,
and
so
the
proposed
floor
plan
basically
expands
into
this
porch
to
create
three
new
bedrooms.
J
J
If
you
can
see
on
the
the
proposed
rendering
the
plan
is
to
basically
remove
the
existing
railings
construct,
our
new
exterior
wall
behind
the
plane
of
the
posts
and
then
reinstall
all
the
the
decorative
railings
and
and
decorative
trim
pieces
following
construction
of
that
exterior
wall,
we're
proposing
a
clapboard
wood,
clap
board
painted
to
match
the
existing
wood,
siding
and
then
a
simple
tan,
fiberglass
double
hung
window.
J
The
Anderson
100
series
to
to
match
the
the
general
aesthetic
of
of
the
existing
windows
and
then
we've
basically
stretched
the
windows
from
the
top
of
the
railing
to
the
underside
of
the
trim
and
and
did
a
nice
sort
of
equal
spacing
between
existing
porch
columns
just
to
make
it
feel
as
open
as
possible
and
then
Brian.
We
also
infilled
the
corner
coming
out
of
our
last
meeting
with
additional
Windows
just
to
keep
it
really
open.
J
F
One
thing
I
noticed
in
the
the
historic
survey
sheet
was
this
possible
William
Henry
Miller
building
which
UPS
the
Andy
a
little
bit
I.
Think
if
that's,
if
that's
the
case,.
H
So
I
had
I
had
asked
Brian
that
question
as
well,
and
he
had
reached
out
to
Mary
Tomlin
former
city
historian
and
Architectural
historian
Guru,
and
she
thinks
it's
highly
likely
like
that
yeah
highly
likely
because
it
was
it,
was
built
for
Miller's
design
partner
who
lived
in
it.
Oh.
J
H
B
That's
a
major
concern,
also
walking
around
that
neighborhood.
There
are
many
houses
that
have
large
porches
if
we
set
a
precedent
concerning
this,
we're
opening
the
door
to
many
of
these
beautiful
houses
being
significantly
altered
by
imposing
oranges.
If
we're
just
going
by
the
concept
of
maximizing
the
number
of
bedrooms
that
we've
been
having
to
build
it-
and
that's
not
really
our
program
you
to
look
at
that,
but
it's
definitely
our
purview
to
look
at
one.
B
In
fact,
this
is
having
on
this
particular
building
and
also
what
effect
we
could
have
on
the
neighborhood
itself
and
the
long-term
evolution
in
there
before,
and
that
would
be
my
main
concern.
H
I
was
concerned
also
that
this
is
on
a
primary
facade
and,
while
I
do
appreciate
that
bushes
are
currently
High,
the
pictures
that
has
you
know
historic
pictures
from
the
survey.
The
bushes
were
actually
still
in
place,
but
they
were
cut
much
lower,
I
mean
I,
don't
think
you
can.
H
H
The
the
fact
that
it's
on
primary
facade
made
a
huge
difference
to
me
I
would
be
highly
reluctant
Henry
Miller
architect,
aside
on
I,
mean
I,
think
that
makes
it
this
is
far
more
significant
of
a
resource
as
a
property,
but
the
fact
that
it's
on
a
primary
facade
enclosing
a
porch
one,
that's
so
character
defined
into
this
type
of
design
as
well.
H
I
I,
it
would
be
a
hard
sell
if
it
was
on
the
rear
portion
and
not
visible
from
the
street.
I
think
it'd
be
a
very
different
situation.
H
I
had
a
lot
more
Flex
I
feel
a
lot
more
flexible
with
alterations
that
are
that
are
effectively
screened
permanently
by
architecture
for
the
most
part,
even
though
DS
architecture
can
unfortunately
be
lost,
but
this
is
a
it's
a
phenomenal
design
of
the
house
and
I.
Don't
think
the
justification,
although
I
can
appreciate
a
property
owner's
desire
to
do
it,
I
don't
think
it
justifies
to,
in
this
particular
case.
H
E
J
Yeah
we
had
had
a
little
miscommunication
there
and
you
know
by
the
time
I
caught
it.
We
were
trying
to
get
there
Friday
morning,
but
then
it
was
closed
for
Veterans
Day.
So
we
kind
of
got
stuck
and
didn't
end
up
getting
the
posting
out
until
Monday
morning.
So
I
apologize
for
that.
That
was
that
was
totally
on
me.
I
I
just
missed
a
email
from
Brian
on
Wednesday
to
get
it
up
Thursday
morning,
and
so
we
kind
of
missed
the
day
there
that
stretch
to
Monday.
J
A
B
H
G
E
There
have
been
situations
in
the
past
where
a
sign
has
gone
up
a
day
or
two
late,
and
the
commission
has
felt
that
that
was
adequate,
so,
except
for
the
commission,
because
there
are
there,
there
seems
to
be
some
really
strong
feelings
about
this
project,
and
perhaps
additional
information
about
precedent.
Foreign
closing,
portraits
might
be
helpful.
E
Tabling
might
be
the
best
solution,
not
that
I
am
suggesting
One
Direction
or
another,
but
there
are
examples
of
primary
facade
Portugues
that
have
been
enclosed
in
historic
districts
and
you
would
like
we
can
put
together
a
package
for
you
to
look
at
if
we
table
it
next
time
we
see
how
those
purchase
were
handled
and
the
president
that.
H
They
may
or
may
not
have
said,
I
think
it
would
also
be
helpful
if
Mary
Tomlin,
who
is
an
alternate
on
a
board
if,
if
she,
if
you
could
share
that
information
with
the
rest
of
the
commission
or
if
she
has
any
additional
information,
I
think
that
that
would
be
useful
as
well,
because
I
think
that
for
this
project
in
particular,
that
would
be
a.
A
I
would
also
agree
that
we
should
have
some
kind
of
president
to
see
what's
been
done
in
the
past,
because
I
would
have
automatically
said.
I,
don't
think.
F
Before
we
totally
table
that
for
tonight,
but
maybe
we
might,
we
should
let
him
know
that
the
the
Anderson
100
series
windows
that
are
proposed
our
marginal,
we
usually
don't
allow
composite
composite
replacement
windows,
prefer
other
materials.
The
100
series
proposed,
or
a
five
reps
material,
which
is
like
pieces
of
vinyl,
a
piece
of
sawdust
and
glue
mixed
together,
and
it's
not,
and
we
would
need
at
least
a
cut
sheet
to
show
the
profiles
Etc,
because
yeah.
J
F
I
J
I
F
J
You
know
in
terms
of
Precedence,
we
had
sort
of
been
looking
to
the
Argos
in
as
a
sort
of
Precedence
for
how
to
treat
historic
portion
fill.
You
know
they
had
kind
of
kept
the
existing
Port
structure
intact
and
had
had
made
the
the
infill
as
glassy
as
possible
and
tried
to
keep
some
of
the
existing
railing
elements.
J
So
we
were
sort
of
looking
to
that
which
I'm
sure
you
all
are
probably
familiar
with,
as
as
one
of
the
the
the
Precedence
that
we
were
taking
inspiration
from,
but
we
could
put
more
material
together.
J
You
know
I'm,
just
I'm
wondering
how
much
the
you
know.
The
Willing
of
William
Henry
Miller
was
news
to
us
which
I
you
know,
understand
s,
weight
and
extra
consideration
to
the
project,
but
I
know
Charlie
and
Charlie
I,
don't
know
if
you
want
to
chime
in
here.
In
terms
of
you
know
your
timeline
and
sort
of
information,
you
need
yeah
I,
don't
know
where
I'm
going
with
that,
but
yeah
feel
free
to
chime
in
Charlie.
I
F
F
Detailing
I.
G
F
You
want
to
try
to
detail
so
like
as
little
like
wall
as
possible
in
there,
so
maybe
like
zero
collaborator.
Do
it
all
with
trim
or
something
yeah?
That's
a
that's
going
to
be
might
be
going
even
wider
Windows,
but
just
I
think
that
those
little
strips
of
wall
there
between
them
make
it
look
less
like
a
porch
and
more
like
women.
Civil
law.
J
Yeah,
that's
good
feedback
Steve.
We
could
try
to
use
either
like
a
double
window.
That's
that's
Factory,
mold,
that
sort
of
stretches
the
whole
opening
between
the
posts,
there's
sort
of
and
then
and
then
maybe
even
drop
them
below
the
handrail
line.
There's
solid
railing
panels
that
then
you
know
the
existing
wall
could
sort
of
hide
behind
those.
J
F
F
F
F
The
house
has
been
replaced
with
a
vinyl
replacement
windows
between
the
glass
and
I
was
curious
when
that
all
happened,
because
the
survey
sheet
from
1979
doesn't
have
that
and
the
other
one
is.
If
you
go
to
the
East
Elevation
there's
one
Dormer
and
if
you
look
now
there
are
two
Dormers.
So
at
some
point
a
dormer
was
added
between
the
1979
and
now
over.
The
stairs
on
the
northeast
corner
and
I
just
wanted
to
observe
that
I'm
just
curious
when
that
might
have
happened.
E
Meeting
so
I
cannot
speak
to
the
Dormer,
but
I
will
look
into
that
and
the
windows
have
been
noted
and
are
being
addressed.
B
J
Can
I
ask
a
quick
question?
Is
there
like
any
well
actually
never
mind
I,
take
that
back.
E
I
received
no
no
one
registered
to
speak
and
I
received.
You
know
written
comments.
There
is
a
member
of
the
public
I'm
just
here
to
observe
so
there
aren't.
There
is
no
one
here
to
address
the
commission
and
there
are
no
written.
E
District,
this
is
this
is
another
advisory
review
and
there's
not
really
much
to
review,
because
the
applicant
has
invited
a
lot
of
information
to
the
zoning
administrator.
E
The
project
as
she
understands
it,
is
a
variance
for
a
parking
requirement
in
the
East
Hill
historic
district.
The
property
owner
currently
runs
three
parking
spaces
from
a
lot
on
tried
and
road
to
fulfill
their
required
parking
requirements
due
to
changes
resulting
from
covid
and
a
lot
of
people
working
from
home.
This
employer
no
longer
feels
that
those
three
parking
spaces
are
necessary
and
in
Seeking,
a
variance
for
that
requirement.
F
G
E
So
with
that,
I
will
send
a
brief
message
to
the
zoning
administrator,
letting
her
know
that
the
commission
is
supportive
of
the
variance
requests
because
it
refuses
the
required
number
of
parking
spaces
in
the
east
coast.
Historic.
A
G
B
Right
next,
we
have
approval
early
minutes,
October
18,
2020
Jones
did
not
due
to
some
unexpected
events
did
not
get
out,
and
so
they
will
be
available
next
month.
C
E
So
I
will
send
her
a
message
and
let
her
know
that
the
iltc
members
have
not
received
their
notice
about
their
annual
sexual
harassment.
Prevention.
A
F
Two
years
yet
it
was
the
same
thing,
but
it's
a
it's.
I
E
Were
required
through
your
employer
to
take
sexual
harassment
prevention
training,
you
can
submit
the
certificate
that
you're
issued
by
your
employer
so
that
you
do
not
have
to
take
a
training
again
to
serve
on
your
commission.